|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L0911990-09-12012 September 1990 Confirms That Fee Electronically Transferred to Dept of Treasury for Payment of NRC Review Fees ML18009A6581990-09-11011 September 1990 Submits Addl Info Re Use of Hafnium Control Rods at Facility.All Rods Will Be Removed During Spring 1991 Outage ML20059H4181990-09-0606 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-400/90-13.Corrective Action:Changes to EST-717 in Area of Power Normalization Under Study for Past Several Months ML17348B4941990-08-30030 August 1990 Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-duty ML20059D3511990-08-30030 August 1990 Forwards Decommissioning Financial Assurance Certification Rept Submitted by North Carolina Eastern Municipal Power Agency ML18009A6261990-08-10010 August 1990 Informs That Action Committed to in Response to Generic Ltr 88-14, Instrument Air Supply Sys, Completed ML18009A6241990-08-0303 August 1990 Forwards Addl Info Re Operator Action Times Assumed in Steam Generator Tube Rupture Analyses for Plant,Per 900712 Telcon ML18009A6081990-07-31031 July 1990 Forwards Plan for Shearon Harris Nuclear Power Plant Emergency Exercise - 900919, Per NRC Request.W/O Encl ML20055J4171990-07-30030 July 1990 Forwards Rev 5 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20055F9431990-07-12012 July 1990 Advises That Stated Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900711 for Payment of Operator License Exam Fees for Listed Insp Invoices ML18009A5991990-07-0606 July 1990 Comments on Electrical Distribution Sys Functional Insp Rept 50-400/90-200 on 900212-0316.Seismic Qualification Package Subsequently Upgraded to Include Qualification Info Based on Receipt of Part 21 from Transamerica Delaval ML18009A5851990-06-28028 June 1990 Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl ML18009A5621990-05-30030 May 1990 Responds to NRC 900504 Ltr Re Violations Noted in Insp Rept 50-400/90-06.Corrective Actions:Procedures OST-1008 & OST-1108 Revised to Delete Stroke Testing of Valve 1ST-359 on Quarterly Basis ML18009A5141990-05-0303 May 1990 Forwards Eddy Current Exam CP&L Shearon Harris Nuclear Power Plant Steam Generators A,B & C, Providing Results of Inservice Insps Performed During Plant Second Refueling Outage in Oct 1989 ML18009A4941990-04-26026 April 1990 Forwards Radiological Environ Operating Rept,1989, Radiological Environ Operating Rept,Vol II,Jan-June 1989, Sample Analyses Data & Radiological Environ Operating Rept,Vol III,Jul-Dec 1989,Sample Analyses Data. ML18009A5031990-04-25025 April 1990 Submits Suppl 2 to Relief Request R2-001 Re Plant 10-yr Inservice Insp Plan,Per 880129 Request ML18009A4911990-04-24024 April 1990 Forwards Addl Info Re Proposed Wakesouth Regional Airport to Be Located Near Facility,Per 900411 Request.Info Previously Provided to NRC During 900320 & 23 Telcons ML18009A4841990-04-24024 April 1990 Forwards Corrected Bases marked-up Page to 900226 Tech Spec Change Request Re Surveillance Intervals ML18009A4251990-03-30030 March 1990 Submits Supplemental Response to Station Blackout Rule Based on Guidelines Provided in NUMARC 87-00, Guidelines & Technical Bases for NUMARC Initiatives.... No Changes to Previous Calculations Necessary & One Deviation Noted ML18009A4231990-03-29029 March 1990 Suppls Response to NRC 900216 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Actions:Surveys Performed to Determined Extent & Level of Contamination & Personnel Involved Decontaminated ML18009A4111990-03-23023 March 1990 Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-400/90-02.Corrective Actions:Personnel Involved W/ Quadrant Power Tilt Ratio Calculations & Operability Determination Counseled ML18009A4121990-03-23023 March 1990 Forwards Rev 17 to PLP-201, Emergency Plan & Fission Product Barrier Analysis.Rev to Emergency Plan Incorporates Comments Received During Recent Licensed Operator Requalification Training in Emergency Plan Procedures ML18009A4151990-03-22022 