ML18019B040

From kanterella
Revision as of 04:00, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Preoperational Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept
ML18019B040
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/18/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019B041 List:
References
NLS-86-232, NUDOCS 8606240343
Download: ML18019B040 (4)


Text

REQULAT INFORMATION DISTRIBUTIO - TEM (RIDS)

ACCESSION NBR: 8606240343 DOC. DATE: 86/06/18 NOTARIZED: NO DOCKET ¹ FACIL: 50-400 Shearon Harris Nuclear POUJer Plant> Unit 1> Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ZIMMERMAN>S. R. Carolina Potoer Zc Light Co.

RECIP. NAME RECIPIENT AFFILIATION DENTON> H. R. Office of Nuclear Reactor Regulation> Di ec tor (post 851125 c

SUBJECT:

Forwards preoperational "Reactor Containment Bldg Integrated Leakage Rate Test>" final rept; DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Licensing Submittal: PSAR/FSAR Amdts Zc Related orrespondence NOTES: Application for permit reneva) filed. 05000400 RECIP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL.

PWR-A EB 1 io PWR-A EICSB PWR-A FOB 1 ~ PWR-A PD2 LA PWR-A PD2 PD i~ BUCKLEY> B 01 2 0 PWR-* PSB PWR-A RSB INTERNAL: ADM/LFI'1B 1 ELD/HDS1 IE FILE IE/DEPER/EPB 36 IE/DGAVT/GAB 21 1 NRR BWR ADTS NRR PWR-B ADTS 1 N >M.L NRR/DHFT/}')TB 1 04 RQN2 3 RM/DDAMI/MIB EXTERNAL: .BNL(AMDTS ONLY) DMB/DSS (AMDTS)

LPDR 03 1 io NRC PDR 02 1>>

NSIC 05 1 io PNL GRUEL> R TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL

h>>>> '4h, <</hP, ")

""hh) j(v; It

! " r Il) '>>

)

',I", h l','J h,h h

>>

'I I

~ h),.

r )

! )Q 'T>>") j h h" h) t

"))'I,'Z P ) '))>> )>" ).) i '>>) I>>he)) r

>>II O II

~ i io h ~ >If>> '

8) <<

II) <<

I)h 1$ $ ll

f<<<<'.,)

) <<

' h ph o 3>> "3",1 4

I)

'

I

~ >>)i<<g' )hf>>

$ h<<'I>li h )I

~ ~ I, >> <<

h

$

>>')

4 II

'h hh h

O

'I ),) hl

CMtt, Carolina Power & Light Company JUN l8 lyS SERIAL: NLS-86-232 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO.50-000 REACTOR CONTAINMENTBUILDING INTEGRATED LEAK RATE TEST

Dear Mr. Denton:

Carolina Power i!r. Light Company hereby submits the preoperational Reactor Containment Integrated Leak Rate Test for the Shearon Harris Unit 1 reactor.

The Integrated Leak Rate Test was successfully completed on February 26, 1986.

This report fulfills the requirements set forth in 10CFR50, Appendix 3.

Should you have any questions regarding this report, please contact Mr. 3. D.

Klooster man at (919) 836-8055.

Yours very truly, S. R. Zim erman Manager Nuclear Licensing Section BM/vaw (39803DK)

Attachment cc: Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. 3. Nelson Grace (NRC-RII)

Wake County Public Library Sb0b2P0gqg Sb0 pDR ADOCK 0 o FrDR A

411 Fayettevilte Street ~ P. O. 8ox 1551 o Raleigh, N. C. 27602

'ff f 1 Q h (4'E 4~

f A '