Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20045H9831993-07-16016 July 1993 LER 93-004-00:on 930628,steam Flow/Feed Flow Mismatch Alarm Received for SGs 2,3 & 4,resulting in Manual Reactor Trip.Caused by Failure of Main Feedwater Regulating Valve 2 Tracking/Driver Card.Card replaced.W/930716 Ltr ML20045E5161993-06-28028 June 1993 LER 93-003-00:on 930529,found That Room Temperature Readings Were Not Performed Due to Missed TS Surveillances.Procedure 14001-2 Was Revised & Personnel disciplined.W/930628 Ltr ML20044E7171993-05-18018 May 1993 LER 93-007-00:on 930425,manual Reactor Trip During Low Power Physics Testing Due to Negative Reactivity.Caused by Personnel Error.Reactor Engineer Counseled Re Importance of Attention to detail.W/930518 Ltr ML20044F5741993-05-17017 May 1993 LER 93-006-00:on 930418,safety Injection Initiated During Slave Relay Testing.Caused by Personnel Error.Team Reminded to Request Assistance When Operational Questions Arise.W/ 930517 Ltr ML20029C3571991-03-21021 March 1991 LER 91-006-00:on 910223,failure of Temperature Channel Circuit Card During Ni Surveillance Causes Reactor Trip. Caused by Trip of Protection Channel I Bistables.Loop 1 T-hot NRA Card replaced.W/910321 Ltr ML20029B1431991-02-28028 February 1991 LER 91-003-00:on 910129,Diesel Generator 2A & 2B Experienced Valid Failures During Testing.Cause of Failures Under investigation.K4 Transfer Relays Replaced & Relay Contacts on Diesel Generator 1A tested.W/910228 Ltr ML20029A6821991-02-25025 February 1991 LER 91-002-00:on 910204,during Surveillance Testing of Train B Safeguards Tests Cabinet,Slave Relay Energized,Causing Steam Inlet Valve to turbine-driven Auxiliary Pump to Open. Caused by Personnel Error.Personnel counseled.W/910225 Ltr ML20028G9131990-09-24024 September 1990 LER 90-011-00:on 900830,containment Ventilation Isolation Occurred.Caused by Failure of Random Access Memory (RAM) Circuit Board in Data Processing Module.Failed RAM Board Replaced & Returned to Vendor for analysis.W/900924 Ltr ML20043G4211990-06-15015 June 1990 LER 90-001-01:on 900103,misleading Task Sheet Leads to Inadequate Tech Spec Surveillances Found.Caused by Deficient Technical Review of Rev to Sts.Personnel Involved Counseled Re Importance of Reviewing Procedure carefully.W/900615 Ltr ML20043G1421990-06-0505 June 1990 LER 90-007-00:on 900506,control Room Operators Received Trouble Alarms Indicating Closure of MSIV 2HV-30264 & Steam Generator 3 Low Level Water Level.Caused by Relay Failure. Failed Relay Replaced & MSIV tested.W/900605 Ltr ML20043C3311990-05-29029 May 1990 LER 90-006-00:on 900501,data Processing Module Was Taken to Purge Which Rendered Both Monitors 2RE-2562C & 2RE-2562A Inoperable.Caused by Personnel Error.Memo Issued to Chemistry Dept Personnel Re Appropriate action.W/900529 Ltr ML20043C3231990-05-27027 May 1990 LER 90-005-00:on 900427 & 29,computer Point FO-424A Discovered to Be Reading Lower than Control Board Indications.Caused by Intermittent Failure of Computer. Computer Input Card replaced.W/900529 Ltr ML20042G7431990-05-11011 May 1990 LER 90-004-00:on 900411,power Range Calorimetric Channel Calibr Not Performed.Caused by Cognitive Personnel Error. Unit Shift Supervisor Counseled Re Importance of Complying W/Tech Specs.W/900511 Ltr ML20042G7381990-05-11011 May 1990 LER 90-009-00:on 900413,inadvertent Feedwater Isolation Occurred.Caused by Procedural