March 1990 Responds to NRC SALP Rept for Jul 1988 - Nov 1989.Contrary to Statement in Rept Significant Amount of Refresher Training Was Conducted During SALP Assessment Period Including Termination & Splicing & Motor & Bus Relays ML18009A4081990-03-19019 March 1990 Responds to NRC 900226 Ltr Re Violations Noted in Insp Rept 50-400/90-01.Corrective Actions:All Calibr Required by Tech Specs for Power Range Nuclear Instrumentation Satisfactorily Completed ML18022A7891990-03-0909 March 1990 Forwards Vols 1 & 2 of Inservice Insp Summary 1st Interval 1st Period,2nd Refueling Outage Completed 891222. ML18022A7881990-03-0606 March 1990 Confirms Understanding of Status of NRC Activities Re Proposed Wakesouth Regional Airport Located Near Plant Site. Pending Issues Should Be Resolved by 900331 to Enable Util to Complete Negotiations W/Airport Authority ML18022A7851990-03-0202 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-400/89-34.Corrective Actions:Valve SI-332 Closed & Gravity Drain Path Isolated & Shift Foreman Required to Review MMM-012 Re Priority/Emergency Maint Work Control ML18022A7721990-02-26026 February 1990 Forwards Application for Amend to License NPF-63,revising Tech Spec Surveillance 4.0.2 to Permit Surveillances to Be Extended Up to 25% of Specified Interval & Removing 3.25 Limitation from Spec,Per Generic Ltr 89-14 ML20011F3821990-02-26026 February 1990 Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices ML18022A7701990-02-14014 February 1990 Notifies of Issuance of Renewal of NPDES Permit for Plant. Permit Encl ML18009A3831990-02-0909 February 1990 Responds to 900112 Ltr Re Violation Noted in Insp Rept 50-400/89-35.Corrective Actions:Valves ICS-775 & ICS-776 Added to Inservice Insp Program for Back Seat & Full Flow Testing & ICS-525 Revised to Satisfy Tech Spec Requirements ML18009A3751990-02-0101 February 1990 Forwards Retyped Tech Spec Pages Re 890630 Application for Amend to License NPF-63 Concerning RCS Pressure Temp Limits ML18009A3701990-02-0101 February 1990 Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301 IR 05000400/19890281990-02-0101 February 1990 Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301 ML18009A3631990-01-26026 January 1990 Responds to NRC Bulletin 88-008, Thermal Stratification in Piping Connected to Rcs. Design Differences That Either Minimize Potential of Occurrence or Enhance Possibility of Detection Should Scenario Be Created at Plant Determined ML18009A3531990-01-25025 January 1990 Forwards Reactor Containment Bldg Integrated Leak Rate Test Conducted in Oct 1989.Util Believes That Packing Leaks Discovered Are Isolated Failures & That Repair Should Prevent Recurrence ML18009A3501990-01-22022 January 1990 Forwards Revised Tech Spec Table 3.7-6, Area Temp Monitoring, Per 891218 Tech Spec Amend Request ML18022A7591990-01-17017 January 1990 Submits Results of Aircraft Hazards Study Associated W/ Proposed Wakesouth Regional Airport & Facility ML20005G5731990-01-16016 January 1990 Forwards Response to Insp Rept 50-400/89-32.Encl Withheld (Ref 10CFR73.21) ML18009A3351990-01-0505 January 1990 Forwards Rev 16 to Vol 1,Part 2 of Plant Operating Manual PLP-201, Emergency Plan. Revised NUREG-0654 Comparison W/ Plant Emergency Action Level Flow Path Also Encl for Review ML18009A3171989-12-21021 December 1989 Responds to NRC 891108 Ltr Re Violations Noted in Insp Rept 50-400/89-21.Corrective Actions:Incident Reviewed by Both Plant & Nuclear Engineering Dept Personnel to Avoid Future Miscommunication ML18009A3181989-12-15015 December 1989 Forwards Retyped Amend Bar Pages to Tech Spec Table 3.3-3 Re Auxiliary Feedwater Manual Initiation,Per 891026 Application for Amend to License NPF-63 ML18009A3011989-12-15015 December 1989 Forwards Proprietary WCAP-12403 & Nonproprietary WCAP-12404, LOFTTR2 Analysis for Steam Generator Tube Rupture W/Revised Operator Action Times for Shearon Harris Nuclear Power Plant. WCAP-12403 Withheld (Ref 10CFR2.790(b)(4)) ML18022A7371989-12-13013 December 1989 