Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC FORM 195 U.S. NUCLEAR REGULATORY MISSION (2-761 50-25~25 335 FILE NUMBER NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL MONTHLY REPORT USNRC FRoM:Flordia Power. 8 Lioht Co. DATE OF OOCUMENT Miami, Flordia 5-7-76 A.D. Schmidt OATE RECEIVEO CJLETTE R GNOTORIZEO INPUT FORM NUMBER OF COPIES RECEIVEO
)OORIQINAL X3 UN C LASS IF I E O 0 COPY OESCRIPTION LET~re TRANS THE FOLLOWING: MONTHLY REPORT FOR A PLANT & COMPONENT OPERABILITY &
AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT gONOg REMOVE .
NAME: Turkey PT. ¹ 3 8 4 ZCKXO<<<DGED:
St. Lucie ¹ 1 FOR ACTION/INFORMATION MIPC W CYS FO AC ON INTERNAL D IST RI BUTION PD BRANCH CHIEF L EXTERNAL DISTRIBUTION CONTROL NUMBER
~ Ft. Pi c F 744
r.
. ~ .O. BOX 013I00, MIAMI, FLORIDA 3310I Regufatoty il 1 FLORIDA POWER Ei LIGHT COiVIPAiIY Office of Management Xnformation and Program Controls U. S. Nuclea'r Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the, April, 1976 Operating Status Re for Turkey Point, Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, Or DOCKfyg0 U
D. chmidt Vice President Power Resources VTC/pm Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire H E L ii I N G B LI I L 0 P L0 R I O A
~s
~l
'; tI If 1
r I
APPENDIX B AVERAGE DAILY DNZT POWER LEVEL DOCKET No. 50 250 DNIT Turkey Point Unit No.
~ ~ DATE Hay 5, 1976 COPNLETED BY V.
xoNTB April 1976
~ DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAZIY POWER LEVEL (YRc-Nct) (Nwc-Nct) 1 662 17 2 661 18 663
! 670 19 658
~
4 667 20 660 664 21 661 6 665 .22 580 7 663 23 650 8 664 649 9 669 25 623 673 26 650 11 384 '27 649 12 634 28 13 662 29 645 660 30 571 15 623 16 487 NOTE- Daily average power level .
greater than 666 hlHe due to cooler condenser cooling water.
~~
6 A 44RAIJ, '
yY '
4 - C DI A . i OD, IPD, \, II-, DP- Ai PN,P ~A i,= ~ AA'<<
~
~
APPENDIX C OPERATING DATA REPORT P~
~
'I ~
POCEE1'O. 2() -
UNIT Turkey Point Unit No. 3 DATE)iay 52 1976 COMPLETED BY V.T. Chilson TELEPHONE (305) 552 - 3830.
'PERATING STATUS S ~
- 1. REPORTING PERZODQ001 76 04 01 GROSS HOURS ZN REPORTZNG PERIOD: 719.0>
THROUGH 2400 76 04, 30 PAN. DEPEND. CA. ACYYY (NN -N it: 88
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWc-Nct):
4~ REASONS FOR RESTRICTION (ZF ANY):
I
'I THIS MONTH YEAR TO DATE CUMULA ZVE 5~ NUMBER OF HOURS REACTOR WAS CRZTZCALA ~ 718.4 . 2p643.4 '3,923.6
- 6. REACTOR RESERVE SHUTDOWN BOURDON' ~ ~ ~ ~
15.4 18.6
- 7. HOURS GENERATOR ON LINE..... ~ ............ 717.9 2,600.8 22,970.8 0 128(IT R-SERVE SHU Doiv14 HOURS ~ ~ ~ 15.4 8..
9 GROSS SEE)II!AD ENERGY GEEEIIAYED (ISIS)..... 15299161 ~87 87 IANNA
- 10. GROSS ELECTRICAL E11ERGY GENERATED (MWH).. 481 830 1 793,370 13,808,606 NET ELECTRICAL ENERGY GENERATED (MWH).. . 4572957 lp7032726 13p0592488
- 12. REACTOR SERVICE FACTOR ~ ~ 99 ' . 91 ' 80.1 13 REACTOR AVAILABILITYFACTOR...... ~ .. .... 99 9 91.1
- 14. UNIT SEPVZCE FACTOR.. . ....... .... .. 99.8 89. 6 76.9 Ui)1ZT AVAZAZLITY 7 FACTORP ~ ~ ~
~
~ ~ ~ ~ ~
'
~ ~ ~ ~
. 'aa.8 15'6.
