 Issue dateTitleTopic
ML20148S31430 June 1997Ro:On 970422,Oconee Unit 2 Was Shut Down Due to Leak in Rcs. Leak Was Caused by Crack in Pipe to safe-end Weld Connection at RCS Nozzle for HPI Sys A1 Injection Line.Unit 1 Was Shut Down to Inspect Hpis Injection Lines & Implement Ldst Mods
ML20117A59823 November 1992Special Rept:On 921119,ability of Control Battery Racks to Withstand Seismic Event Could Not Be Confirmed & Batteries Declared Inoperable.Batteries Expected to Be Restored in TS Required Time
ML20236T07925 November 1987Advises LER 269/87-09,re Degradation of More than One Functional Unit of Emergency Power Switching Logic for Units 2 & 3,in Preparation & Will Be Submitted by 871215. Incident Originally Discussed in Special Rept
ML20210J6673 February 1987Special Rept:On 861113-14,1206 & 23,spurious Fire Alarms Annunciated in Control Room.On 870118,unit Shut Down Due to Problems W/Detectors.Cause Undetermined.Technicians Investigating Potential Problem W/DetectorsFire Watch
Hourly Fire Watch
ML20215N40120 October 1986Special Rept:On 860808,during Shutdown for Maint,Found Unidentified Wires in Environmentally Qualified Limitorque motor-operated Valves.Caused by Mfg Deficiency.Wires ReplacedTime of Discovery
ML20209C18713 August 1986Special Rept:On 860707,fire Barrier Penetration Nonfunctional.Caused by Design Deficiency Due to Ineffective Communication Between Design Groups.Fire Watch Established. Notice Initiated Requiring Installation of Fire WallFire Barrier
Continuous fire watch
Fire Watch
Grace period
ML20212D22229 July 1986Special Rept:On 860606,determined That Inadequate Assurance Existed Re Use of Qualified Grease in All Limitorque Operators.Appropriate Programs Not Updated to Reflect Revs. Lubrication Records Reviewed
ML20210N56414 April 1986Special Rept:On 860206,fire Wall Determined to Be Degraded. Caused by Personnel Failure to Recognize That Removing Small Amount of Pyrocrete Would Degrade Fire Wall.Fire Wall Repaired & Declared Fully Functional.Part 21 RelatedFire Barrier
Fire Watch
Hourly Fire Watch
ML20137D64822 November 1985Ro:On 851119,Keowee Hydro Unit 2 Inoperable Beyond Oconee Tech Spec Limit Due to Burned Out Laminated Copper Connection Between Two Coils.Caused by Cracked Brazement. Connector & Field Coils Will Be Replaced
ML20135D77821 August 1985Ro:On 850722,CRD Dc Breaker CB-1 Failed Trip Time Requirement During Channel C Reactor Protective Sys on-line Test.Cause of Failure Could Not Be Determined.Failed CB-1 Breaker Placed in Tripped Position
ML20129G04424 May 1985Ro:On 850425,batch of Powdex Resin from Powdex Cells 1A & 1D Transferred to Chemical Treatment Pond 2 Instead of Powdex Backwash Tank.Caused by Misalignment of Valve CTP-7.Valve Correctly Positioned
ML20108E53414 February 1985Special Rept:On 850114,CRD Dc Breaker Failed Slow During Channel D Reactor Protective Sys on-line Test.Caused by Sticking Trip Latch Roller Bearings & Excessive Trip Latch Operating Torque.Breaker Front Frame Replaced
ML20112D07714 December 1984Special Rept:On 841109,many Fire Barriers Did Not Meet Surveillance Insp Acceptance Criteria & Declared Inoperable. Caused by Const/Installation Deficiency,Component Failure/ Malfunction & Some Unknown Causes.Firestops RepairedFire Barrier
Fire Watch
Hourly Fire Watch
ML20099E02424 October 1984Special Rept:On 840927,discovered That Contaminated Oil Shipped to Lee Steam Station for Disposal by Incineration. Caused by Misinterpretation of Regulations.Shipments of Contaminated Oil Halted
ML20093F1918 October 1984RO 269/83-16,revising 831107 Commitment Re Completion Date of 850101 to Relocate Hydrogen Purge Unit Connection Near Permanent Hookup Connections on Each Unit for Hydrogen Recombiner