Forwards Change 3 to Rev 2 to State of Nc Emergency Response Plan in Support of Shearon Harris Nuclear Power Plant, Incorporating Administrative Enhancements. W/One Oversize Encl ML18009A2971989-12-0808 December 1989 Responds to NRC 891108 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Action:Min of Four Decontamination Personnel Will Be Assigned 24 H Per Day During Fuel/Cask Handling to Maintain Cleanliness in Fuel Handling Bldg ML18009A2841989-11-30030 November 1989 Forwards Rev 0 to Core Operating Limits Rept in Support of Cycle 3 Operations ML18005B1531989-11-27027 November 1989 Forwards Retyped Amend Bar Pages to 890630 Request for Rev to License NPF-63 Re RCS pressure-temp Limits ML18022A7311989-11-27027 November 1989 Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements. ML18005B1511989-11-17017 November 1989 Forwards 15-day Special Rept Identifying Number of Steam Generator Tubes Plugged During Current Inservice Insp Period ML18005B1501989-11-13013 November 1989 Suppls 890403 Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Addl Nontraceable Molded Case Circuit Breakers (MCCB) & MCCBs Traceable to Refurbishers Noted During Records Review 1990-09-06
[Table view] |
Text
REGULATORY
~FORMATION DISTRIBUTION S EM (RIDS)ACCESSION NSR:800719010E DOC DATE: SA/07/16 NOTARIZED:
NO FACIL:50 000 Shearon Harris Nuclear power PlantE Unit'E Carolina AUTH, NAME AUTHOR AFFILIATION
'IMMERMANES,R
~Carolina Power 8 Light Co~RECIP~NAME RECIPIENT AFFILIATION DENTONEH~RE Office of Nuclear Reactor Regulationi Director DOCKET 05000uoo DISTRISOTION CODE: AOAES COPIES RECEIVED:LTR J ENCL TITLE: OR Submittal Emergency Prep Cot respondence NOTES: S UBJECT: Forwards emergency planning public info brochuregin response to SER Open Item 12 re emergency preparedness,Addi info provided in SER Section 13,3,2,7, SIZE;RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYPB'Ol INTERNAL: IE/DEPER/EPB Ob COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 REC IP IFNT ID CODE/NAME NRR LB3 LA IE/DEPER/IRB 12 NRR/DS I/RAB RGN2 COPIES LTTR ENCL 1 0 1 1 1 1 1 EXTERNAL: FEMA TECH HAZ NRC PDR 02 NTIS 05 1 1 1 1 1 LPDR NSIC 03 1 1 1>1 ji TOTAL NUMBER OF COPIES REQUIRED: LTTR'5 ENCL 14 t C I H II 4 a I ill f a II II~S 0 a CRM Carolina Power&Light Company JUL 16 1984 SERIAL: NLS-84-323 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 EMERGENCY PLANNING PUBLIC INFORMATION BROCHURE
Dear Mr.Denton:
In response to the Shearon Harris Nuclear Power Plant (SHNPP)Safety Evaluation Report (SER)Open Item No.12 on Emergency Preparedness, Carolina Power&Light Company hereby submits the Emergency Planning Public Information Brochure for your review.Additional information, regarding this specific portion of SER Open Item No.12 can be found in SER Section 13.3.2.7 (Pages 13-38 and 39).If you have any questions, please contact Mr.Gregg A.Sinders at (919)836-8168.Yours very truly, GAS/ccc (357GAS)S~mmer man Manager Nuclear Licensing Section CC: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
Mr.J.P.O'Reilly (NRC-RII)Mr.G.E.Simonds (NRC-EPB)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)Ba07190la2 8OO7le,l PDR ADOCK 05000400'(F PDRi h o<<411 Fayettevttte Street~P.O.Box 1551 o Raleigh, N.C.27502
't il lc b, This booklet tells you what to do if there is an emergency at the Harris plant.An emergency is not likely.Yet to be sure that you will be safe, state and local officials have made special plans to protect you.This booklet is part of the safety plans for the Harris plant.These offices set up the plans:~North Carolina Division of Emergency Management aChatham County Emergency Management Agency~Sanford-Lee County Department of Emergency Management aWake County Emergency Management Agency~Carolina Power and Light Company Please read through this booklet now.Then keep a copy in a handy place at home.Be sure there is also a copy where you work.You can hang the booklet up and use the calendar inside.That way you will have the plans ready if you need them.
