==Dear Mr. Denton:==
==Dear Mr. Denton:==


In the Matter of the                    )                                                Docket Nos. 50-259 Tennessee Valley Authority              )                                                                    50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated February 1, 1983, we received a request for additional information regarding NUREG-0737 Items II.F.1.1 and II.F.1.2 for the Browns Ferry Nuclear Plant. These schedules are outlined in my January 14, 1983 letter to you which provided our revised integrated schedule for Browns Ferry. The enclosed information addresses the February 1,1983 request for additional information.
In the Matter of the                    )                                                Docket Nos. 50-259 Tennessee Valley Authority              )                                                                    50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated February 1, 1983, we received a request for additional information regarding NUREG-0737 Items II.F.1.1 and II.F.1.2 for the Browns Ferry Nuclear Plant. These schedules are outlined in my {{letter dated|date=January 14, 1983|text=January 14, 1983 letter}} to you which provided our revised integrated schedule for Browns Ferry. The enclosed information addresses the February 1,1983 request for additional information.
l                                                          Very truly yours, j-                                                          TENNESSEE VALLEY AUTHORITY L. M. Mills,                                                    nager Nuclear Licensing Subscrib      d sworn t before me this        day ofx d.          1983 W
l                                                          Very truly yours, j-                                                          TENNESSEE VALLEY AUTHORITY L. M. Mills,                                                    nager Nuclear Licensing Subscrib      d sworn t before me this        day ofx d.          1983 W
Nota @ Public              j jd.
Nota @ Public              j jd.
Line 40: Line 40:
In the' Matter of the                                )              Docket Nos. 50-259            l
In the' Matter of the                                )              Docket Nos. 50-259            l
,          Tennessee Valley Authority                            )                          50-260 L
,          Tennessee Valley Authority                            )                          50-260 L
50-296 By letter from D. B. Vassallo to H. G. Parris dated February 1,1983, we received a request for additional information regarding NUREG-0737 Items II.F.1.1 and II.F.1.2 for the Browns Ferry Nuclear Plant. These schedules are outlined in my January 14, 1983 letter to you which provided our revised integrated schedule for Browns Ferry. The enclosed
50-296 By letter from D. B. Vassallo to H. G. Parris dated February 1,1983, we received a request for additional information regarding NUREG-0737 Items II.F.1.1 and II.F.1.2 for the Browns Ferry Nuclear Plant. These schedules are outlined in my {{letter dated|date=January 14, 1983|text=January 14, 1983 letter}} to you which provided our revised integrated schedule for Browns Ferry. The enclosed
)            information addresses the February 1,1983 request for additional information.
)            information addresses the February 1,1983 request for additional information.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills,        nager Nuclear Licensing Subscrib      d sworn t before me this .        day ofx                    .
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills,        nager Nuclear Licensing Subscrib      d sworn t before me this .        day ofx                    .
Line 53: Line 53:
             ; )"'
             ; )"'
ENCLOSURE i
ENCLOSURE i
BROWNS FERRY NUCLEAR PLANT NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING NUREG-0737, ITEMS II.F.1.1 AND II.F.1.2 The integrated commitment schedule for Browns Ferry, transmitted by L. M. Mills' January 14, 1983 letter to H. R. Denton, indicated an extension in schedule for bnplementation of items II.F.1.1 and II.F.1.2, noble gas and iodine monitors.
BROWNS FERRY NUCLEAR PLANT NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING NUREG-0737, ITEMS II.F.1.1 AND II.F.1.2 The integrated commitment schedule for Browns Ferry, transmitted by L. M. Mills' {{letter dated|date=January 14, 1983|text=January 14, 1983 letter}} to H. R. Denton, indicated an extension in schedule for bnplementation of items II.F.1.1 and II.F.1.2, noble gas and iodine monitors.
We do not believe that the January 14, 1983 schedule presents a significant postponement for items II.F.1.1 and II.F.1.2 as          I indicated in D. B. Vassallo's February 1, 1983 letter to H. G. Parris. The schedule actually indicates an earlier start date for the nonoutage portion of this modification. The intent of the schedule change was to define the outage work necessary to complete the installation of instrumentation in each of the unit control rooms.
We do not believe that the January 14, 1983 schedule presents a significant postponement for items II.F.1.1 and II.F.1.2 as          I indicated in D. B. Vassallo's {{letter dated|date=February 1, 1983|text=February 1, 1983 letter}} to H. G. Parris. The schedule actually indicates an earlier start date for the nonoutage portion of this modification. The intent of the schedule change was to define the outage work necessary to complete the installation of instrumentation in each of the unit control rooms.
Previous commitment schedules had indicated nonoutage periods only for the performance of items II.F.1.1 and II.F.1.2. As the scope of this work became more clearly defined, it became evident that outage periods would be required for installation of the associated control room instrumentation. The indicated nonoutage period is for installation of the monitoring equipment and related structures while the outage periods are for installation of the control room instrumentation.
Previous commitment schedules had indicated nonoutage periods only for the performance of items II.F.1.1 and II.F.1.2. As the scope of this work became more clearly defined, it became evident that outage periods would be required for installation of the associated control room instrumentation. The indicated nonoutage period is for installation of the monitoring equipment and related structures while the outage periods are for installation of the control room instrumentation.
       ,              The monitoring equipment presently intended to be purchased has local readout capability and would be functional except for control room instrumentation upon completion of the nonoutage work.
       ,              The monitoring equipment presently intended to be purchased has local readout capability and would be functional except for control room instrumentation upon completion of the nonoutage work.
Therefore, the monitoring equipment which is common to all three units as shown on the January 14, 1983 schedule would be operable with local readout and have instrumentation installed in the unit 1 control room during the unit 1 cycle 6 refueling outage. Items II.F.1.1 and II.F.1.2 will be completely operable ty the end of the unit 1 cycle 6 outage with only the units 2 and 3 control room instrumentations scheduled for installation during their respective cycle 6 outages.
Therefore, the monitoring equipment which is common to all three units as shown on the January 14, 1983 schedule would be operable with local readout and have instrumentation installed in the unit 1 control room during the unit 1 cycle 6 refueling outage. Items II.F.1.1 and II.F.1.2 will be completely operable ty the end of the unit 1 cycle 6 outage with only the units 2 and 3 control room instrumentations scheduled for installation during their respective cycle 6 outages.
i M..}}
i M..}}

