Attached April, 1976, Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A400
Person / Time
Site: Turkey Point  
Issue date: 05/07/1976
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A400 (15)


Text

U.S. NUCLEAR REGULATORY MISSION NRC FORM 195 (2-761 NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL 50-25~25 335 FILE NUMBER MONTHLY REPORT USNRC FRoM:Flordia Power.

8 Lioht Co.

Miami, Flordia A.D. Schmidt DATE OF OOCUMENT 5-7-76 OATE RECEIVEO CJLETTE R

)OORIQINAL 0 COPY GNOTORIZEO X3UN C LASS IF I E O INPUT FORM NUMBER OF COPIES RECEIVEO OESCRIPTION LET~re TRANS THE FOLLOWING:

MONTHLY REPORT FOR A

PLANT & COMPONENT OPERABILITY &

AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME:

Turkey PT. ¹ 3

8 4

St. Lucie ¹ 1

gONOg REMOVE ZCKXO<<<DGED:

MIPC W

CYS FO AC ON FOR ACTION/INFORMATION INTERNALDISTRI BUTION PD BRANCH CHIEF L

~ Ft.

Pi c

F EXTERNALDISTRIBUTION CONTROL NUMBER 744

r.

.~

.O.

BOX 013I00, MIAMI, FLORIDA 3310I Regufatoty il 1

FLORIDA POWER Ei LIGHT COiVIPAiIY Office of Management Xnformation and Program Controls U. S.

Nuclea'r Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the, April, 1976 Operating Status Re for Turkey Point, Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, D.

chmidt Vice President Power Resources Or DOCKfyg0 U

VTC/pm Attachments cc:

Mr. Norman C. Moseley Jack R.

Newman, Esquire H E LiiI N G B LI I L0 P L0 R I O A

~s 1

~l

'; tI If r

I

APPENDIX B AVERAGE DAILY DNZT POWER LEVEL

~

~

DOCKET No. 50 250 DNIT Turkey Point Unit No.

DATE Hay 5, 1976 COPNLETED BY V.

xoNTB April 1976

~

DAY AVERAGE DAILY POWER LEVEL (YRc-Nct) 1 662 DAY AVERAGE DAZIY POWER LEVEL (Nwc-Nct) 17 2

661 670

~

4 667 664 6

665 7

663 8

664 9

669 673 11 384 18 19 20 21

.22 23 25 26

'27 663 658 660 661 580 650 649 623 650 649 12 13 15 16 634 662 660 623 487 28 29 30 NOTE-645 571 Daily average power level greater than 666 hlHe due to cooler condenser cooling water.

~ ~

6 A

44RAIJ, yY 4

C DI A

i OD,

IPD,

\\, II-, DP-Ai PN,P

~A,

i,=

~

AA'<<

~ ~

APPENDIX C

~

OPERATING DATA REPORT

'I~

POCEE1'O.

2() -P~

UNITTurkey Point Unit No. 3 DATE)iay 52 1976 COMPLETED BY V.T. Chilson TELEPHONE (305) 552 - 3830.

'PERATING STATUS 1.

REPORTING PERZODQ001 76 04 01 GROSS HOURS ZN REPORTZNG PERIOD: 719.0>

THROUGH 2400 76 04, 30 PAN.

DEPEND.

CA. ACYYY (NN -N it:

88 S

~

3.

POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWc-Nct):

4 ~

REASONS FOR RESTRICTION (ZF ANY):

'I 5 ~

NUMBER OF HOURS REACTOR WAS CRZTZCALA ~

I THIS MONTH YEAR TO DATE CUMULA ZVE 718.4 2p643.4

'3,923.6 6.

7.

0 15.4 18.6 REACTOR RESERVE SHUTDOWN BOURDON'

~ ~

~ ~

HOURS GENERATOR ON LINE..... ~............

717.9 2,600.8 22,970.8 128(IT R-SERVE SHU Doiv14 HOURS

~

~ ~

15.4 8..

9 10.

12.

GROSS SEE)II!AD ENERGY GEEEIIAYED (ISIS).....

15299161

~87 87 IANNA GROSS ELECTRICAL E11ERGY GENERATED (MWH)..