This booklet tells you what to do if there is an emergency at the Harris plant.An emergency is not likely.Yet to be sure that you will be safe, state and local officials have made special plans to protect you.This booklet is part of the safety plans for the Harris plant.These office's set up the plans.North Carolina Division of Emergency Management Chatham County Emergency Management Agency Sanford-Lee County Department of Emergency Management Wake County Emergency Management Agency Carolina Power 8c Light Company You might have questions about this booklet or want.more copies of it.If so, please call or write one of these offices now.Chatham County Emergency Management Agency P.O.Box 4Z8 Pittsboro, N.C.2731Z (Courier Box 322)(919)542-2911 Harnett County Emergency Management Agency P.O.Box 6 Erwin, N.C.28339 (919)897-8130 Sanford-Lee County Dept.of Emergency Management P.O.Box 1154 Sanford Municipal Building ZZ5 Weatherspoon Street Sanford, N.C.27330 (Courier Box 331)Wake County Emergency Management Agency Suite 921, County Office Building P.O.Box 550 Raleigh, N.C.27602 (919)755-6245 (919)775-3941 N.C.Division of Emergency Management-116 West Jones Street Raleigh, N.C.27611 (919)733-3867 Harris Visitors Center Carolina Power 8r, Light Company P.O.Box 3Z7 New Hill~N.C.27562 (919)362-8633 gag 5Af.&7/~S Wmpov6o n.t~~LLs The Shearon Harris Nuclear Power Plant near New Hill will start to produce power in 1985.Commercial operation will start in 1986.Carolina Power Ec Light Company has built the plant to be run safely.Like all nuclear plants, the Harris plant will be run under strict safety rules.These have been set and are watched by the Nuclear Regulatory Commission (NRC).This is the office which has been set up to be sure nuclear plants are safe.The NRC says each plant must hold an emergency test each year.State and local agencies are tested at least once in two years.These tests check on emergency plans.They are graded by each of these groups.~The Nuclear Regulatory Commission (NRC)The Federal Emergency Management Agency (FEMA)~The State of North Carolina The Counties of Chatham, Harnett, Lee, and Wake~Carolina Power 5 Light Company Sirens are also tested often.(Look at page 10 to find out more about these tests.)A serious emergency that might be of danger to you would take place over a period of time.Remember that if you hear the sirens you can find out what to do if you tune in an EBS station.You can learn the news and find out if there is an emergency at the plant.To help you understand the broadcasts, the words used for emergencies are defined in the box below.Please read them.Classes of Problems Four classes of problems could occur at the plant.These classes are set by the NRC.They tell plant, county and state officials what they should do for each type of problem.~Uagsu81 Event.This is the least serious type of problem.It might lower the safety of the plant.State and county officials would be told.~Al~This means a more serious type of problem.It may lower plant safety more than an Unusual Event.State and county officials would be told.A serious emergency at the Harris plant is not likely for two reasons.First, it was planned and built with many safety systems.Second, both CPRL and government agencies watch as it operates.No energy source can be free of all risk even though such steps have been taken to make it safe.That is why special safety plans like these have been made.They can help people who live near the plant to be safe if an emergency were ever to happen.In case of an emergency, you need to know this booklet so you and your family can be safe.Please read it now.Talk about it with your family and your friends.If you know someone who cannot read, or is blind, please read the booklet to them.Call or write now if you have questions, The next page lists phone numbers and addresses you can use.~Sfte Area Emergency.
This means something serious has happened at the plant and it could lead to worse problems.There could be some release of radioactive material very close to the plant, but this does not always happen.State and county officials would be told and would stand by.They might have to take action to protect people near the plant.~General RmergWe)f.
This means something very serious has happened at the plant.There is a threat from radiation to the people near the plant.State and local officials would take action and tell people what to do for their safety.Officials would use EBS radio and TV stations to do this.
I Ls RgjiQ 4i Qll Radiation is all around us in the world.It is in the air, in food and water.It is in our homes.and in our bodies.This is background radiation.
Man-made radiation is used by doctors and dentists', in" the form of X'-rays and gamma rays.How much radiation do you get in these ways?It is commonly measured in"millirems." Americans get from 100 to 200 millirems ,a year from background sources.Man-made sources add about 90 more.Here are some of the amounts you might get.e Living for a year in a city like Denver that has a high altitude-about 180 millirems~Taking a plane flight from coast to coast-about 3 millirems i Watching color TV for one hour a day for a year-about 1 millirem o Living for a.year close to a nuclear power plant-less than 1 millirem Can radiation be harmful?Yes, that's why public health experts say you should get as little as you can.That means you need to avoid the radiation that could come from a nuclear accident.The counties of Chatham, Harnett, Lee, and Wake, and the State of North Carolina have set up the plan in this booklet to protect you if that should happen.Could a nuclear plant blow up?No.A nuclear plant is netlike a bomb.It cangaotexplode.
