Confirms Listed Info Re Operational Readiness Program for Facility,Per Discussions W/Nrc Ofc of Special Projects Personnel
ML18033A487
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 12/23/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8812290143
Download: ML18033A487 (7)


Text

..ACCELERATED DlSIElUTlON DEMONSTR+lON SYSTEM.a REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8812290143 DOC.DATE: 88/12/23 NOTARIZED:

NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION GRIDLEY,R.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFXLIATION Document.Control Branch (Document Control Desk)

SUBJECT:

Confirms listed info re operational readiness program*for facility,per discussions w/NRC.DXSTRXBUTION CODE: D030D COPIES RECEIVED:LTR ENCL SXZE: TITLE: TVA Facilities

-Routine Correspondence NOTES:1 Copy.each to:.S.Black, J.G.Partlow, S.Richardson B.D.Lz.aw,F.McCoy.

05000260 S 1'ECIPIENT I D CODE/NAME SIMMS, M GEARS,G INTERNAL: ACRS UDOCS-STRACT RE E Ol EXTERNAL: LPDR NSXC NOTES: COPIES LTTR ENCL 1 1 1 1 P 1 1 1 1 1 1 1 1 1 1 5 5 RECXPIENT ID CODE/NAME PD ADM/LFMB OGC/HDS2 NRC PDR COPIES LTTRENCL 1 1 1 0 1 0 1 1 TO ALL RIDSII RECIP~'LEASE HELP US 10 REDUCE KKTEl COKKCZ'IHE DOCUMENT CXKZROL DESK, ROOM Pl-37 (EXT.20079)TO EIiQCZNATE YOUR NAME FROH DIRGUK2XXGN LISTS H)R DOCUMENXS YOU DONIT NEED)R I z>I S D D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 14 TENNESSEE VALLEY AUTHORITY CHATTANOOGA.

TENNESSEE 37401 5N 157B Lookout Place U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Nashington, D.C.20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket No.50-260 BRONNS FERRY NUCLEAR PLANT (BFN)-OPERATIONAL READINESS (OR)PROGRAM This letter confirms the following information provided in discussions with the NRC's Office of Special Projects personnel regarding TVA's OR program which is described in Section V of the Browns Ferry Nuclear Performance Plan (BFNPP).1.The OR assessment for BFN unit 2 restart will be conducted at three levels: A site-managed BFN Operational Readiness Program, an independent Nuclear Power (NP)Operational Readiness Review, and a NP-directed Senior Management Assessment of Readiness for Restart.2.The work scope of the independent NP Operational.,Read.i.nes,s..

Review.wi.l.l,.be essentially the same as the OR reviews performed at'he direct'ion of'he Senior Vice President, Nuclear Power, to assess readiness for restart of the Sequoyah units.3.The Site Master Punchlist has been developed and is currently being used by TVA as part of the System Pre-operability Checklist process.The above information will be incorporated in Revision 3 of the BFNPP.A summary statement of commitments contained in this submittal is enclosed.Please refer any questions regarding this submittal to Patrick Carier, Acting Manager, BFN Site Licensing, (205)729-3570.Very truly yours, Enclosure cc: See page 2 8812290i43 SSi223 PDR ADOCK 05000260 P PDC TENNESSEE VALLEY AUTHORITY Nuclear Licensing and ,Regulatory Affairs go>An Equal Opportunity Employer 1'1 k'l l' s U.S.Nuclear Regulatory Commission cc'(Enclosure):

Ms.S.C.Black, Assistant Director for Projects TVA Projects Division U.S.Nuclear Regulatory Commission One Nhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.F.R.McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NN, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 1I.J r I r Pi 1 I I 7 II t~I 14 I ENCLOSURE

SUMMARY

STATEMENT OF COMMITMENTS The clarifications to the Operational Readiness program provided by TVA in'his letter will be incorporated in revision 3 of the Browns Ferry Nuclear Performance Plan.