481 830 1 793,370 13,808,606 NET ELECTRICAL ENERGY GENERATED (MWH)...

4572957 lp7032726 13p0592488 REACTOR SERVICE FACTOR

~

~

99 '

. 91 '

80.1 13 REACTOR AVAILABILITYFACTOR......

~......

99 9 91.1 14.

UNIT SEPVZCE FACTOR..

99.8

89. 6 76.9 15'6.

17.

18.

19 ~

0.2 Ui)1ZT AVAZAZLITYFACTORP ~ ~ ~

~ ~ ~ ~ ~

~

~ ~

~

7

~

. 'aa.8 U11ZT CAPACITY FACTOR (Using MDC).........

66.8 UNIT CAPACITY FACTOR (Using Design YÃc)..

84.7 63.1 UNIT FORCED OUTAGE RATE. ~......

~..

~ ~. ~ ~ ~

0.1 3 '

SHUTDOWNS SCHEDULED OVER NEXT,6 MONTHS (TYPE, DATES AND DURATION 0 EACH):

Refueling, Maintenance, and Inspection.".

October 4 through-Novcnber 1(, 1976'

~

20 21i

'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP.

UNITS IN TEST STATUS (PRIOR TO CONA(ERCZAL OPERATION):

FORECAST P

ZNZTZAZ CRITICALITY INITIALELECTRICITY

~,

~

COMMERCIAL OPERATION i,

~

~

<NOTE Changed to D.S.T.E on hpril 25, 1976 i

ACHIEVED

'1)

~psott At EQUIPHEttT FAILURE (EXPLAIN)

Bt MAItlT, OR TEST Ct FZFUEl ItlG

~

Dt PEGVLATORY RESTRICTION Et OPERATOR TRAINING AND LICEtlSE EXAMINATION Ft ADHItlISTRATIVE G.

OPERATIONAL ERROR (EXPLAIN)

Ht OTHER (EXPLAIN)

VNIT SHUTDOWNS AND POWER REDUCAIONS ARRORP xcars~ar[1 1976 UNIT NAMETurkev Point Unit Nft

. DATE

)9m 5, 1976 COMPLETED BYV.T. Chilson TELEPHON.

(305) 552 3830 l

, (2)

METHOD 1 t MANUAL 2t MANUAL SCRAM 3t AUTOMATIC SCRAM 4t OTHER (EXPLAIN)

NO.

DATE 08 76-04-1 09 76-04-1 10 76-04-2 TYPE Ft FORCED St SCHEDULED F

DURATION (HOURS)

REASON(1)

A A

HETHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS Cottt(EttTS Load on Unit No. 3 was reduced to approximately 258 1(Ye (45 0 R.P.) to locate and repair condenser tube leak.

(Non-Nuclear System)

Load on Unit No. 3.ttas reduced to approximately 215 1$(e to locate and repai'e condenser tube leak.

(Non-Nuclear System)

Reactor trip caused by removing undervoltage time delay relay frost service. on operating unit, in error.

Corrective. action taken'included installing large signs identifying each relay cabinet and associated unit number.

scauasy: 'Unit No.

3 operated at approximately 109 9 R.p. except for reactor trip on April 22 and load reductions to repair condenser tune ledks on April 1'1 and 16, 1976.

,/-f

~

I H

~

~

~

APPENDIX C OPERATING DATA REPORT REPORT M)NTH Anril 1976 DOCKET NO 50 - 251 UNIT.Tur):ey Point Unit No. 4 DATEV~y 5, 1976 COMPLETED BYV.T. Chilson TELEPHONE (305) 552 - 3830.

'PERATING STATUS 1>>

REPORTING PERIOD: 0001t 76E 04E01 GROSS HOURS ZN REPORTING PERIOD

~ 2>>

CURRENTLY AUTHORIZED POWER LEVEL (MWt):2 200 HAE OEPESO.

CAPACATY (H'A -H t):

~bt 3

POWER LEVEZ TO WHICll RESTRZCTED (IF ANY) (MWc-Nct):

4 ~

REASONS FOR RESTRICTION '(ZF ANY) t THIS MONTH YEAR TO DATE CUMULATIVE 5

NUMBER OF HOURS REACTOR WAS CRITICAL.....