How could you be exposed to radiation in an accident at the plant?Radioactive material could get into the air and water, causing a risk to your health if you live near the Harris plant.You could then be exposed to it in three ways.~By radiation in the air and on the ground.Exposure will stop if you go to a place with no radiation.
~By radiation on hair, skin, and clothes.Exposure will stop if you wash the radiation off.o From breathing or swallowing radioactive material.Exposure will stop when one of two things happens to the material:-it stops giving off radiation-your body eliminates it How can you know how harmful the radiation will be to you?It depends on these things:~The type you get~The amount you get~The length of time you are exposed~The amount of your body that is exposed~The amount of radioactive material you breathe or take into your body The higher the level of radiation and the longer you are exposed to it, the greater the harm will be.You are not safe to stay outside while air with radioactive material passes over you.Taking shelter is the safest thing you can do until the wind carries the radioactive material away.
&ha~Mi<L it~Sirens B~l~n~J G~>Sirens were bought and put in place by CP8cL to warn you if there is an emergency at the Harris plant.To be sure they can do this, they must be tested from time to time.That means a siren blast could be a warning, but may only be a test.~How can you tell when there is a warning and not just a test?The best way is to tune in an EBS radio or TV station.If there is an emergency, these stations will stop their regular programs.They will tell you what has happened and what to do.And remember, do not evacuate if you hear the sirens.The EBS stations will tell you if that should be done.What will be different in a test.The EBS stations will not stop their regular programs.Tuning in an EBS station is always the best thing to do.Is there any other way you can tell when there is just a test?Yes, because some tests will not sound the same as warnings.Here are the kinds of tests that will be made:~Stleat Test.A silent test will be made every two weeks.In this kind of test, a silent signal is sent to each siren.The sirens should make no noise in this test.~~Quarterly"Grow]'est.
A"growl" test will be made every three months.In this kind of test, there will be a low, sound for a few seconds at a time.Each siren will sound like it is"growling" when it is tested.The dates of these"growl" tests will be announced in the local news.Full System Test.A full system test will be made at least once a year.In this kind of test, all the sirens will be turned on at the same time.The sirens will stay on for as long as three minutes, just as they may in-an emergency.
The dates of these full system tests will be announced in the local news.But to be sure there is no emergency, tune in your EBS station.Is there any other time the sirens might be turned.on?Yes, they might be turned-on in the emergency preparedness test each year at the plant.The dates of these tests will be announced in the local news.Who controls the sirens?The State of North Carolina and the counties of Chatham, Harnett, Lee and Wake.Local emergency officials turn on the sirens for tests and will also turn them on if they need to warn you of danger.
a.ll gckoolg)~$Q w))tee t&JiM.S bf plchsL'f~J.+4 S<<i@4-s++kick+4)euac~a.k~.Ia gcpvovlgQ/apcp-What if you need help to travel because of a handicap7 Fill out the card below and send it in red.That way officials can make special plans to drive-you.If you know someone else who needs help, be a good friend an'd fill out the card for them.9&Sure to send the card in now'.What if you are deaf or hard of hear-ing and cannot hear the sirens7 Fill out the card below and send it in novr.Of f i c i a I s can then make plans to let you know of a problem some other way.Be a friend to soineone else who cannot hear and fill out the card for them.Be Su!O tb Sencf%he card sn novf.What if you have no way to ride?You may have no car, can-not drive, or cannot ride with someone else.In that case, fill out the card below and send it in novI.Officials can then make plans for special places to pick you up.These places will be broad-'cast on EBS stations.Be C'ure to sand abc card tn goe.What if you have children in schools Officials will take them by bus to Evacuation Shelters more than 10 miles from the plant~not go to'QB school to picK vp your Children.Children in day care centers and in public, private and nursery schools will be evacuated by bus to Evacuation Shelters'ook at page 9 to find out where your children wi I I be taken.You can pick them up there after you sign in at your own Evacuation Shelter.What if you ha~someone in a hosp~tal 2 Or a nursing home or rest home?So not Ifo tO PtCk Chem op.Officials will care for these people.Persons who do~need medical care would be taken to Evacu-ation Shelters for their sub-zones.
Persons who do need medical care would be taken to hospi-tals more than 10 miles from the pl Patients at Southern Wake Hospital will be taken to Wake Memorial Hospital in Raleigh.