Inadequacy.Procedure Revised to Have Input Error Inhibit Switch Placed in Normal First & Reinstate Block on Feedwater Isolation signal.W/900511 Ltr ML20042G7321990-05-11011 May 1990 LER 90-010-00:on 900418,oncoming Shift Supervisor Found That Containment Level C Temp Improperly Recorded.Caused by Data Being Recorded & Reviewed from Malfunctioning Indication.Individuals counseled.W/900511 Ltr ML20042E1731990-04-11011 April 1990 LER 90-005-00:on 900314,observed That Indicator Lights for Actuation Handswitches for Trains a & B of Fuel Handling Bldg Showed Actuation Occurred.Caused by Personnel Error. Operator counseled.W/900411 Ltr ML20012D8131990-03-23023 March 1990 LER 90-003-00:on 900223,discovered 16 Transformer Core Clamp Bolts Missing on Seismically Qualified Switchgear. Caused by Installation Error During Const Phase of Plant. Missing Clamps replaced.W/900323 Ltr ML20012D9991990-03-23023 March 1990 LER 90-004-00:on 900301,failure to Comply W/Tech Spec 3.0.4 Occurred on Entry Into Mode 6.Caused by Cognitive Personnel Error.Util Complied W/Action Requirements for Tech Spec 3.9.2.W/900323 Ltr ML20012D6591990-03-16016 March 1990 LER 90-002-00:on 900215,discovered That Train C Auxiliary Feedwater Sys Actuation Relay K266 Improperly Tested.On 900216,discovered That Automatic Diesel Generator Electrical Trip Not Tested.Testing performed.W/900316 Ltr ML20011F5501990-02-23023 February 1990 LER 90-001-00:on 900124,reactor Tripped When MSIV Failed to Reopen Automatically at 10% Closed Position,As Designed & Indicator Illuminated & Position Indication Lost.Caused by Failed Fuses.Fuses Replaced & Switch adjusted.W/900223 Ltr ML20042D3571990-01-0202 January 1990 LER 89-019-00:on 891206,discovered That Tech Specs Violated Due to Foreman Approving Measurements of Cell Recorded as 2.10 V on 891122.Caused by Personnel Error & Inadequate Procedure.Foreman counseled.W/900102 Ltr ML19354D7421989-12-22022 December 1989 LER 89-031-00:on 891202,moisture Separator Reheater (MSR) Level Reached High Level Setpoint Giving Turbine/Reactor Trip.Caused by Personnel Error.Actuator Reinstalled W/ Actuator Piston Correctly aligned.W/891222 Ltr ML20011D8811989-12-21021 December 1989 LER 89-020-00:on 891211,power Removed from Radiation Monitor Before Lifting Leads to ESF Actuation Circuits.Caused by Cognitive Personnel Error & Failure to Follow Procedure. Technician Disciplined.Esf Provisions planned.W/891221 Ltr ML20011D4201989-12-19019 December 1989 LER 89-030-00:on 891126,containment Ventilation Isolation Initiated When Remote/Bypass Switch Moved to Remote Position.Caused by Personnel Error & Inadequate Procedure.Technician counseled.W/891219 Ltr ML19332E7991989-12-0404 December 1989 LER 89-029-00:on 891105,heater Drain Tank High Level Dump Valve 2LV-4333 Isolated from Heater Drain Tank,Causing Steam & Water to Escape from Packing & Reactor Trip.Caused by Failure to Maintain Steam Generator level.W/891204 Ltr ML19332E6111989-11-30030 November 1989 LER 87-005-06:on 870406,containment Isolation Actuation & Containment Ventilation Isolation Actuation Occurred.Caused by Spurious Signals from High Range Radiation Monitor. Circuit Setpoints to Be increased.W/891130 Ltr ML19327C2651989-11-14014 November 1989 LER 89-028-00:on 891016,while Replacing Faulty Circuit Board,Power Cable & Arcing Occurred at Terminal Connection, Resulting in Containment Ventilation Isolation.Caused by Inadequate