ML20054B468
| ML20054B468 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/19/1982 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-269-82-06, RO-269-82-6, NUDOCS 8204160539 | |
| Download: ML20054B468 (1) | |
Text
'.
DUKE POWER COMP NY '
~
l'owra Dunwiwo 422 Sourn Cnuncu SinEET, CnAMWTTE, N. C. 28242
'\\ \\. Q WILLI AM O. PAR M ER, J R, troc O c:Anc.ro.
Vicr Paegiogg, March 19, 1982 Sitaw PpOOuCTion 373-4083 91 01
/ Q' /
Mr. James P. O'Reilly, Regional Administrator N
U. S. Nuclear Regulatory Commission 4
Region II g1CO 101 Marietta Street, Suite 3100
- Ngy.
Atlanta, Georgia 30303 k
gpR10
., [1 Re: Oconee Nuclear Station c) w s'
Docket No. 50-269 d
Dear Mr. O'Reilly:
On March 6, 1962, your office was informed that the IB steam generator had an indicated tube leak of 0.08 gal / min. This constitutes an abnormal degrada-tion of the reactor coolant pressure boundary. Reportabic Occurrence Report R0-269/82-06 providing details of this incident was to have been submitted to you by March 19, 1982, pursuant to Technical Specification 6.6.2.1.a(3).
However, the investigation of this incident and the preparation of a report are incomplete at this time.
It is expected that the investigation and report will be completed, reviewed, and submitted to you no later than April 2, 1982.
V
.y truly yours/
t
/
/
h.
t D a.
William O. Parker, JFK/php cc: Director Records Center Office of Management & Program Analysis Institute of Nuclear Pow?r Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. W. T. Orders Mr. Philip C. Wagner NRC Resident Inspector Office of Nuclear Reactor Regulation Oconce Nuclear Station U. S. Nuclear Regulatory Commission Washington, D. C. 20555 0
gu.tet* 9 s204160539 820319
[8A PDR ADOCK 05000269 S
PDR g
- _ - _. -