05000424/LER-1990-011
From kanterella
ML20055C596 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 05/21/1990 |
From: | Hairston W, Odom R GEORGIA POWER CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
ELV-01664, ELV-1664, LER-90-011, LER-90-11, NUDOCS 9005290001 | |
Download: ML20055C596 (5) | |
Similar Documents at Vogtle | |
---|---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20045H9831993-07-16016 July 1993
[Table view]LER 93-004-00:on 930628,steam Flow/Feed Flow Mismatch Alarm Received for SGs 2,3 & 4,resulting in Manual Reactor Trip.Caused by Failure of Main Feedwater Regulating Valve 2 Tracking/Driver Card.Card replaced.W/930716 Ltr ML20045E5161993-06-28028 June 1993 LER 93-003-00:on 930529,found That Room Temperature Readings Were Not Performed Due to Missed TS Surveillances.Procedure 14001-2 Was Revised & Personnel disciplined.W/930628 Ltr ML20044E7171993-05-18018 May 1993 LER 93-007-00:on 930425,manual Reactor Trip During Low Power Physics Testing Due to Negative Reactivity.Caused by Personnel Error.Reactor Engineer Counseled Re Importance of Attention to detail.W/930518 Ltr ML20044F5741993-05-17017 May 1993 LER 93-006-00:on 930418,safety Injection Initiated During Slave Relay Testing.Caused by Personnel Error.Team Reminded to Request Assistance When Operational Questions Arise.W/ 930517 Ltr ML20029C3571991-03-21021 March 1991 LER 91-006-00:on 910223,failure of Temperature Channel Circuit Card During Ni Surveillance Causes Reactor Trip. Caused by Trip of Protection Channel I Bistables.Loop 1 T-hot NRA Card replaced.W/910321 Ltr ML20029B1431991-02-28028 February 1991 LER 91-003-00:on 910129,Diesel Generator 2A & 2B Experienced Valid Failures During Testing.Cause of Failures Under investigation.K4 Transfer Relays Replaced & Relay Contacts on Diesel Generator 1A tested.W/910228 Ltr ML20029A6821991-02-25025 February 1991 LER 91-002-00:on 910204,during Surveillance Testing of Train B Safeguards Tests Cabinet,Slave Relay Energized,Causing Steam Inlet Valve to turbine-driven Auxiliary Pump to Open. Caused by Personnel Error.Personnel counseled.W/910225 Ltr ML20028G9131990-09-24024 September 1990 LER 90-011-00:on 900830,containment Ventilation Isolation Occurred.Caused by Failure of Random Access Memory (RAM) Circuit Board in Data Processing Module.Failed RAM Board Replaced & Returned to Vendor for analysis.W/900924 Ltr ML20043G4211990-06-15015 June 1990 LER 90-001-01:on 900103,misleading Task Sheet Leads to Inadequate Tech Spec Surveillances Found.Caused by Deficient Technical Review of Rev to Sts.Personnel Involved Counseled Re Importance of Reviewing Procedure carefully.W/900615 Ltr ML20043G1421990-06-0505 June 1990 LER 90-007-00:on 900506,control Room Operators Received Trouble Alarms Indicating Closure of MSIV 2HV-30264 & Steam Generator 3 Low Level Water Level.Caused by Relay Failure. Failed Relay Replaced & MSIV tested.W/900605 Ltr ML20043C3311990-05-29029 May 1990 LER 90-006-00:on 900501,data Processing Module Was Taken to Purge Which Rendered Both Monitors 2RE-2562C & 2RE-2562A Inoperable.Caused by Personnel Error.Memo Issued to Chemistry Dept Personnel Re Appropriate action.W/900529 Ltr ML20043C3231990-05-27027 May 1990 LER 90-005-00:on 900427 & 29,computer Point FO-424A Discovered to Be Reading Lower than Control Board Indications.Caused by Intermittent Failure of