Design.Longer Block Screw installed.W/891114 Ltr ML19324C2051989-11-10010 November 1989 LER 88-047-00:on 880614,handswitches for Manual Actuation of Containment & Containment Ventilation Isolation Tested.On 891013,handswitches Disabled.Caused by Test Procedure Error.Procedures Re Manual Actuation revised.W/891110 Ltr ML19327B7341989-11-0303 November 1989 LER 89-027-00:on 891011,automatic Reactor Trip Occurred W/Reactor in Stable Operation at 58% Rated Thermal Power. Caused by Dropped Rod Due to Diode Failure.Diode for Rod K-2 replaced.W/891103 Ltr ML19325E8191989-10-31031 October 1989 LER 88-035-01:on 881113,momentary Loss of Power to Radiation Monitor 1RE-12116 Resulted in Control Room Isolation Actuation.Setpoint Will Be Raised During Next Refueling outage.W/891031 Ltr ML19324B5121989-10-30030 October 1989 LER 89-018-00:on 891002,steam Generator 1 Train a MSIV Failed to Close,Resulting in Automatic Reactor Trip.Caused by Blown Fuse in Control Logic Power Supply.Grounding Corrected & Limit Switch & Fuse replaced.W/891030 Ltr ML19327A8121989-10-13013 October 1989 LER 87-082-01:on 890620,discovered That Reactor Trip Breaker Had Been swapped-out on 871017 W/O Performing Response Time Test for Breaker Being Installed.Caused by Procedural Inadequacy.Procedure revised.W/891013 Ltr 1993-07-16
[Table view] Category:RO)
MONTHYEARML20045H9831993-07-16016 July 1993 LER 93-004-00:on 930628,steam Flow/Feed Flow Mismatch Alarm Received for SGs 2,3 & 4,resulting in Manual Reactor Trip.Caused by Failure of Main Feedwater Regulating Valve 2 Tracking/Driver Card.Card replaced.W/930716 Ltr ML20045E5161993-06-28028 June 1993 LER 93-003-00:on 930529,found That Room Temperature Readings Were Not Performed Due to Missed TS Surveillances.Procedure 14001-2 Was Revised & Personnel disciplined.W/930628 Ltr ML20044E7171993-05-18018 May 1993 LER 93-007-00:on 930425,manual Reactor Trip During Low Power Physics Testing Due to Negative Reactivity.Caused by Personnel Error.Reactor Engineer Counseled Re Importance of Attention to detail.W/930518 Ltr ML20044F5741993-05-17017 May 1993 LER 93-006-00:on 930418,safety Injection Initiated During Slave Relay Testing.Caused by Personnel Error.Team Reminded to Request Assistance When Operational Questions Arise.W/ 930517 Ltr ML20029C3571991-03-21021 March 1991 LER 91-006-00:on 910223,failure of Temperature Channel Circuit Card During Ni Surveillance Causes Reactor Trip. Caused by Trip of Protection Channel I Bistables.Loop 1 T-hot NRA Card replaced.W/910321 Ltr ML20029B1431991-02-28028 February 1991 LER 91-003-00:on 910129,Diesel Generator 2A & 2B Experienced Valid Failures During Testing.Cause of Failures Under investigation.K4 Transfer Relays Replaced & Relay Contacts on Diesel Generator 1A tested.W/910228 Ltr ML20029A6821991-02-25025 February 1991 LER 91-002-00:on 910204,during Surveillance Testing of Train B Safeguards Tests Cabinet,Slave Relay Energized,Causing Steam Inlet Valve to turbine-driven Auxiliary Pump to Open. Caused by Personnel Error.Personnel counseled.W/910225 Ltr ML20028G9131990-09-24024 September 1990 LER 90-011-00:on 900830,containment Ventilation Isolation Occurred.Caused by Failure of Random Access Memory (RAM) Circuit Board in Data Processing Module.Failed RAM Board Replaced & Returned to Vendor for analysis.W/900924 Ltr ML20043G4211990-06-15015 June 1990 LER 90-001-01:on 900103,misleading Task Sheet Leads to Inadequate