ML20054B468: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = RO-269-82-06, RO-269-82-6, NUDOCS 8204160539
| document report number = RO-269-82-06, RO-269-82-6, NUDOCS 8204160539
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 1
| page count = 1
}}
}}

Latest revision as of 16:10, 15 March 2020

RO 269/82-06:on 820306,steam Generator 1B Indicated Tube Leak of 0.08 Gpm,Constituting Abnormal Degradation of Rcpb. Complete Investigation Rept Will Be Submitted by 820402
ML20054B468
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/19/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-269-82-06, RO-269-82-6, NUDOCS 8204160539
Download: ML20054B468 (1)


Text

'.

~

DUKE POWER COMP NY '

l'owra Dunwiwo 422 Sourn Cnuncu SinEET, CnAMWTTE, N. C. 28242

'\ \ . Q WILLI AM O. PAR M ER, J R, Vicr Paegiogg, March 19, 1982 troc O c:Anc.ro.

Sitaw PpOOuCTion 373-4083 01 91 Mr. James P. O'Reilly, Regional Administrator N / Q' /

U. S. Nuclear Regulatory Commission & 4 Region II g1CO 101 Marietta Street, Suite 3100 # Ngy. -

Atlanta, Georgia 30303 k gpR10 ., [1 Re: Oconee Nuclear Station c) w s'

Docket No. 50-269

Dear Mr. O'Reilly:

d On March 6, 1962, your office was informed that the IB steam generator had an indicated tube leak of 0.08 gal / min. This constitutes an abnormal degrada-tion of the reactor coolant pressure boundary. Reportabic Occurrence Report R0-269/82-06 providing details of this incident was to have been submitted to you by March 19, 1982, pursuant to Technical Specification 6.6.2.1.a(3).

However, the investigation of this incident and the preparation of a report are incomplete at this time. It is expected that the investigation and report will be completed, reviewed, and submitted to you no later than April 2, 1982.

V .y truly yours/

t

/

t D a. .

h. /

William O. Parker, .

JFK/php cc: Director Records Center Office of Management & Program Analysis Institute of Nuclear Pow?r Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. W. T. Orders Mr. Philip C. Wagner NRC Resident Inspector Office of Nuclear Reactor Regulation Oconce Nuclear Station U. S. Nuclear Regulatory Commission Washington, D. C. 20555 gu.tet* 9 -

0 s204160539 820319 PDR ADOCK 05000269 S PDR

[8A* g

.-- -- . _ _ . . -. - - - - .- . . - _ . . ..- .. - _ - _ . -