ML20093L5065 October 1984Special Rept:On 840906,batch of Powdex Resin from Powder Cells 2D & 2E Transferred from Plant to Chemical Treatment Pond 1 Instead of to Powdex Backwash Tank.Caused by Misalignment of Valves of Chemical Treatment Ponds 5 & 6
ML20106B4793 October 1984Special Rept:On 840928,power Circuit Breaker 22 Explosively Short Circuited,Causing Power Circuit Breaker 9 to Open, Isolating 230 Kv Overhead Line from Primary OL Power Source. Breaker Reclosed
ML20096A10622 August 1984Suppl to Rev 1 to RO-287/83-13:containment Isolation Valve 3CS-5 Declared Inoperable Due to Leakage Past Seat. Investigation Into Valve Failure Conducted & Diaphragm Replaced
ML20094N86027 July 1984RO 269/83-20 Re Trip Shaft & Bearing Assembly Portions of CRD Breaker Front Frame Assemblies.Nine of 17 GE Frames Defective.Util Awaiting Schedule for Delivery of New Frames
ML20092A4296 June 1984Special Rept:On 840419,during Fuel Reshuffling for Cycle 8, Fuel Assembly FA 0297 Became Stuck in Fuel Location E-10 During Insertion & Fuel Assembly FA 029Q Damaged.Caused by Inadequate Procedure Change
ML20092A38430 April 1984Updated RO-269/83-20 Submitted on 840111 Re Two CRD Breakers Experiencing Delay During Testing.Ge Will Ship CRD Breaker Front Frame Assemblies on 840514.Installation Will Be Complete on All Three Units by 840731
ML20084G48518 April 1984Updated RO 269/83-17:seals at Conduit Connections Defective. Scotchcast 9 Epoxy Resin Will Be Utilized to Seal Conduit Connections,Dow Corning RTV 3145 Applied to Conduit Fittings & Conduit/Cable Seals Will Be UpgradedMoisture barrier
ML20082R7562 December 1983Ro:On 831015-16,standby Bus 2 Deenergized to Verify Emergency Power Path & CT-3 Startup Transformer Locked Out. Caused by Failure of Two Insulators Causing Short to Ground. Info Supersedes 831101 Rept
ML20082H51621 November 1983Ro:Re Loss of Power on Both Standby Buses W/Both Units Out of Svc.Investigation Incomplete.Necessary Info Will Be Submitted by 831202
ML20082C60814 November 1983Ro:On 831109,while Units Out of Svc for Planned Maint,Lee 6C Gas Turbine Tripped off-line,deenergizing Standby Buses & Placing Units in Degraded Mode Beyond Tech Spec Limit.Cause Undetermined.Next Rept by 831118Overspeed trip
ML20078P9652 November 1983Ro:On 831028,while Unit Out of Svc,Lee 6C Gas Turbine Tripped & Deenergized Both 4,160-volt Standby Buses.Cause Unknown.Lee 5C Turbine Placed on-line to Sys Grid. Investigation ContinuingOverspeed trip
ML20081K0951 November 1983Ro:On 831015-16,w/Unit 1 Out of Svc,Standby Bus 2 Deenergized to Allow Operability Verification of Underground Emergency Power Path in Accordance W/Tech Specs.On 831015, CT-3 Underwent Lockout.Caused by Bad Insulators
ML20078P88431 October 1983Ro:On 831026,w/unit Out of Svc for Maint,Lee Steam Station Gas Turbine Tripped,Deenergizing Both Standby Buses.Cause Not Determined.Redundant Buses AvailableOverspeed trip
ML20081B25217 October 1983Ro:On 831012,standby Buses Deenergized to Allow for Operability Performance Testing of Standby Bus Breakers Per Tech Specs.Testing Caused Degraded Mode Beyond Tech Spec Limit
ML20078H4124 October 1983Ro:On 830929,while Energizing 4,160-volt Standby Buses,Lee 6C Gas Turbine Tripped off-line,deenergizing Both Standby Buses & Placing Two Operating Units in Degraded Mode.Cause Undetermined Since Unit Has No Event RecorderOverspeed trip
ML20080P32727 September 1983Ro:On 830922,w/both Keowee Hydro Units Out of Svc for Planned Maint,Lee 6C Gas Turbine,Being Used to Energize Buses,Tripped Off Line.Both Standby Buses Deenergized & Units 1 & 3 Placed in Degraded Mode
