Informs That Deletion of Short Duration Data Re Application of Arrehenious Methodology Evaluated & Equipment Found Qualified in Response to NRC 851119-21 Audit of Environ Qualification Program
ML18019A502
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/23/1985
From: CUTTER A B
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
NLS-85-462, NUDOCS 8512310271
Download: ML18019A502 (6)


Text

O/~c ACCESbION NBR: FAC IL: 50-400 AUTH.NAME CUTTERS A.B.REC IP.NAME DENTONp H.R.REQULATO NFORMATI ON DISTR I BUT I'ON'TEM (R IDS)8512310271 DOC.DATE: 85/12/23 NOTAR I ZED-NO DOCKET Shearon Harris Nuclear Power Plant>Unit ii Carolina 05000400 AUTHOR AFFILIATION Carolina Po~er h Light Co.RECIPIENT AFFILIATION Office of Nuclear Reactor Regulati one Director (post 851125

SUBJECT:

Inf orms that deletion of.short, duration data re application of Arrehenious methodology evaluated 5 equipment found qualified in response to NRC 851119-21 audit of environ qual i f i cati on program.DISTRIBUTION CODE: AOAED COPIES RECEIVED: LTR$ENCL 0 EIIE: TITLE: t3R/Licensing Submittal:

Equipment Gualifxcat ion NOTES: RECIP IENT ID CODE/NAME PNR-A PD2 PD 12 15 12 13 INTERNAL: ACRS ELD/HDS1 QC NRR BNR EB NRR PMR-A ADTS-B ADTS REQ FILES 04 COPIES LTTR ENCL REC IP IENT ID CODE/NAME BUCKLEY'S B 01..ADM/LFMB ELD SHIELDSi M NRR BNR ADTS NRR KARSCHz R NRR PNR-A EB NRR PAR-B EB RQN2 COPIES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOTAL NUMBER OF COPIEB REQUIRED: LTTR~ENCL lI%i J~l Carolina Power 8 Light Company SERIAL: NLS-85-062 OEC 2 3 1985 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT NRC AUDIT

Dear Mr.Denton:

On November 19-21, 1985, your Staff audited the Shearon Harris Environmental Qualification Program.We are very pleased that our efforts to produce a good program have not gone unnoticed by the NRC.Mr.Armando Masciantonio, the lead reviewer, indicated during the exit meeting that he considered our program a good program, that things were in good shape, and that every item they reviewed could be considered qualified.

He had two concerns as a result of his review: the application of the Arrehenious methodology, and the need for positive statements in the qualification packages indicating that the equipment is qualified for its application.

The purpose of this letter is to address the resolution of these concerns.Mr.Masciantonio expressed some concerns regarding the application of Arrehenious methodology to extrapolate test data of short duration to show long-term post-accident qualification.

Our program had considered short test times (1 to 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />)combined with post-accident test times of longer duration (50 to 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />)to qualify equipment for long-term post-accident operability.

We have evaluated the deletion of this short duration data and have found no equipment unqualified.

He also indicated that each qualification package should contain a positive statement indicating that the equipment is qualified for its application.

In our judgement, our procedures address this concern since they require the evaluation of plant-specific operability requirements against test results.However, we have no objection to include a positive statement in the packages indicating that the equipment is qualified for its application.

This effort is underway and should be completed by 3anuary 15, 1986.F'DR ggo 1 BSZPP3 P, 851231 027 CK 05000400 (PDR 411 Fayetteville Street~P.O.Box 1551 o Raleigh.N.C.27602

~,'Mr.Harold R.Denton<NLS-85-062/Page 2 We hope that this information is helpful in your'evaluation of the Shearon Harris Environmental Qualification Program.If you have any questions with regard to this issue, please contact Mr.Pedro Salas at (919)836-8015.Yours ery tr ABC/PS/mf (317 I PSA).B.Cutter-Vice Pr ident Nuclear Engineering R Licensing Cco Mr.B.C.Buckley (NRC)Mr.A.Masciantonio (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Dr.3.Nelson Grace (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)

Wake County Public Library Mr.Wells Eddleman Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.3.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)Mr.H.A.Cole,