Computer. Computer Input Card replaced.W/900529 Ltr ML20042G7431990-05-11011 May 1990 LER 90-004-00:on 900411,power Range Calorimetric Channel Calibr Not Performed.Caused by Cognitive Personnel Error. Unit Shift Supervisor Counseled Re Importance of Complying W/Tech Specs.W/900511 Ltr ML20042G7381990-05-11011 May 1990 LER 90-009-00:on 900413,inadvertent Feedwater Isolation Occurred.Caused by Procedural Inadequacy.Procedure Revised to Have Input Error Inhibit Switch Placed in Normal First & Reinstate Block on Feedwater Isolation signal.W/900511 Ltr ML20042G7321990-05-11011 May 1990 LER 90-010-00:on 900418,oncoming Shift Supervisor Found That Containment Level C Temp Improperly Recorded.Caused by Data Being Recorded & Reviewed from Malfunctioning Indication.Individuals counseled.W/900511 Ltr ML20042E1731990-04-11011 April 1990 LER 90-005-00:on 900314,observed That Indicator Lights for Actuation Handswitches for Trains a & B of Fuel Handling Bldg Showed Actuation Occurred.Caused by Personnel Error. Operator counseled.W/900411 Ltr ML20012D8131990-03-23023 March 1990 LER 90-003-00:on 900223,discovered 16 Transformer Core Clamp Bolts Missing on Seismically Qualified Switchgear. Caused by Installation Error During Const Phase of Plant. Missing Clamps replaced.W/900323 Ltr ML20012D9991990-03-23023 March 1990 LER 90-004-00:on 900301,failure to Comply W/Tech Spec 3.0.4 Occurred on Entry Into Mode 6.Caused by Cognitive Personnel Error.Util Complied W/Action Requirements for Tech Spec 3.9.2.W/900323 Ltr ML20012D6591990-03-16016 March 1990 LER 90-002-00:on 900215,discovered That Train C Auxiliary Feedwater Sys Actuation Relay K266 Improperly Tested.On 900216,discovered That Automatic Diesel Generator Electrical Trip Not Tested.Testing performed.W/900316 Ltr ML20011F5501990-02-23023 February 1990 LER 90-001-00:on 900124,reactor Tripped When MSIV Failed to Reopen Automatically at 10% Closed Position,As Designed & Indicator Illuminated & Position Indication Lost.Caused by Failed Fuses.Fuses Replaced & Switch adjusted.W/900223 Ltr ML20042D3571990-01-0202 January 1990 LER 89-019-00:on 891206,discovered That Tech Specs Violated Due to Foreman Approving Measurements of Cell Recorded as 2.10 V on 891122.Caused by Personnel Error & Inadequate Procedure.Foreman counseled.W/900102 Ltr ML19354D7421989-12-22022 December 1989 LER 89-031-00:on 891202,moisture Separator Reheater (MSR) Level Reached High Level Setpoint Giving Turbine/Reactor Trip.Caused by Personnel Error.Actuator Reinstalled W/ Actuator Piston Correctly aligned.W/891222 Ltr ML20011D8811989-12-21021 December 1989 LER 89-020-00:on 891211,power Removed from Radiation Monitor Before Lifting Leads to ESF Actuation Circuits.Caused by Cognitive Personnel Error & Failure to Follow Procedure. Technician Disciplined.Esf Provisions planned.W/891221 Ltr ML20011D4201989-12-19019 December 1989 LER 89-030-00:on 891126,containment Ventilation Isolation Initiated When Remote/Bypass Switch Moved to Remote Position.Caused by Personnel Error & Inadequate Procedure.Technician counseled.W/891219 Ltr ML19332E7991989-12-0404 December 1989 LER 89-029-00:on 891105,heater Drain Tank High Level Dump Valve 2LV-4333 Isolated from Heater Drain Tank,Causing Steam & Water to Escape from Packing & Reactor Trip.Caused by Failure to Maintain Steam Generator level.W/891204 Ltr ML19332E6111989-11-30030 November 