Forwards Responses to Draft SER Open Items 156 & 157 Re Main Condenser Evacuation Sys (Mces) Capacity & Mces Quality Group Correlation W/Reg Guide 1.26 Group D
ML18003A885
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/02/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-159, NUDOCS 8306080032
Download: ML18003A885 (7)


Text

r~.r REGULATO INFORMATION DISTRIBUTION STEM (RIDS)'ACCESSION NBR:8306080032 DOC~DATE: 83/06/02 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 50-401 Shearon Harris Nuclear Power Planti Unit 2, Carolina'AUTH BYNAME AUTHOR AFFILIATION MCDUFFIEiM>A, Carolina Power L Light Co~>RECIP~NAME RECIPIENT AFFILIATION DENTONiH~RE Office of Nuclear Reactor Regulationr Director DOCKET 05000400 05000401

SUBJECT:

Forwards responses to draft SER Open Items 156 8 157 re main condenser evacuation sys (MCES)capacity E MCGS quality group correlation w/Reg Guide 1~26 Group DE r 1 DI'STRIBUTION CODE: B001S.COPIES RECEIVED'LTR ENCL SIZE, TITLE;Licensing Submittal:

PSAR/FSAR Amdts L Related Correspondence'OTES:

RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL+ELD/HDS1 IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 2g NRR/DE/SGEB NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DS I/METB 12 N AB 22 REG FILE 04/MIB EXTERNAL: ACRS.41 DMB/DSS (AMDTS)LPDR 05 NSIC 05 COPIES LTTR ENCL 1 0 1 0 1 0 3 3 1 1 1 1 2 2 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 6 6 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR LB3 BC KADAMBI iP 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DS I/ICS8 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN2 BNL(AMDTS ONLY)FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 0 1 2 2 1 1 2 2'1 1 1 1 1-1 1 1 1 1 1"3 3 1 1 1 ,: i>TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 48 M I C W M H'W tl II I,II M H c)I r MI~I)(p I H lh.W 14 Carolina Power&Light Company JUN Pg~98p SERIAL: LAP-83-159 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.1 AND 2 DOCKET NOS.50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES METEOROLOGICAL

&EFFLUENTS TREATMENT BRANCH

Dear Mr.Denton:

Carolina Power&Light Company (CP&L)hereby transmits one original and forty copies of the responses to the Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER)CPAL Open Item Nos.156 and 157.Carolina Power&Light Company will be providing responses to other Open Items in the DSER shortly.Yours very truly, PS/pgp (6787PSA)Enclosure M.A.McDuffie Senior Vice President Engineering I Construction cc: Mr.Jack Hayes (NRC-METB)

Mr.N.Prasad Kadambi (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Dr.Phyllis Lotchin Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)8306080032 830602 PDR ADOCK 05000400 PDR 411 Fayettevllle Street o P.O.Box 1551~Raleigh, N.C.27602

~~~I>>(t 1>>t'lI II=*I t A (h n 1~0 w II l.III I SHEARON HARRIS NUCLEAR POWER PLANT DRAFT SAFETY EVALUATION REPORT (DSER)0 en Item 156 (DSER Section 10.4.2 a e 10-9)Justify the fact that the capacity for the Main Condenser Evacuation System (MCES)is not consistent with the guidelines of the"Standard for Steam Surface Condensers."~Res onse The determination of the venting capacity of the MCES was based on the design of the main condenser as described in Section 10.4.1.2.For one condenser shell with two exhaust openings, and an effective steam flow for each main exhaust opening of 3,000,001 to 4,000,000 lbs/hr, the venting capacity required was determined from Table ST-4 of the 1970, 6th Edition of the Standards for Steam Surface Condensers as required by SRP 10.4.2.The venting capacity required by the Heat Exchangers Institute standard was determined to be 30 scfm.

SHEARON HARRIS NUCLEAR POWER PLANT DRAFT SAFETY EVALUATION REPORT (DSER)0 en Item 157 (DSER Section 10.4.2 age 10-9)Correlation of quality group classification to which the Hain Condenser Evacuation System (MCES)is designed with the Quality Group D designation presented in Regulatory Guide 1.26.~Res ense The HCES mechanical vacuum pumps, piping, valves and strainers are designed to ANSI B31.1 and/or manufacturer standards as applicable and correlate with Quality Group D of Regulatory Guide 1.26.The HCES is a non-nuclear safety, non-seismic Category I system.The Condenser Vacuum Pump Effluent Treatment System (CVPETS)is a non-nuclear safety, nonmeismic Category I designed ventilation cleanup system, and is not part of the radioactive waste management system.Regulatory Guide 1.26 does not apply to ventilation systems and, therefore, the CVPETS is not classified Quality Group D.

gl h II f'P 4~~