U11ZT CAPACITY FACTOR (Using MDC)......... 66.8
- 17. UNIT CAPACITY FACTOR (Using Design YÃc).. 84.7 63.1
- 18. UNIT FORCED OUTAGE RATE. ~ ...... .. ~ ~ ~ .~~~ 0.1 0.2 3 '
19 ~ SHUTDOWNS SCHEDULED OVER NEXT,6 MONTHS (TYPE, DATES AND DURATION 0 EACH):
Refueling, Maintenance, and Inspection.". - October 4 through-Novcnber 1(, 1976' 20 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP.
21i UNITS IN TEST STATUS (PRIOR TO CONA(ERCZAL OPERATION): FORECAST ACHIEVED P
ZNZTZAZ CRITICALITY
~
INITIAL ELECTRICITY
~, ~ COMMERCIAL OPERATION i, ~ ~
<NOTE Changed to D.S.T.E on hpril 25, 1976 i
'1) ~psott VNIT SHUTDOWNS AND POWER REDUCAIONS UNIT NAME Turkev Point Unit Nft At EQUIPHEttT FAILURE (EXPLAIN)
Bt MAItlT, OR TEST . DATE )9m 5, 1976 Ct FZFUEl ItlG ~
Dt PEGVLATORY RESTRICTION COMPLETED BYV.T. Chilson Et OPERATOR TRAINING AND LICEtlSE EXAMINATION (305) 552 3830 Ft ADHItlISTRATIVE TELEPHON.
! G. OPERATIONAL ERROR (EXPLAIN) ARRORP xcars~ar[1 1976 Ht OTHER (EXPLAIN) l
, (2) METHOD HETHOD OF 1 t MANUAL TYPE SHUTTING DOWN 2t MANUAL SCRAM Ft FORCED DURATION THE REACTOR OR 3t AUTOMATIC SCRAM NO. DATE St SCHEDULED (HOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS Cottt(EttTS 4t OTHER (EXPLAIN) 08 76-04-1 A Load on Unit No. 3 was reduced to approximately 258 1(Ye (45 0 R.P.) to locate and repair condenser tube leak.
(Non-Nuclear System) 09 76-04-1 A Load on Unit No. 3.ttas reduced to approximately 215 1$ (e to locate and repai'e condenser tube leak.
(Non-Nuclear System) 10 76-04-2 F Reactor trip caused by removing undervoltage time delay relay frost service. on operating unit, in error.
Corrective. action taken'included installing large signs identifying each relay cabinet and associated unit number.
'
scauasy: 'Unit No. 3 operated at approximately 109 9 R.p. except for reactor trip on April 22 and load reductions to repair condenser tune ledks on April 1'1 and 16, 1976.
,/-f
~ I H ~ ~ ~
APPENDIX C OPERATING DATA REPORT DOCKET NO 50 - 251 UNIT.Tur):ey Point Unit No. 4 REPORT M)NTH Anril 1976 DATEV~y 5, 1976 COMPLETED BY V.T. Chilson
>>
TELEPHONE (305) 552 - 3830.