1989 LER 87-005-06:on 870406,containment Isolation Actuation & Containment Ventilation Isolation Actuation Occurred.Caused by Spurious Signals from High Range Radiation Monitor. Circuit Setpoints to Be increased.W/891130 Ltr ML19327C2651989-11-14014 November 1989 LER 89-028-00:on 891016,while Replacing Faulty Circuit Board,Power Cable & Arcing Occurred at Terminal Connection, Resulting in Containment Ventilation Isolation.Caused by Inadequate Design.Longer Block Screw installed.W/891114 Ltr ML19324C2051989-11-10010 November 1989 LER 88-047-00:on 880614,handswitches for Manual Actuation of Containment & Containment Ventilation Isolation Tested.On 891013,handswitches Disabled.Caused by Test Procedure Error.Procedures Re Manual Actuation revised.W/891110 Ltr ML19327B7341989-11-0303 November 1989 LER 89-027-00:on 891011,automatic Reactor Trip Occurred W/Reactor in Stable Operation at 58% Rated Thermal Power. Caused by Dropped Rod Due to Diode Failure.Diode for Rod K-2 replaced.W/891103 Ltr ML19325E8191989-10-31031 October 1989 LER 88-035-01:on 881113,momentary Loss of Power to Radiation Monitor 1RE-12116 Resulted in Control Room Isolation Actuation.Setpoint Will Be Raised During Next Refueling outage.W/891031 Ltr ML19324B5121989-10-30030 October 1989 LER 89-018-00:on 891002,steam Generator 1 Train a MSIV Failed to Close,Resulting in Automatic Reactor Trip.Caused by Blown Fuse in Control Logic Power Supply.Grounding Corrected & Limit Switch & Fuse replaced.W/891030 Ltr ML19327A8121989-10-13013 October 1989 LER 87-082-01:on 890620,discovered That Reactor Trip Breaker Had Been swapped-out on 871017 W/O Performing Response Time Test for Breaker Being Installed.Caused by Procedural Inadequacy.Procedure revised.W/891013 Ltr 1993-07-16 Category:RO) MONTHYEARML20045H9831993-07-16016 July 1993
[Table view]LER 93-004-00:on 930628,steam Flow/Feed Flow Mismatch Alarm Received for SGs 2,3 & 4,resulting in Manual Reactor Trip.Caused by Failure of Main Feedwater Regulating Valve 2 Tracking/Driver Card.Card replaced.W/930716 Ltr ML20045E5161993-06-28028 June 1993 LER 93-003-00:on 930529,found That Room Temperature Readings Were Not Performed Due to Missed TS Surveillances.Procedure 14001-2 Was Revised & Personnel disciplined.W/930628 Ltr ML20044E7171993-05-18018 May 1993 LER 93-007-00:on 930425,manual Reactor Trip During Low Power Physics Testing Due to Negative Reactivity.Caused by Personnel Error.Reactor Engineer Counseled Re Importance of Attention to detail.W/930518 Ltr ML20044F5741993-05-17017 May 1993 LER 93-006-00:on 930418,safety Injection Initiated During Slave Relay Testing.Caused by Personnel Error.Team Reminded to Request Assistance When Operational Questions Arise.W/ 930517 Ltr ML20029C3571991-03-21021 March 1991 LER 91-006-00:on 910223,failure of Temperature Channel Circuit Card During Ni Surveillance Causes Reactor Trip. Caused by Trip of Protection Channel I Bistables.Loop 1 T-hot NRA Card replaced.W/910321 Ltr ML20029B1431991-02-28028 February 1991 LER 91-003-00:on 910129,Diesel Generator 2A & 2B Experienced Valid Failures During Testing.Cause of Failures Under investigation.K4 Transfer Relays Replaced & Relay Contacts on Diesel Generator 1A tested.W/910228 Ltr ML20029A6821991-02-25025 February 1991 LER 91-002-00:on 910204,during Surveillance Testing of Train B Safeguards Tests Cabinet,Slave Relay