MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
',ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM.~e REGULATORY
=INFORMATION DISTRIBUTION SYSTEM (RIDS)..ACCESSION NBR:9103250391 DOC.DATE: 91/02/28 NOTARIZED:
NO FACIL:50-335 St.Lucie Plant, Unit 1,.Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILXATXON BREEN,J.J.
Florida Power&Light Co..SAGER,D.A.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Feb 1991 for St.Lucie Units 1&2.W/910315 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR (ENCL Q SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES DOCKET, 05000335 05000389 R I D RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSXC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA NRR/DLP EB1 0 R NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D S D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 D D e J r l P.O.Box 128, Ft.Pierce, FL 34954-0128 MAR 1 5 199}L-91-74 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February 1991 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Very truly yours, 446 D.A.S ger Vice r sident St.Lucie Plant DAS JJB kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL N381 9103250391 910228 PDR ADOCK 05000335 R PDR g~QE.q ra anFPLGroop company SE2v-'/I A~~J/T'k gE I AVERAGE DAILY UNIT POSER LEVEL DOCKET NO~50>>335 I~COMPLETED BY J.J.Breen MONTH FEBRUARY 1991 DAY AVERAGE DAILY POSER LEVEL (MRe-Net)2/1/91 2/2/91 2/3/91 2/0/91 2/5/91 2/6/91 2/7/91 2/8/91 2/9/91 2/10/91 2/il/91 2/12/91 2/13/91 2/10/91 2/15/91 2/16/91 2/17/91 2/18/91 2/19/91 2/20/91 2/21/91 2/22/91 2/23/91 2/24/91 2/25/91 2/26/'91 2/27/91 2/28/91 861 S63 864 860 866 860 863 861 865 867 867 867 867 868 866 868 870 870 867 803 723 825 867 866 866 867 868 868
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 58-335 DATE R<z 1991 COMPLETED BY J.J.'BREEN TELEPHONE 487/465/3558 UNIT NAME'Ti LUCXE UNIT 1 2i REPORTING PERIOD+FEBRUARY 1991 3+LICENSED THERMAL POHER (MHT)o 2780 4, NAMEF LATE RATING (GROSS MWE>;858 5i DESXGN ELECTRICAL RATING (NET MHE)i 830 6, MAXXMUM DEPENDABLE CAPACITY (GROSS MHE>: 872 7i MAXIMUM DEPENDABLE CAPACXTY (NET MME): 839 8, XF CHANGES OCCUR XN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)SXNCE LAST REPORT~GXVE REASONS', POWER LEVEL TO WHICH RESTRICTED~
XF ANY (NET MHE)18'EASONS FOR RESTRXCTXONSr XF ANY'MONTHLY-YTD-CUMULATXVE 11.HOURS XN REPORT PERIODS 12'UMBER OF HOURS REACTOR HAB CRXTXCAL 13.REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR QN-LXNE 15'NIT RESERVE SHUTDOHN HOURS 16'ROSS THERMAL ENERGY GENERATED<MHH)17'ROSS ELECTRXCAL ENERGY GENERATED (MWH)18'ET ELECTRICAL ENERGY GENERATED (MHH)i.9i UNXT SERVXCE FACTOR 28'NXT AVAXLABXLXTY FACTOR 21 CAPACITY FACTOR (USXNG MDC NET)22'APACXTY FACTOR<USING DER NET)23+UNIT FORCED OUTAGE RATE 24, BHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 672 672i8 8i8 672i8 8i8 1800859 607240 576922 188'188+8 182i3 183i4 8+8 1416 1397i5 8+8 1393i8 8+8 3717230 1249130 1185622 98i4 98+4 99'100'8e8 124392.0 94356i8 285 3 93498+1 39i3 240959284 79457770 75878364 75o2 75+2 74+8 73.8 4.3 25 XF SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-335 UNIT NAME ST LUCIE UNIT 1 DATE 1991 COMPLETED BY J.J.BREEN TELEPHOHE 6440460 550 REPORT MONTH FEBRUARY 1 1 No.Date Type Duration (Hours)Reasons Method of Shutting Down Reactor Licensee Event Report System Codes Component Code Cause&Corrective Action to Prevent Recurrence Unit 1 remained at full power for the month of February.F Forced S Shutdown Reason A-Equipmcnt failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training R License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Olher (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Liccnsce Event Report (LER)File (NUREG-0161)