Tech Spec Surveillances Found.Caused by Deficient Technical Review of Rev to Sts.Personnel Involved Counseled Re Importance of Reviewing Procedure carefully.W/900615 Ltr ML20043G1421990-06-0505 June 1990 LER 90-007-00:on 900506,control Room Operators Received Trouble Alarms Indicating Closure of MSIV 2HV-30264 & Steam Generator 3 Low Level Water Level.Caused by Relay Failure. Failed Relay Replaced & MSIV tested.W/900605 Ltr ML20043C3311990-05-29029 May 1990 LER 90-006-00:on 900501,data Processing Module Was Taken to Purge Which Rendered Both Monitors 2RE-2562C & 2RE-2562A Inoperable.Caused by Personnel Error.Memo Issued to Chemistry Dept Personnel Re Appropriate action.W/900529 Ltr ML20043C3231990-05-27027 May 1990 LER 90-005-00:on 900427 & 29,computer Point FO-424A Discovered to Be Reading Lower than Control Board Indications.Caused by Intermittent Failure of Computer. Computer Input Card replaced.W/900529 Ltr ML20042G7431990-05-11011 May 1990 LER 90-004-00:on 900411,power Range Calorimetric Channel Calibr Not Performed.Caused by Cognitive Personnel Error. Unit Shift Supervisor Counseled Re Importance of Complying W/Tech Specs.W/900511 Ltr ML20042G7381990-05-11011 May 1990 LER 90-009-00:on 900413,inadvertent Feedwater Isolation Occurred.Caused by Procedural Inadequacy.Procedure Revised to Have Input Error Inhibit Switch Placed in Normal First & Reinstate Block on Feedwater Isolation signal.W/900511 Ltr ML20042G7321990-05-11011 May 1990 LER 90-010-00:on 900418,oncoming Shift Supervisor Found That Containment Level C Temp Improperly Recorded.Caused by Data Being Recorded & Reviewed from Malfunctioning Indication.Individuals counseled.W/900511 Ltr ML20042E1731990-04-11011 April 1990 LER 90-005-00:on 900314,observed That Indicator Lights for Actuation Handswitches for Trains a & B of Fuel Handling Bldg Showed Actuation Occurred.Caused by Personnel Error. Operator counseled.W/900411 Ltr ML20012D8131990-03-23023 March 1990 LER 90-003-00:on 900223,discovered 16 Transformer Core Clamp Bolts Missing on Seismically Qualified Switchgear. Caused by Installation Error During Const Phase of Plant. Missing Clamps replaced.W/900323 Ltr ML20012D9991990-03-23023 March 1990 LER 90-004-00:on 900301,failure to Comply W/Tech Spec 3.0.4 Occurred on Entry Into Mode 6.Caused by Cognitive Personnel Error.Util Complied W/Action Requirements for Tech Spec 3.9.2.W/900323 Ltr ML20012D6591990-03-16016 March 1990 LER 90-002-00:on 900215,discovered That Train C Auxiliary Feedwater Sys Actuation Relay K266 Improperly Tested.On 900216,discovered That Automatic Diesel Generator Electrical Trip Not Tested.Testing performed.W/900316 Ltr ML20011F5501990-02-23023 February 1990 LER 90-001-00:on 900124,reactor Tripped When MSIV Failed to Reopen Automatically at 10% Closed Position,As Designed & Indicator Illuminated & Position Indication Lost.Caused by Failed Fuses.Fuses Replaced & Switch adjusted.W/900223 Ltr ML20042D3571990-01-0202 January 1990 LER 89-019-00:on 891206,discovered That Tech Specs Violated Due to Foreman Approving Measurements of Cell Recorded as 2.10 V on 891122.Caused by Personnel Error & Inadequate Procedure.Foreman counseled.W/900102 Ltr ML19354D7421989-12-22022 December 1989 LER 89-031-00:on 891202,moisture Separator Reheater (MSR) Level Reached High Level Setpoint Giving Turbine/Reactor Trip.Caused by Personnel Error.Actuator Reinstalled W/ Actuator Piston Correctly