Sub-Zone Description Evacuation Route Evacuation Shelter snap oP)o-rn./~zan'u~oX pl~, incl~d~j<4-zones.a.~d eve.c~m vous s'lo 4c p~u(/~g/~v.
What does it rn:an to evacuate?This nv:ans to move to a safe place rrare than 10 miles fran the Harris plant.Do you need to eya~te as soon as you hear the sirens?No, sane people nay be told to evacuate, but not others.How can you know if you need to evacuate'?
Your EBS station will tell you vhich sub-zones need to evacuate.If you have not yet turned to the nap on page 6 and the chart on page 7, do so nour.Figure out which sub-zone you live in and put the sub-zone nurber in the blank on page l.Also, figure out your evacuation route and Evacuation Shelter.Put the route and Evacuation Shelter in the blanks on page l.What is the best way to travel in an evacuation?
Use your em car, and take others if you can.Offer a ride to nearby friends and relatives who have no way to travel.S hould you get your children fran school and take them to your Evacuation Shelter?No, if school is in session, your children will be taken by bus to an Evacuation Shelter.Do not try to pick up your children at school.'Ihis includes public, private and nursery schools.It also includes day care centers.You can pick children up at their Evacuation Shelter after you sign in at your avn Evacuation Shelter.Look at the chart on page 9 to find out vklch Evacuation Shelter your children will go to.Put that information in the blank on page l.What is the best way to be sure your ecole family knows skat to do in an evacuation?
Share the Information about your sub-zone rnatter, evacuation route, and Evacuation Shelter.You might be in different sub-zones at the time of an energency.
Plan ahead on a good place to meet that is rrore than 10 miles fran the Harris plant.Be sure all mnhers of your family know vhere that is.What if you have a handicap, or have no way to travel?Read page 8 and send in the information card.You rust send in this card neW'so plans can be nade to help you if you need help.l4w, vAat if your sub-zone is told to evacuate?Follow these steps.-Stay calm.You will have time to evacuate.-Turn off all water faucets and lights.-Turn off all appliances except refrigerators and freezers.-Pack these things to take with you.Quis booklet Q2 blankets or a sleeping bag for each person Q 2 sets of clothes for each person Q Toilet articles and bath towels Q Needed m:dicines+Baby needs Q Sane mans of identification, such as a driver's license QCar registration QCredit cards, checkbook, and cash E3 Flashlight and batteries gPortable radio and batteries-Shelter livestock and pets.Leave them food and water for tve days.Q'ou may take pets with you if you do not plan to stay at the Evacuation Shelter.You may want to stay at a oatei or with friends or relatives.-Lock al I windows and doors.-Close car windows and vents.Leave air conditioning and heaters off.-Stay tuned to an EBS station as you drive.-Follow your evacuation route to your Evacuation Shelter.-Sign in at your Evacuation Shelter.That way faniiy and friends will know you are safe.Also, you can get checked for radiation and treated if need-ed.After you sign in, you may stay at the Evacuation Shelter.0 , you nay stay at sane other place>rare than 10 miles frcm the Harris plant.-Listen to EBS stations for neve about the emergency.
Federal, state and local officials will be checking radiation levels.They wil I use the EBS stations to tell you when it is safe to go hone.-Plan to be gone fran hane for several days.If the evacuation lasts longer than that, you nay be allowed to go hme to feed pets and livestock.
Tell officials if you need to care for livestock more often than that, so that they can help you.Turn to the next two pages, with the rrap and chart, if you have not yet done that.Ihese pages tell you how to figure out the sub-zone vhere you live.Key also tell you the route to take to get to your Evacuation Shelter.Be sure you have that Information in the blanks on page 1.If you want rrore Informttion about travel in an evacuation, turn to page 8.
gf you Qcav We sirens, brune.your~de erato cg QS StRttOn.If there is an anergency at the Harris plant, the stationeay just give you news about it.Cr the stationtqkg.tell you to~Sheller or agcy for your safety.e Shelter%hat does it nnan todgkrtghalgaet yhis means to stay in a building and keep out as nneh outside air as you oan.the building could be your hme, the p you vbork, or sune other place.Taking shelter is the best thing to do if radioactive air is expected to pass over your area soon.Do you need to tashelter as soon as you hear the sirens?I4, sme people who live near the plant rray be told to take shelter, but not others.That depends on the wind and on how bad the energency is.How can you know if you need to~kasheltCt'?