410. 5

~

2,411.0 18,056.9 6 ~

REACTOR RES..RVD SHUTDO)AAJ HOURS. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

7 ~

HOURS GENERATOR ON IZNE... ~.

~....

~ 408.7 2,370.5 117.1 172 084. 2 8

UNIT RESERVE SHUTDOWN HOURS.

~

~

~. ~

~ ~ ~.

, E.

GROSS TIIEIIHllAEl)ERCY GEIIERATEG (HHII).....

87~233

~51 5 759 35 784 395

(

10.

GROSS ELEC"RZCAL ENERGY G NERATED (MwH) 275,701 1,661,601 11,640,678 NET ELECTRICAL ENERGY GENERATED (M'A>>H)

~

2615 336 lt580r 280 lit038S 9 0 12>>

FLECTOR SERVICE FACTOR>> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~

13 'EACTOR AVAILABILITYFACTOR. ~ ~ ~ ~ ~ ~ ~

.2 '

~

57.1

. 83.1 76.6 57.1 83.1

77. 1 14 ~

UNIT SERVICE FACTOR

~

~

~

~ ~ >> ~ ~ ~ ~

~ ~ ~ ~ ~ >>

56.8 81.7 72.5 15:

UNIT AVAZAZLITYFACTOR..

~.

~ >>

~

56.8 81.7 72.5 16.

UNIT CAPACITY FACTOR (Using MDC).........

17.

UNIT CAPACITY FACTOR (Using Design MWc)..

18'NIT FORCED OUTAGE RATE.

~.

>>>> ~.

~ ~. ~. 2.4 3.4 54.6 65.0-71.3 52.4 78.6

67. 6 19>>

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS.(TYP, DATE AND DURATION OF EACH):

>> ~

~

~

NONE Ht 20~,'F SHUTDO'tJN AT END OF REPORT PERIOD,. ESTIMATED DA E OF STARTUP:

21.

UNITS ZN TEST STATUS (PRIOR TO COJDKRCZAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY

~

COJO(ERCZAL OPERATION JJ NOTE:

Changed to D.S.T.'n April 25; 1976

~

p

~

P

>;s'i s

~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocFET No. 50 - 251

. mtzT Turkey point Unit No.

4 DATE May 5, 1976.

coNPLETED BY v T chilson TELEPHoNE (305) 552 3830

) oNTH APril 1976 DAY

\\

4 10 12'3 14 15 AVERAGE DAILY POWER LEVEL (MWc-Nct) 662 661 648 419 662 658 660 DDI.

672 660 660 657 657 664 DAY AVERAGE DAILY POWER'EVEL (MWc-Nct) 599 18 19 20 21 23 g4 25 26

'27 28 30 16 660 NOTE:

Daily average power level greater than 666

))We due to cooler condenser cooling water;

(1)

REASO)t Ai EQTUIPMENT FAILURE (EXPLAIN)

E:

MAIttT. OR TEST Ct FSFUELING D:

PZGULATORY RESTRICTION Et OPERATOR TRAIttIttG AttD LICENSE EXAMINATION Ft ADMItIISTRATIVE G:

Oi"ERATIONAL ERROR (EXPLAIN)

HL OTHER (EXPLAIN)

UNIT SHUTDOWNS AND 'PCWER RSDUCiIONS ANPOAT MONTN APril 1976 UNIT ttA>tE Turkey Point Unit No. I, DATE b'av 5P 1976 COMPLFTED DY V.T. Chilson TELEPHONE(305) 552-3830 (2)

F iHOD 1:

MAttUAL 2:

MANUAL SCRAM 3c AUTOMATIC SCRAM 44 OTHER (EXPLAIN) )

v T

NO DATE 09 6-04-03 10 6-04-18 TYPE F:

FORCED Sy SCHEDULED DURATION

(<<oURs) 310.3 REASON(1)

METHOD OP StlUTTING DOWN Tt!E REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIOttS/CON(EttTS Load on Unit No. 4 v7as reduced to approxictately 250 )(t(e to perforct periodic tost of turbine nain stean stop, reheat stop, and reheat intercept valves.