aligned.W/891222 Ltr ML20011D8811989-12-21021 December 1989 LER 89-020-00:on 891211,power Removed from Radiation Monitor Before Lifting Leads to ESF Actuation Circuits.Caused by Cognitive Personnel Error & Failure to Follow Procedure. Technician Disciplined.Esf Provisions planned.W/891221 Ltr ML20011D4201989-12-19019 December 1989 LER 89-030-00:on 891126,containment Ventilation Isolation Initiated When Remote/Bypass Switch Moved to Remote Position.Caused by Personnel Error & Inadequate Procedure.Technician counseled.W/891219 Ltr ML19332E7991989-12-0404 December 1989 LER 89-029-00:on 891105,heater Drain Tank High Level Dump Valve 2LV-4333 Isolated from Heater Drain Tank,Causing Steam & Water to Escape from Packing & Reactor Trip.Caused by Failure to Maintain Steam Generator level.W/891204 Ltr ML19332E6111989-11-30030 November 1989 LER 87-005-06:on 870406,containment Isolation Actuation & Containment Ventilation Isolation Actuation Occurred.Caused by Spurious Signals from High Range Radiation Monitor. Circuit Setpoints to Be increased.W/891130 Ltr ML19327C2651989-11-14014 November 1989 LER 89-028-00:on 891016,while Replacing Faulty Circuit Board,Power Cable & Arcing Occurred at Terminal Connection, Resulting in Containment Ventilation Isolation.Caused by Inadequate Design.Longer Block Screw installed.W/891114 Ltr ML19324C2051989-11-10010 November 1989 LER 88-047-00:on 880614,handswitches for Manual Actuation of Containment & Containment Ventilation Isolation Tested.On 891013,handswitches Disabled.Caused by Test Procedure Error.Procedures Re Manual Actuation revised.W/891110 Ltr ML19327B7341989-11-0303 November 1989 LER 89-027-00:on 891011,automatic Reactor Trip Occurred W/Reactor in Stable Operation at 58% Rated Thermal Power. Caused by Dropped Rod Due to Diode Failure.Diode for Rod K-2 replaced.W/891103 Ltr ML19325E8191989-10-31031 October 1989 LER 88-035-01:on 881113,momentary Loss of Power to Radiation Monitor 1RE-12116 Resulted in Control Room Isolation Actuation.Setpoint Will Be Raised During Next Refueling outage.W/891031 Ltr ML19324B5121989-10-30030 October 1989 LER 89-018-00:on 891002,steam Generator 1 Train a MSIV Failed to Close,Resulting in Automatic Reactor Trip.Caused by Blown Fuse in Control Logic Power Supply.Grounding Corrected & Limit Switch & Fuse replaced.W/891030 Ltr ML19327A8121989-10-13013 October 1989 LER 87-082-01:on 890620,discovered That Reactor Trip Breaker Had Been swapped-out on 871017 W/O Performing Response Time Test for Breaker Being Installed.Caused by Procedural Inadequacy.Procedure revised.W/891013 Ltr 1993-07-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
. . . . . . -
l l'
- Cite n g., tN nwi ( t.mp,oi, 10 hs.dr r e twi.,e ,
Atlanta L .t, e p 4 ' t yi w..o, c .. 4 m . 1 m,. .
u , o y ua..... ,
de h im. it' r i ..r e.o l 'n > 4 3 g f'i M i ih r , h,i 'i l d if .r tr.ih. o LS b ' '..m:,..o....,'.o.
,y .. .
May 29, 1990 .
W G Hatraton. til
- .. . ..m, o . , . m .. . , __
o ,o... -
.r. . # . " ELV-01700 0398 Docket No. 50-425
=
U. S. Nuclear Regulatory Commission A11N: Document control Desk -
Washington, D. C. 20555 Gentlemen:
V0G1LL ELECTRIC GENERAllNG PL ANT LICENSEE EVENT REPORT
~
COMPUTER POINT FAILURE RESULTS IN EXCEEDING -
))lE REACTOR PCWER LICENSE LIMil In accordance with 10 CFR 50.73, Georgia Power Company hereby submits the -r-enclosed report related to an event which was discovered on April 29, 1990.