Your EBS station will tell you vhlch sub-zones on the nap on page 6 need to take shelter.Turn to the nap on page 6 and the chart on page 7 and figure out which sub-zone you live in.Then put that sub-zone nmher in the blank on page 1.Vthat if your sub-zone is told to take shelter?Follow these steps.-Rmenher that children will be protected by school officials.
This includes public, private, and nursery schools.It also includes day care centers.-Shelter your livestock.
Keep your pets inside.~inside and stay there.-Close all doors and wi'ndows.-Turn off all fans, air conditioners, heaters, and furnace.-Put out the fire in your fireplace with water.Close it to outside air.-Close off any other ways outside air can get in.-Go to a roan or basement with few or no windows to avoid drafts.Take a portable radio with you if you can.-Stay tuned to your EBS radio or 1V station.You will get all news and Infomatlon that way.-Do not use the phone unless you need special help (such as in a rredlcal emergency).
Keep needed phone calls short.Phone lines rwst be free for onergency officials to use.-Stay in until the EBS station tells you it is safe to go out.You might be asked to stay in for 3 or 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.-Put a cloth over your nose and rrauth if you nust go out.Stay out as short a tine as you can.r l.r//y Ghat.Makings Bwoa.cjeask
.Neios'bout EWevgencieS The TV and radio stations in the lists on this page broadcast safety instructions in an energency.
They are called EBS, or Bnergency Broadcast System, stations.lf there is an anergency at the Harris plant, officials will turn on the sirens.ff you hear a S jr'ound+or R long bfast of 9 to S minute@>tuna 4 one of Chase Statfoat.If there is an emergency, the station will tell you vkhat to do.If there is just a test of the sirens, the station will go on with its regular prograns.(To find out nore about siren tests, turn to page'l0.)S))$0eo\t~~t)000 n Look over the lists on this page.Choose a IV and a radio station you most often listen to.Put the infomatlon about then in the blanks on page 1 if you have not yet done it.That way you can be prepared for an energency.
You can also prepare if you knev ahead of time vhat the EBS station nay ask you to do.Page 4 and page 5 give you that kind of infomation.
Radio Fre uenc Location EBS IDIO STATIOks Radio Fre uenc Location EBS TV STATIOts t~iVake Count SCS 1460-A'ol Mg 1000-W VCPE>>89.7-FM VKIX>>850-Al VQC 88.1-FM VLlE 570-Al VP JL>>1240-All VPTF 680-Al VQR>>94u7-FM VRAL>>~101.5-FM V8%>>88.9-FM 96.1-FM VETC 540-All NXE 90n0-FM VCKB 780-AM NIM" 103.1-FM Fuquay-Varina Garner Raleigh Raleigh Raleigh Raleigh Raleigh Raleigh Raleigh Raleigh Raleigh Raleigh Vbndell Buies Creek Dunn Dunn~Lee Count VKC 89.5-FM ISBL 1290-W VF jA 105.5-Rtjl
ÃGP 1050-All MMA 1570-All VERBS*107.1-FM iKCP'05.1-FM VRC 620-Nl VRR>>1490-AEI VtSK 1410-Al Wf IK*1310-Al NH 1360-kjM VBBX 1535AVl Sanford Sanford Sanford Sanford Siler City Durham Durham Durhan lhrham Durham Durham Chapel Hill Chapel Hill MRAL-TV QPIF-TV VIPkD-TV Channel 5 Raleigh Channel 28 Raleigh Channel 11 Durham NFL-TV Channel 22 Durhan>>24-hour stations>>Do vhat your EBS station tells you to do.It could differ frcm what is in this booklet.~Do not listen to ruTsrs.Your EBS station wil I give you correct ard up-to-date news.
0~Hc~~lhe.Siren s Sirens can mean many things.Fire trucks, police cars, ambulances, and others use them.But if you live as close as 10 miles from the Harris plant, sirens egg have a special meaning.They can tuel there is an emergency at the plant.What will happen in an emergency?