Energized,Causing Steam Inlet Valve to turbine-driven Auxiliary Pump to Open. Caused by Personnel Error.Personnel counseled.W/910225 Ltr ML20028G9131990-09-24024 September 1990 LER 90-011-00:on 900830,containment Ventilation Isolation Occurred.Caused by Failure of Random Access Memory (RAM) Circuit Board in Data Processing Module.Failed RAM Board Replaced & Returned to Vendor for analysis.W/900924 Ltr ML20043G4211990-06-15015 June 1990 LER 90-001-01:on 900103,misleading Task Sheet Leads to Inadequate Tech Spec Surveillances Found.Caused by Deficient Technical Review of Rev to Sts.Personnel Involved Counseled Re Importance of Reviewing Procedure carefully.W/900615 Ltr ML20043G1421990-06-0505 June 1990 LER 90-007-00:on 900506,control Room Operators Received Trouble Alarms Indicating Closure of MSIV 2HV-30264 & Steam Generator 3 Low Level Water Level.Caused by Relay Failure. Failed Relay Replaced & MSIV tested.W/900605 Ltr ML20043C3311990-05-29029 May 1990 LER 90-006-00:on 900501,data Processing Module Was Taken to Purge Which Rendered Both Monitors 2RE-2562C & 2RE-2562A Inoperable.Caused by Personnel Error.Memo Issued to Chemistry Dept Personnel Re Appropriate action.W/900529 Ltr ML20043C3231990-05-27027 May 1990 LER 90-005-00:on 900427 & 29,computer Point FO-424A Discovered to Be Reading Lower than Control Board Indications.Caused by Intermittent Failure of Computer. Computer Input Card replaced.W/900529 Ltr ML20042G7431990-05-11011 May 1990 LER 90-004-00:on 900411,power Range Calorimetric Channel Calibr Not Performed.Caused by Cognitive Personnel Error. Unit Shift Supervisor Counseled Re Importance of Complying W/Tech Specs.W/900511 Ltr ML20042G7381990-05-11011 May 1990 LER 90-009-00:on 900413,inadvertent Feedwater Isolation Occurred.Caused by Procedural Inadequacy.Procedure Revised to Have Input Error Inhibit Switch Placed in Normal First & Reinstate Block on Feedwater Isolation signal.W/900511 Ltr ML20042G7321990-05-11011 May 1990 LER 90-010-00:on 900418,oncoming Shift Supervisor Found That Containment Level C Temp Improperly Recorded.Caused by Data Being Recorded & Reviewed from Malfunctioning Indication.Individuals counseled.W/900511 Ltr ML20042E1731990-04-11011 April 1990 LER 90-005-00:on 900314,observed That Indicator Lights for Actuation Handswitches for Trains a & B of Fuel Handling Bldg Showed Actuation Occurred.Caused by Personnel Error. Operator counseled.W/900411 Ltr ML20012D8131990-03-23023 March 1990 LER 90-003-00:on 900223,discovered 16 Transformer Core Clamp Bolts Missing on Seismically Qualified Switchgear. Caused by Installation Error During Const Phase of Plant. Missing Clamps replaced.W/900323 Ltr ML20012D9991990-03-23023 March 1990 LER 90-004-00:on 900301,failure to Comply W/Tech Spec 3.0.4 Occurred on Entry Into Mode 6.Caused by Cognitive Personnel Error.Util Complied W/Action Requirements for Tech Spec 3.9.2.W/900323 Ltr ML20012D6591990-03-16016 March 1990 LER 90-002-00:on 900215,discovered That Train C Auxiliary Feedwater Sys Actuation Relay K266 Improperly Tested.On 900216,discovered That Automatic Diesel Generator Electrical Trip Not Tested.Testing performed.W/900316 Ltr ML20011F5501990-02-23023 February 1990 LER 90-001-00:on 900124,reactor Tripped When MSIV Failed to Reopen Automatically at 10% Closed Position,As Designed & Indicator Illuminated & Position Indication Lost.Caused by