(Non-Nuclear System) a

'l.

Unit No. 4 was rewed frost service for scheduled refueling, tcaintenance, and inspections.

(Nuclear and Non-Nuclear Systems) d I

I

~ee

'slrwxtar Unit No.

6 operated at appioximately 100 t n p u.nt.il unit wiis removed frau service for refueling, maintenance, and inspections on April 16, 1976, except for load reduction for p'eriodic turbine valve test on April 3, 1976.-

1 v

~

v

APPENDIX C OPERATING DATA REPORT DOCKET NO 50 - 335 UNIT.St. Lucie Unit No.

1 DATE Hay 5, 1976 COMPLETED BY V.T. Chilson TELEPHONE (305) 552 3830 OPERATING STATUS

~ 1 ~

REPORTING PERIOD:MOls 76E 04s01 GROSS HOURS ZN REPORTING PERZOD: 719 0" THROUGH

2400, 76 04 30 MAX DEPEND CAPIACIAY OIAAI'e Net):

n POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWe-Net)

REASONS FOR ASTRICTION '(ZF ANY):

5.

6 IIOHEER OE H!IOIIS REACZOR HAS CRZ'ZZCAR..

REACTOR RESERVE SHUTDOWI4 HOURS ~

~

THIS MONTH YEAR To DATE CUMULATIVE 7 ~

HOURS GENERATOR ON LINE.. ~. ~

o

~. ~

0 9

)0.

12.

13.

14.

15.

GROSS THERMAL'NERGY GENERATED (Ã&)

E

~.

GROSS ELECTRICAL E'.EERGY GENEPATED (YiÃ(l)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~,'

~ ~ ~ ~ ~ ~

N/A REACTOR AVAZLABZLZTYFACTOR..........

~ o UNIT SERVICE FACTOR.

UNIT AVAILABILITYFACTOR........

~. ~.

N/A N/A 16.

UNIT CAPACITY FACTOR (Using MDC).........

17.

UNIT O'APACITY FACTOR (Using Design MWe)..

18'NIT FORCED OUTAGE RATER

~

os

.. ~

~. ~

. ~.

19 ~

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20. 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21 UNITS IN TEST STATUS (PRIOR TO COitVERCZAL OPERATION)

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COWKRCIAL OPERATION April'ZS, 1976

~ HOTE:

Changed to DST on April 25, 1976

APPENDIX B AVERAGE DAILY ONIT POWER LEVEL DOCKET NO.

~

~

. DNITSt. Lucie Unit No.

1 DATE Na 5,

1976 COiMLETED BY V.T. Chilson HONT)f~~<)~

DAY AVERAGE DAILY POWER LEVEL (NWc-Nct)

(

4 DAY AVERAGE DAILY POWER ZEVEL (HWc-Nct) 17 18 19 20 21 10 12 13 23 24 25 26

'27 28 29 30

-0>>

15 l6~

) ~

~

~

(1)

REASON As EQUZPME'tT FAILURE (EXPLAIN)

Bs MAZttT. OR TEST Cs Fml'UELItlG Ds PXGULATORY RESTRICTIOil Es OPERATOR TRAINING AND LICEtlSE EXAMINATION Fs ADMItlISTRATZVE C:

OPERATIONAL ERROR (EXPLAIN)

Hs OTHER (EXPLAIN)

APPEllDZX D UNIT SHUTDOWNS AtlD POWER REDUCAZONS REPORT MONTH A)>rfl 1976 DOCKET NOe

~ DATE

)/ay 5, 1976 COMPLETED BYV.T. Chilscn TELEPHONE

~305) 552 - 3S30 UNIT NAME St. Lucie Unit No. 1 (2)

METttOD 1 s HiQlUAL 2:

MAtlUAL SCRAM 3s AUTOeMATZC SCRAM 4 2 OTllER {EXPLAZtl) l DA.TE TYPE Fs FORCED Ss SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS COMMEtlTS N/A secants

'Unit No.

1 achieved initial criticality at 8:30 a.m. April 22, 1976.

Low power physics test program in progress.

j