'PERATING STATUS 1>> REPORTING PERIOD: 0001t 76E 04E01 GROSS HOURS ZN REPORTING PERIOD 2>> CURRENTLY AUTHORIZED POWER LEVEL (MWt):2 200 t):
~
HAE OEPESO. CAPACATY (H'A -H ~bt 3 POWER LEVEZ TO WHICll RESTRZCTED (IF ANY) (MWc-Nct):
4~ REASONS FOR RESTRICTION '(ZF ANY) t THIS MONTH YEAR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL..... 410. 5 ~ 2,411.0 18,056.9 6~ REACTOR RES..RVD SHUTDO)AAJ HOURS. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
117.1 7~ HOURS GENERATOR ON IZNE... ~ . ~ . ... . ~
408.7 2,370.5 172 084. 2 8 UNIT RESERVE SHUTDOWN HOURS. ~ ~ ~ .~ ~ ~ ~
. , E. GROSS TIIEIIHllA El)ERCY GEIIERATEG (HHII)..... 87~233 ~51 5 759 35 784 395
- 10. GROSS ELEC"RZCAL ENERGY G NERATED (MwH) 275,701 1,661,601 11,640,678
(
NET ELECTRICAL ENERGY GENERATED (M'A>>H) ~
2615 336 lt 580r 280 lit038S 9 0 12>> FLECTOR SERVICE FACTOR>> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ >> ~ ~ 57.1 . 83.1 76.6 13 'EACTOR AVAILABILITYFACTOR. ~ ~ ~ ~ ~ ~ ~ .2 ' ~
57.1 83.1 77. 1 14 ~ UNIT SERVICE FACTOR ~ ~ ~ ~ ~ >> ~ ~ ~ ~ ~ ~ ~ ~ ~ >> 56.8 81.7 72.5 15: UNIT AVAZAZLITYFACTOR.. >>' ~ . >>. ~ >>
~ 56.8 81.7 72.5
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 54.6 65.0- 71.3
- 17. UNIT CAPACITY FACTOR (Using Design MWc) .. 52.4 78.6 67. 6 18 'NIT FORCED OUTAGE RATE. ~ . >>>> ~ . >> ~ ~ . ~ . 2.4 3.4 19>> SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS .(TYP, DATE AND DURATION OF EACH):
NONE Ht 20 ~,'F SHUTDO'tJN AT END OF REPORT PERIOD,. ESTIMATED DA E OF STARTUP:
- 21. UNITS ZN TEST STATUS (PRIOR TO COJDKRCZAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY
~ ~
>>
~ INITIALELECTRICITY
~ COJO(ERCZAL OPERATION JJ NOTE: Changed to D.S.T.'n April 25; 1976
~ ' p ~ P
'i
>;s s ~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocFET No. 50 - 251
. mtzT Turkey point Unit No. 4 DATE May 5, 1976.
coNPLETED BY v T chilson TELEPHoNE (305) 552 3830
) oNTH APril 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER'EVEL (MWc-Nct) (MWc-Nct) 662 599 661 18 648 19
\ 4 419 20 662 21 658 660 23 DDI. g4 25 10 672 26 660 '27 12'3 660 28 657 14 657 30 15 664 16 660 NOTE: Daily average power level greater than 666 ))We due to cooler condenser cooling water;
(1) REASO)t UNIT SHUTDOWNS AND 'PCWER RSDUCiIONS UNIT ttA>tE Turkey Point Unit No. I, Ai EQTUIPMENT FAILURE (EXPLAIN)
E: MAIttT. OR TEST DATE b'av 5P 1976 Ct FSFUELING D: PZGULATORY RESTRICTION COMPLFTED DY V.T. Chilson Et OPERATOR TRAIttIttG AttD LICENSE EXAMINATION Ft ADMItIISTRATIVE TELEPHONE(305) 552- 3830 Oi"ERATIONAL ERROR (EXPLAIN) ANPOAT MONTN APril 1976 G:
HL OTHER (EXPLAIN)
(2) F iHOD METHOD OP 1: MAttUAL TYPE StlUTTING DOWN 2: MANUAL SCRAM F: FORCED DURATION Tt!E REACTOR OR 3c AUTOMATIC SCRAM NO DATE Sy SCHEDULED (<<oURs) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIOttS/CON(EttTS 44 OTHER (EXPLAIN) )
09 6-04-03 Load on Unit No. 4 v7as reduced to approxictately 250 )(t(e to perforct periodic tost of turbine nain stean stop, reheat stop, and reheat intercept valves.