Failed Fuses.Fuses Replaced & Switch adjusted.W/900223 Ltr ML20042D3571990-01-0202 January 1990 LER 89-019-00:on 891206,discovered That Tech Specs Violated Due to Foreman Approving Measurements of Cell Recorded as 2.10 V on 891122.Caused by Personnel Error & Inadequate Procedure.Foreman counseled.W/900102 Ltr ML19354D7421989-12-22022 December 1989 LER 89-031-00:on 891202,moisture Separator Reheater (MSR) Level Reached High Level Setpoint Giving Turbine/Reactor Trip.Caused by Personnel Error.Actuator Reinstalled W/ Actuator Piston Correctly aligned.W/891222 Ltr ML20011D8811989-12-21021 December 1989 LER 89-020-00:on 891211,power Removed from Radiation Monitor Before Lifting Leads to ESF Actuation Circuits.Caused by Cognitive Personnel Error & Failure to Follow Procedure. Technician Disciplined.Esf Provisions planned.W/891221 Ltr ML20011D4201989-12-19019 December 1989 LER 89-030-00:on 891126,containment Ventilation Isolation Initiated When Remote/Bypass Switch Moved to Remote Position.Caused by Personnel Error & Inadequate Procedure.Technician counseled.W/891219 Ltr ML19332E7991989-12-0404 December 1989 LER 89-029-00:on 891105,heater Drain Tank High Level Dump Valve 2LV-4333 Isolated from Heater Drain Tank,Causing Steam & Water to Escape from Packing & Reactor Trip.Caused by Failure to Maintain Steam Generator level.W/891204 Ltr ML19332E6111989-11-30030 November 1989 LER 87-005-06:on 870406,containment Isolation Actuation & Containment Ventilation Isolation Actuation Occurred.Caused by Spurious Signals from High Range Radiation Monitor. Circuit Setpoints to Be increased.W/891130 Ltr ML19327C2651989-11-14014 November 1989 LER 89-028-00:on 891016,while Replacing Faulty Circuit Board,Power Cable & Arcing Occurred at Terminal Connection, Resulting in Containment Ventilation Isolation.Caused by Inadequate Design.Longer Block Screw installed.W/891114 Ltr ML19324C2051989-11-10010 November 1989 LER 88-047-00:on 880614,handswitches for Manual Actuation of Containment & Containment Ventilation Isolation Tested.On 891013,handswitches Disabled.Caused by Test Procedure Error.Procedures Re Manual Actuation revised.W/891110 Ltr ML19327B7341989-11-0303 November 1989 LER 89-027-00:on 891011,automatic Reactor Trip Occurred W/Reactor in Stable Operation at 58% Rated Thermal Power. Caused by Dropped Rod Due to Diode Failure.Diode for Rod K-2 replaced.W/891103 Ltr ML19325E8191989-10-31031 October 1989 LER 88-035-01:on 881113,momentary Loss of Power to Radiation Monitor 1RE-12116 Resulted in Control Room Isolation Actuation.Setpoint Will Be Raised During Next Refueling outage.W/891031 Ltr ML19324B5121989-10-30030 October 1989 LER 89-018-00:on 891002,steam Generator 1 Train a MSIV Failed to Close,Resulting in Automatic Reactor Trip.Caused by Blown Fuse in Control Logic Power Supply.Grounding Corrected & Limit Switch & Fuse replaced.W/891030 Ltr ML19327A8121989-10-13013 October 1989 LER 87-082-01:on 890620,discovered That Reactor Trip Breaker Had Been swapped-out on 871017 W/O Performing Response Time Test for Breaker Being Installed.Caused by Procedural Inadequacy.Procedure revised.W/891013 Ltr 1993-07-16 Category:TEXT-SAFETY REPORT MONTHYEARML20217K4591999-09-30030 September 1999
[Table view]Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30 |
Event date: | |
---|---|
Report date: | |
4242090011R00 - NRC Website | |
text
|