Exhibit 1-Same Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO~50-335 DATE COMPLETED BY..reen TELEPHONE 407 465-3550 REPORT MONTH FEBRUARY 1991 For the month of February Unit 1 remained at full power.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POlifER LEVEL DOCKET NO~50-389 DATE COMPLETED BY..Breen MONTH FEBRUARY 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)2/1/91 2/2/91 2/3/91 2/4/91 2/5/91 2/6/91 2/7/91 2/8/91 2/9/91 2/10/91 2/1 1/91 2/12/91 2/13/91 2/14/91 2/15/91 2/16/91 2/17/91 2/18/91 2/19/91 2/20/91 2/21/91 2/22/91 2/23/91 2/24/91 2/25/91 2/26/91 2/27/91 2/28/91 865 869 870 871 871 870 869 869 871 872 872 873 873 873 871 873 874 874 873 871 869 868 868 868 855 866 870 871 Qr ERATING DATA RE>QRT OPERATING STATUS DOCI<ET NO 58-389 DATE cavrczvzo sv 8>"JARw TELEPHONE 407/465/3558 1>>UNXT NAME>>BT>>LUCXE UNXT 2 2>>REPORTXNG PERTOD>>FEBRUARY 1991 3>>LICENSED THERMAL POWER<MWT)>>27ee 4>>NAMEPLATE RATING (GROSS MWE)>>858 5>>DEBXGN ELECTRICAL RATING<NET MWE): 830 6>>MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE)>>882 7>>MAXIMUM DEPENDABLE CAPACITY (NET MWE)>>839 8>>IF CHANGES OCCUR IN C*PACXTY RATINGS (XTEMB NUMBER 3 THROUGH 7)SINCE LAST REPORTr GXVE REASONS>>9, POWER LEVEL TQ WHICH REBTRICTEDr XF ANY (NET MWE)10>>REASONS FOR RESTRXCTXONBr XF ANY>>MONTHLY-YTD-CUMUL'ATIVE HOURS XN REPORT PERIODS 12 NUMBER OF HOURS REACTOR WAS CRXTXCAL 13 REACTOR RESERVE SHUTDOWN HOURS 14, HOURS GENERATOR ON-LXNE 15>>UNIT RESERVE SHUTDOWN HOURS 16>>GROSS THERMAL ENERGY GENERATED (MWH)17>>GROSS ELECTRXCAL.
ENERGY GENERATED (MWH)18>>NET ELECTRIC*L ENERGY GENERATED<MWH)19>>UNXT SERVXCE FACTOR 20, UNXT A VAILABXLXTY FACTOR 21>>CAPACITY FACTOR (USXNG MDC NET)22.CAPACITY FACTOR (USING DER NET)23 UNIT FORCED QUTAGE RATE 24>>SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 672 672>>0 0>>0 672>>0 0>>e 1813283 615200 584588 108>>0 ice,O 103>>7 104>>8 0>>0 1416 1416>>0 0>>0 1416>>0 0>>0 3821022 1294880 123e368 100>>e 180>>0 103>>6 104>>7 0>>0 66289>>0 56276.3 0>>0 55260>>3 0>>0 144610103 48191800 45564471 83>>4 83.4 83>>5 83>>6 5>>8 25>>XF SHUT DOWN AT END OF REPORT PERIODr ESTXMATED DATE OF BTARTUP>>
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NQ.~5UBB UNIT NANB~BLUCIB Nl 2 DATE~191 COMPLETED BY J.J.BREEN TELEPHQPN NQQ 65-3550 REPORT MONTH FEBRUARY 1 1 No.Date Type Duration (Hours)Reasons Method of Shutting Down Reactor Licensee Event Report System Codea Component Code'ause&Corrective Action to Prevent Recurrence Unit 2 remained at full power for the month of February.F Forced S Shutdown Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method" 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Licensee Event Report (LER)File (NUREG4161)
Exhibit 1-Same Source Nlssl FPL
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-389 UNIT St.Lucie 2 COMPLETED BY J.J.Breen TELEPHONE 407 465-3550 REPORT MONTH FEBRUARY 1991 For the month of February Unit 2 remained at full power.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.