(Non-Nuclear System)
'l. a v
T 10 6-04-18 310.3 Unit No. 4 was rewed frost service for scheduled refueling, tcaintenance, and inspections. (Nuclear and Non-Nuclear Systems) d I ~ ee I
'slrwxtar Unit No. 6 operated at appioximately 100 t n p u.nt.il unit wiis removed frau service for refueling, maintenance, and inspections on April 16, 1976, except for load reduction for p'eriodic turbine valve test on April 3, 1976.-
1 v
~ v
APPENDIX C OPERATING DATA REPORT DOCKET NO 50 - 335 UNIT.St. Lucie Unit No. 1 DATE Hay 5, 1976 COMPLETED BY V.T. Chilson TELEPHONE (305) 552 3830 OPERATING STATUS
~
1~ REPORTING PERIOD:MOls 76E 04s01 GROSS HOURS ZN REPORTING PERZOD: 719 0" THROUGH 2400, 76 04 30 MAX DEPEND CAPIACIAY OIAAI'e Net): n
' POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)
'.
REASONS FOR ASTRICTION '(ZF ANY):
THIS MONTH YEAR To DATE CUMULATIVE
- 5. IIOHEER OE H!IOIIS REACZOR HAS CRZ'ZZCAR..
6 REACTOR RESERVE SHUTDOWI4 HOURS os ~ ~
7~ HOURS GENERATOR ON LINE .. ~ .~ o ~ .~
0 9 GROSS THERMAL'NERGY GENERATED (Ã&) E ~ .
)0. GROSS ELECTRICAL E'.EERGY GENEPATED (YiÃ(l)
NET ELECTRICAL ENERGY GENERATED (MWH)
- 12. REACTOR SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ,' ~ ~ ~ ~ ~ ~ N/A N/A N/A
- 13. REACTOR AVAZLABZLZTYFACTOR...... .... ~ o
- 14. UNIT SERVICE FACTOR.
- 15. UNIT AVAILABILITYFACTOR........ ~ .~.
- 16. UNIT CAPACITY FACTOR (Using MDC).........
- 17. UNIT O'APACITY FACTOR (Using Design MWe)..
18 'NIT FORCED OUTAGE RATER ~ .. ~ ~ .~ . ~.
19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21 UNITS IN TEST STATUS (PRIOR TO COitVERCZAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY April'ZS, 1976 INITIALELECTRICITY COWKRCIAL OPERATION
~ HOTE: Changed to DST on April 25, 1976
APPENDIX B AVERAGE DAILY ONIT POWER LEVEL DOCKET NO.
. DNIT St. Lucie Unit No. 1
~ ~ DATE Na 5, 1976 COiMLETED BY V. T. Chilson HONT)f ~~<)~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER ZEVEL (NWc-Nct) (HWc-Nct) 17 18 19
( 4 20 21 23 24 -0>>
25 10 26
'27 12
~
28 13 29 30 15 l6
)~
~ ~
APPEllDZX D DOCKET NOe (1) REASON UNIT SHUTDOWNS AtlD POWER REDUCAZONS UNIT NAME St. Lucie Unit No. 1 As EQUZPME'tT FAILURE (EXPLAIN)
Bs MAZttT. OR TEST ~ DATE )/ay 5, 1976 Cs Fml'UELItlG Ds PXGULATORY RESTRICTIOil COMPLETED BYV.T. Chilscn Es OPERATOR TRAINING AND LICEtlSE EXAMINATION TELEPHONE ~305) 552 - 3S30 Fs ADMItlISTRATZVE REPORT MONTH A)>rfl 1976 C: OPERATIONAL ERROR (EXPLAIN)
Hs OTHER (EXPLAIN)
(2) METttOD METHOD OF 1s HiQlUAL TYPE SHUTTING DOWN 2: MAtlUAL SCRAM Fs FORCED DURATION THE REACTOR OR 3s AUTOeMATZC SCRAM DA.TE Ss SCHEDULED (HOURS) REASON (1) REDUCINC POWER(2) CORRECTIVE ACTIONS COMMEtlTS 4 2 OTllER {EXPLAZtl) l N/A secants 'Unit No. 1 achieved initial criticality at 8:30 a.m. April 22, 1976.
Low power physics test program in progress.
j