Sincerely, i g
y . 4 _,
g (). /0 {<T n > ) 4 "
W. G. Hairston, 111 WGH,lll/NJS/gm
Enclosure:
LER 50-4?5/1990-005 xc: Georata Poxer Company ~
Mr. C. K. McCoy Mr. G. Bockhold, Jr.
Mr. R. M. Odom f Mr. P. D. Rushton NORMS U. S._NucI n r_h gulatorv_0_ommission Mr. S. D. Lbneter, Regional Administrator Mr. 1. A. Reed, Licensing Project Manager, NRR Mr. R. f. Aiello, Senior Resident inspector, Vogtle -
m M
1 lk gg y gh l '
IIbE $^4 { !l 14 i t l' it It[p t 14) , C t [n:
==
7622 -
WRC#sem 3e4 U s NUCLE A2 (Lt EULATORY COMMI&stON APPIOYtb OMS NO 3150o104 LICENSEE EVENT REPORT (LER) 8 ""a 's ' '8' "
DOCKET NuM9t h (2) # AGE 634 8 ACILfiv NAME ill V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 o Is I o Io l o l4 1 25 1 ilo7l0 41 bMPUTERPOINTFAILURERESULTSINEXCEEDIETHEREACTORPOWERLICENSELIMIT tytNT DATEt6) Lipi Nuust m ist htPORT DATE 17e OTHER f ACILITits INVOLVED tel MONTH DAv v t. AR v t A88 f8 MON T H DA% D E A,t 8 AciLiTv hawas DOCRi f NUMeteust 0 15101010 1 I I
~ -
Ol4 2l7 9 0 9l0 0 l0l5 0 l0 d5 2l9 9l0 o isto t o io n I i n,,,,,,,,
tuis RtPont es susMirit0 PunsuaNT to Tut R8ouiREMENis ce io teR t ,cana m e, ,w e, rw ,,u ..,, oi:
" D'
- 1 to aozini to miei so ni.imb.i 73 ?une mi R n .imoi .o mi.im .o nisimi.i n m.i T g,=,,g,,_
"To',' 1 i 0,0 n .o. m H.) Ao mi,lm w ni.im.. i to ao6l alt 196eil 60.73 eH2it61 6 73teH2ilvesiltAl .kv6Al to ao6 sittilm) So.73teH2iteil 60.?31aH2Hedell8l to dalloitt He to.736all2H H 60.73te H2 Hal LICENstl CONTACT 9081 TMts Lim till ,
esAMt TE LEPHONE PiVM9tm Amt A CODI R. M. ODOM, NUCLEAR SAFETY AND COMPLIANCE 404i 8i 2,6, , 3 2,0[1 COMPLtit ONE LINE FOR E ACH COMPONENT f AILURE OfSCRittD IN THis REPORY tt31
" ' Q Cavat svsitu COMPON E NT M'%^C " QU" 'n'h' ' CAust systtM COMPONtNT "'"[g 'C ,D NPR X IDi ECB i i i D Wi l20 i N i i i i l l i i l l I I I I I I I i i i I suPPLIMENT AL REPORT E kPICTID (14 MONTH DAY VtAR
, 'E*ATPN ,"
q ,8, ,, ... ..n.. u nucue sm,ssioN oA n, 3 No l l l
- ..s , R A C, ,o,~, R, , . , , .,,,..~,..,,,,,..,.,,,.,,,,,,n.i l
On 4-29-90, at approximately 1530 CDT, Proteus computer point F0-424A (Steam Generator #2 feedwater flow) was discovered to be reading lower than control board indications. Since this computer point provides input to the computer calculated calorimetric power indication, F0-424A was promptly removed from the Proteus scan. This resulted in an. increase of indicated reactor power to 3411 megawatts thermal (i.e., the maximum power level specified in the Facility Operating License). The power range nuclear instrumentation channels were then adjusted accordingly.