Latest revision as of 23:09, 26 September 2022

Responds to 830201 Request for Addl Info on NUREG-0737, Items II.F.1.1 & 2.F.1.2 Re Noble Gas & Iodine Monitors. Monitoring Equipment Common to All Units Would Be Operable W/Local Readout
ML20079N768
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/28/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 8303040424
Download: ML20079N768 (2)


Text

,--. .. .- -

If~

- 17 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ol 400 Chestnut' Street Tower II February 28, 1983 Mr., Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

In the Matter of the ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated February 1, 1983, we received a request for additional information regarding NUREG-0737 Items II.F.1.1 and II.F.1.2 for the Browns Ferry Nuclear Plant. These schedules are outlined in my January 14, 1983 letter to you which provided our revised integrated schedule for Browns Ferry. The enclosed information addresses the February 1,1983 request for additional information.

l Very truly yours, j- TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Subscrib d sworn t before me this day ofx d. 1983 W

Nota @ Public j jd.

My Commission Expires 9/f/ 8d 1 -

-Enclosure oc (Enclosure):

U.S. Nuclear Regulatory Commission Region-II ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia -30303 Mr. R. J. Clark Browns Ferry Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 O%

8303040424 830228 PDR ADOCK 05000259 P PDR An Equal Opportunity Employer l

_ _ _ ------- - - - - _ - - - - _ - - _ _ - - _ - - - -----_-_---_--------a l

y e

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401

j. 400 Chestnut Street Tower II l February'28, 1983 Mr. Harold R. Denton, Director Office of Nuclear React 3r Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

In the' Matter of the ) Docket Nos. 50-259 l

, Tennessee Valley Authority ) 50-260 L

50-296 By letter from D. B. Vassallo to H. G. Parris dated February 1,1983, we received a request for additional information regarding NUREG-0737 Items II.F.1.1 and II.F.1.2 for the Browns Ferry Nuclear Plant. These schedules are outlined in my January 14, 1983 letter to you which provided our revised integrated schedule for Browns Ferry. The enclosed

) information addresses the February 1,1983 request for additional information.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Subscrib d sworn t before me this . day ofx .

1983 Notapy Public j j d.

My Commission Expires 9/I / $[ *

/

Enclosure oc (Enclosure):

.: U.S. Nuclear Regulatory Commission Region II ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. R. J. Clark Browns Ferry Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 O%

B303040424 030228 PDR ADOCK 05000259 P PDR An Equal Opportunity Employer L

y

)"'

ENCLOSURE i

BROWNS FERRY NUCLEAR PLANT NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING NUREG-0737, ITEMS II.F.1.1 AND II.F.1.2 The integrated commitment schedule for Browns Ferry, transmitted by L. M. Mills' January 14, 1983 letter to H. R. Denton, indicated an extension in schedule for bnplementation of items II.F.1.1 and II.F.1.2, noble gas and iodine monitors.

We do not believe that the January 14, 1983 schedule presents a significant postponement for items II.F.1.1 and II.F.1.2 as I indicated in D. B. Vassallo's February 1, 1983 letter to H. G. Parris. The schedule actually indicates an earlier start date for the nonoutage portion of this modification. The intent of the schedule change was to define the outage work necessary to complete the installation of instrumentation in each of the unit control rooms.

Previous commitment schedules had indicated nonoutage periods only for the performance of items II.F.1.1 and II.F.1.2. As the scope of this work became more clearly defined, it became evident that outage periods would be required for installation of the associated control room instrumentation. The indicated nonoutage period is for installation of the monitoring equipment and related structures while the outage periods are for installation of the control room instrumentation.

, The monitoring equipment presently intended to be purchased has local readout capability and would be functional except for control room instrumentation upon completion of the nonoutage work.

Therefore, the monitoring equipment which is common to all three units as shown on the January 14, 1983 schedule would be operable with local readout and have instrumentation installed in the unit 1 control room during the unit 1 cycle 6 refueling outage. Items II.F.1.1 and II.F.1.2 will be completely operable ty the end of the unit 1 cycle 6 outage with only the units 2 and 3 control room instrumentations scheduled for installation during their respective cycle 6 outages.

i M..