ML20063M085

From kanterella
Jump to navigation Jump to search
Advises That RO-269/82-16 Re Separation of safety-related Cables Will Not Be Filed.Review & Evaluation Determined That Separation of Specified Cables Conforms to Established Criteria.No Further Action Required
ML20063M085
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/03/1982
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-269-82-16, NUDOCS 8209100103
Download: ML20063M085 (1)


Text

DUKE POWER GOMPANY l'.o.Hox 33180 CHAHl.OTTE. N.O. 28242 IIAL It TUCKEH Teternoss vu,a ene..socier (704) 373-4NM m.m.. .

September 3, 1982 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Oconee Nuclear Station Docket No. 50-269

Dear Mr. O'Reilly:

On August 20, 1982 your office was notified of a r-portable occurrence invalving separation of safety-related cables. Reportable Occurrence Report RO-269]T2-16 3 _

providing details of this incident was to have been submitted to you by S4tember d, 1982. A review and evaluation has been performed on the separation of thD subje'etC safety-related cables. The review has determined that the separation of cohe spen ified cables conforms to the established criteria and no further action is requtygd.

Hence, it is considered that this occurrence is without safety significadee and3/5 is not reportable. NQ OL Very truly yours, h[)

3-Hal B. Tucker JFK/php r cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. W. T. Orders NRC Resident Inspector Oconee Nuclear Station Records Center Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339 Mr. Philip C. Wagner Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

~'

Op.1lCIAb b 8209100103 020903 PDR ADOCK 05000269 S PDR Ib p M

.. - _ _ _