While removal of computer point F0-424A only brought indicated reactor power up to 100% rated thermal power (RTP), a subsequent review of computer data indicated that actual reactor power had slightly exceeded 100% RTP beginning at approximately 2000 CDT on 4-27-90. It is estimated that reactor power averaged 100.5% RTP for a 15 hour1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> interval and a 25 hour2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> interval until discovery of the computer point failure terminated the event.
A computer input card for F0-424A was replaced and the computer point was verified to be indicating correctly. Corrective action to prevent recurrence includes tightening the cluster limit for acceptance of the feedwater flow input values as good data.
l l
l l
")Cy * *'* '**
e - ,
y.A u.. oco mowon co l ,
, 8 MPIRE$ 4/3092 Ws*'A,%'J"8Ein"o"'
- I?"U,' .#"'nY Mt.'AE LICENSEE EVENT REPORT (LER) '
TEXT CONTINUATION *?%",,'."4'.'F. *Z"oi,'J"?'.Mfe'O,'!2 l,".' Oc?M 0?",W " joe"#at .l OF MANAOLMENT AND.!M'.30.ic?"#.#M UDGET WA HINOTDN.DC 20603.
f AclVTV NA 8 411 DOC 9L61 NUndBER (2) ggg gygggg ggg pagg g33
(
VIA" ' ^
u[t'e ' Nefs a
'e'ECP UNIT 2 o p l o j o l o l4 l2 l 5 9l0 -
0l0 l5 -
Op 0l2 or 0 l4 TEXT ta musee mese as neouseet, use as aMar Mtc Fenn As.AW 1171 A. REQUIREMENT FOR REPORT This report is being submitted because the Vogtle Electric Ger> rating Plant. !
Unit 2 Facility Operating License No. NPF-81, section 2.H. requires Georgia Power Company to report violations of the requirements contained in section i 2.C.- License condition 2.C.(1) stipulates that the reactor core power level shall not exceed 3411 megawatts thermal. The failure of a computer point caused the average core thermal power level to slightly exceed 3411 megawatts thermal for greater than an eight hour shift. In accordance with a previously developed Georgia Power Company pos'ition (reference LER 50-424/1987-069-01), this event is considered reportable.
B. UNIT STATUS AT TIME OF EVENT At the time of this event, Unit 2 was in Mode 1 (Power _0peration) at 100% of rated thermal power. Other than that described herein, there was no inoperable equipment which contributed to the occurrence of this event..
C. DESCRIPTION OF EVENT On 4-27-90, an intermittent failure of Proteus aputer point F0-424A (Steam '
Generator #2 feedwater flow) began to occur. Tus failure increased in frequency and gradually resulted in F0-424A reading an average of 200~
kilopounds/ hour (KBH) less than computer point F0-423A (also Steam Generator
- 2 feedwater flow). Since these two computer points are averaged to provide an input value to the reactor thermal power computer point, U1118 (i e.,
computer calculated calorimetric power), this intermittent failure resulted 4 in feedwater flow being underestimated by an average-of 100 KBH. This in '
turn caused the Proteus computer to underestimate reactor power by an average of 0.7%.- Since reactor power is controlled based on the U1118 indication, this resulted in actual reactor power slightly exceeding 100%
rated thermal power beginning at approximately 2000 CDT on 4-27-90.
On 4-29-90, at approximately 1530 CDT, the overpower condition was terminated when computer point F0-424A was discovered to be reading lower than control board indications. Computer point F0-424A was promptly removed from the Proteus scan which resulted in an increase of indicated reactor power to 3411 megawatts thermal. Procedure 14030-2, " Power Range Calorimetric Channel Calibration," was performed and the power range nuclear instrumentation channels (NI's) were adjusted accordingly. A manual calorimetric was also performed per procedure 14030-2 which-validated the accuracy of the Ulll8 indication with the F0-424A input removed.
A subsequent review of computer data indicated that actual reactor power had -
reached a maximum of 100.6% of rated thermal power (3431 megawatts thermal) and had averaged approximately 100.5% for a 15 hour1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> interval and a 25 hour2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> interval during the overpower event.