CP8cL will call state and federal officials, and officials in Chatham, Harnett, Lee, and Wake counties.These local officials will sound, the sirens.You will hear a long siren blast of 3 to 5 minutes.How can you be sure you will hear the sirens?To help you hear them, officials have placed 62 of the sirens on tall poles.Emergency workers may also use sound trucks and bullhorns to be sure you are warned.They will even knock on doors if needed.Persons on Jordan Lake and Harris Lake, or in the nearby parks, will get another warning.Boats and aircraft will use sirens, red smoke, and flares to warn them.What should be done when you hear the Notens or get one of the athar waanfpgs?Turn en you@ta8fo op Bf.Tune to one of the EBS (Emergency Broadcast System)stations on page 3.To make this easy, choose a TV station and a radio station you usually listen to.Put this information in the blanks on page 1 if you have not yet done so.That way you will be prepared for an emergency.
Whv not evacuate-leave your home or the place you work-as soon as you hear the sirens?Because the sirens may only mean a test, not an emergency.
Your EBS station will tell you if there is an emergency.
If just a test, the station will go on with regular programs.(For more information about siren tests, turn to page 10.)I But why not evacuate just to be safe?Because that may not be the safest thing.Your EBS station will tell you what is best.Pages 4 and 5 describe what you may be asked to do.Why not call someone to find out what to do?Because the phone lines will be needed for official calls.Please do not use your phone unless you need special help.What if you are deaf or hard of hearing?Officials will see that you are warned.But to do this, they must know that you need a special warning.Please fill out the card.on page 8 and send it inncnv.Make sure your friends who cannot hear fill out a card too.Be sure you and your family know what to do in an emergency.
Read through this booklet.Fill in the blanks in the box on page 1.Look at the information about TV and radio stations on the next page.It can help you start to fill in the blanks.
E~~1 Zk We~~Ts A N~ieai-'cudM-Sive~><'([Sou.<
1-ov 3 4 5~iaukes~I,~Happ.s-0 0 0 0 o/1i'lj P l7 n g(~>~~~Do Jot B+cuat8o~Tune your radio or IV to an EBS station.-Look at page 3 for the EBS stations you often listen to.-N ite infomatlon for these stations in the blanks on this page.~5gguned for news.-If there is an anergency your EBS station will tell you vivat to do.-If there is only a test, your EBS station will continue its regular pfogrÃls~Fill in these blanks so you will be ready for an anergency.
1.My EBS stations (look at page 3): TV channel Radio frequency 2.My sub-zone on the map (look at page 6): 3.Mt'vacuation route (look at page 7): 4.AP Evacuation Shelter (look at page 7): 5.My children can be picked up at (look at page 9): Chathan County Harnett County Lee County 5hke County If you need help during an evacuation call the nutber for your county.~Lfgtel to find out if your sub-zone should take shelter.-Look at page 7 to find the neer of your sub-zone.-Write it in the blank on this page.-oQthfS if you must take shelter.-Ramnher that children will be protected by school officials.
Do not go to the school.-Shelter pets and livestock.
~inside and stay there.-Close all doors and windows.-Turn off fans, air conditioners, furnace ard heaters.-Put out fires in wood stoves and fireplaces.-Go to a roan or basarent with few or no windows to avoid drafts.-Zb not use the phone.-Do not go out unless you have to.-Place a cloth over your nose and nuuth if you must go out.BSthg fiISfdL until your EBS station says it is safe to go outside.Taking shelter is the best thing to do if radioactive air is expected to pass over your area soon.Look at page 4-for rrore information.
Please read through the rest of this booklet.of.ftteg to find out if your su zone mst evacuate.-Look at page 7 to check the nurbe f your sub-zone.-Check it in the blank on this page.~Do this if you must evacuate.-Remenher that officials will take-school children by bus to Evacuation Shelters.Do not go to the schools-Shelter livestock ard pets.Leave than food and water for 2 days.Q you may take pets with you if you do not plan to stay at the Evacuation Shelter.-Lock windows and doors.oTaj9t these things with you.-Ihis booklet-2 blankets or a sleeping bag for each person-2 sets of clothes-Toilet articles and rredlcines-San: identification-Credit cards and checkbook-Baby needs F00 not LSC the photia unless you need special help.aCfaSe car windows and vents.ofollcelyour evacuation route to-your Evacuation Shelter.-Look at page 3 to get this information.-Write it in the blanks on this page.~Slgq jg at your Evacuation Shelter.You may then stay samwhere else nore than 10 miles fran the plant if you wish.Look at page 5 for mre information.
1 0 picAv.~~eg l-la.>>iS L~J=~l E 4 If you hear a 3 to 5 minute siren, turn on your radio or TV to an EBS station.Emergency information for the Harris plant is in the front of this calendar.
I~~<pact pg y g ggp.~gg V~e (j I P 1