ML20080M02616 September 1983Updated RO 287/83-07.Investigation Incomplete.Next Rept Expected by 831030
ML20080G2356 September 1983RO 270/83-09:on 830802,hydraulic Snubber Noted Technically Inoperable for More than 72 H.Investigation Incomplete.Next Rept Will Be Submitted by 830912
ML20076C32915 August 1983RO 287/83-07:followup to Rept Submitted on 830708. Investigation Incomplete.Supplemental Rept Expected by 830915
ML20072J20324 June 1983Ro:On 830527,certain Containment Isolation Valves May Have Failed in non-ES Position Due to Loss of Dc Power. Investigation & Rept Will Be Completed & Reviewed by 830708
ML20073Q01219 April 1983Corrected RO 269/83-07:on 830303,during Insp of Manual Containment Isolation Valves,Valve CF-19 Discovered Open. Caused by Personnel Error.Valve Closed.Core Flood Procedure & Reactor Bldg Manual Checklist Changed
ML20069K41415 April 1983Updated ROs 287/83-04,269/83-05 & 269/83-10:repts Being Reviewed & Will Be Submitted No Later than 830419
ML20072T70130 March 1983RO-287/83-04 Will Not Be Submitted by 830331 as Planned.Rept Re Open Valve on Emergency Hatch Leak Rate Test Pressurization Line Incomplete.Rept to Be Submitted by 830414
ML20072T69730 March 1983RO-269/83-10 Will Be Delayed Due to Continuing Investigation of Incident Re Partially Opened Interpersonnel Emergency Door Following Testing.Rept Should Be Submitted No Later than 830415
ML20073C40725 March 1983Informs That RO-287/83-04 Not Reportable.Results of Seismic Analysis Indicate Letdown Line Was Seismically Operable W/Lead Blankets Attached.Pipe Stress,Support Restraint & Equipment Nozzle Loads within Allowable Limits
ML20069E37411 March 1983Ro:On 830225,reactor Protective Sys Pump Power Monitor Sys Failed to Meet Operability Requirements.Investigation Incomplete at Present Time.Rept Will Be Submitted by 830325
ML20070K58523 December 1982Ro:On 821213,Region 2 Informed of Two Manual Containment Isolation Valves Discovered Open.Rept Providing Details Delayed Due to Investigation.Rept Will Be Completed & Submitted by 821231
ML20070K73123 December 1982RO 287/82-14:primary to Secondary Leak Discovered in Steam Generator 3B.Rept Will Not Be Submitted Until 830107 Contrary to Previous Commitment
ML20065L77614 October 1982Ro:On 821014,Unit 2 Core Relief Valves Declared Inoperable Due to Analysis Prompted by B&W Safety Concern.Unit 3 Valves Were Offsite Undergoing Ring Adjustment.Immediate Shutdown of Unit 2 Commenced
ML20063N2797 September 1982Informs That RO-269/82-15 Re Electrically Inoperable Valve CCW-8 Will Be Submitted by 820921.Investigation Incomplete
ML20063M0853 September 1982Advises That RO-269/82-16 Re Separation of safety-related Cables Will Not Be Filed.Review & Evaluation Determined That Separation of Specified Cables Conforms to Established Criteria.No Further Action Required
ML20063M1031 September 1982Ro:On 820818,five Reactor Coolant Pump Closure Studs Determined to Be Degraded in Size Below Acceptable SAR limits.RO-287/82-09 Will Be Completed,Reviewed & Submitted by 820910
ML20062J1725 August 1982RO 270/82-10:on 820722,util Informed NRC That Upper Surge Tank Indicator Read Below Tech Spec Min Required Water Level.Investigation & Preparation of Rept Incomplete.Final Review & Rept Expected by 820819
ML20071K34720 July 1982RO 269/82-13:on 820706,emergency Feedwater Pump Declared Inoperable When Required Surveillance Testing Discovered Not Performed.Investigation & Rept Will Be Completed,Reviewed & Submitted by 820803
ML20058D82916 July 1982RO 270/82-09:on 820616,valve 2FDW-316 Would Not Close Completely After Sampling & Affected Flow Path Declared Inoperable.Investigation & Rept Will Be Completed,Reviewed & Submitted on 820730