NRC Penn 3 A (640
. uuuCu Anuou.,On Co.M. t.
ge,,,o.M, , , , , , , , , , , , , , , ;
- EXT 17.E8 4/30/92 f,Un'M#0."as"t",",0li',%O "
j',1' Cf7# ,%"d"'!
LICENSEE EVENT REPCRT (LER)
^
TEXT CONTINUATlON F.,""Rt,'O,",!
Mn AMEN'.M!'c'n,'Ml,*.'$$'N PAPtHWO Rt UCION t 60 $0 i OF MANAGEMENT AND DUDOET. WASHINGTON,DC 20603-F AC4lTY NAME tu DOCKl1 NURSLR 42) LtR NUM38R (.) PAGE (3) vtaa " = P. - "
'JJJ:
VEGP - UNIT 2 T6(T W more apose 4,ogiesel see asluitemet NRC Fem NBOJ lih o ls-l 0 l o o l4 l2 l 5 9l0 -
0l0l 5 -
0l0 q3 or 0l4 D. CAUSE OF EVENT l The direct cause of this event was the intermittent failure of computer point F0-424A. Although the cause for this failure could not be positively identified, a computer input card for F0-424A was replaced and trending of that point indicated _it to be operating correctly.
A contributing cause for this event is the cluster limit established for acceptance of the feedwater flow input values as good data. The present l cluster limit will cause a feedwater flow value to be rejected when it differs from a predetermined value by more than 250 KBH. The value for F0-424A did fall outside of the cluster . limit on several occasions; however, due to the intermittent nature of.the failure, F0-424A was typically not rejected as an input and therefore impacted the Proteus calculated calorimetric.
E. ANALYSIS OF EVENT The subsequent review of computer data demonstrated that none of the reactor trip limits were approached and the reactor safety limits shown in Technical Specification Figure 2.1-1 were not exceeded. Although the licensed power limit was slightly exceeded, this event did not result in the plant being in an unanalyzed condition. The plant was not operated above 102% of rated thermal power. Based on these considerations, there was no adverse effect-l on plant safety or public health and safety as a result of this event.
F. CORRECTIVE ACTIONS
- 1. The computer input card for F0-424A was replaced. I
- 2. The cluster limit for acceptance of tta feedwater flow input values to I the Proteus calculated calorimetric will be made tighter._ This modification is expected to be complete by 7-1-90.
G. ADDITIONAL INFORMATION
- 1. Failed Components Identification F0-424A Computer Analej Input Card Westinghouse QAW Card, located in Proteus Input / Output Cabinet.
l
- NIC Poem 3 A (649)
.. . j
. F9AM,3864 U.S. KUCLE AX kt1ULAihY COMMtGBtON 4 (KPtHES 4/30/92 LICENSEE EVENT REPORT (LER) ISnUA,' o'J'?8'",'C4",oa '5%MIT%cf7.V .To"N."n'r, '*
TEXT CONTINUATION ^
- ,fo'"n'",1,* "l'M%"d 'YN'."!PC'"^'!JP
, u '"' OEf"fA 0?"t^,'a".'Ji"n't'#N"^i=iC?"df##:0?ili OF MANAGEMENT AND DVDOET, WASHINGTON.DC 20603
)
f ACILITY NAast HI DOCKti NUtdStR (2) ggg gygggg ggg pggg gg, vtan .
sagejaatp .y ma]isYo q a VEGP - UNIT 2 0 l51010 l0 l4 l 2l5 9l 0 -
0l0l 5 -
0l0 0l4 or 0l4 TSxT run a w ww-awsoun
- 2. Previous Similar Events A somewhat similar event occurred for Unit 2 on 6-15-89'(reference LER !
when a slight overpower condition was suspected to have 50-425/1989-022) occurred before discovery of a feedwater flow input-error to the Proteus ,
computer. However, the root cause for the feedwater flow input error in j the prior event was different since it involved improper venting of !
sensing lines.
I
- 3. Energy Industry Identification System Codes 3
Reactor Core - AC Feedwater - SJ Plant Computer - ID-i 1
NIC Foren 304A (649)