Monthly Operating Repts for Jan 1997 for Oconee Nuclear Station,Units 1,2 & 3
ML20138L215
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/31/1997
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20138L212 List:
References
NUDOCS 9702210155
Download: ML20138L215 (15)


Text

.

4 OPERATING DAT,) REPORT DOCKET ND 50-269 DATE February 14. 1997 DPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. Unit Name Ocenee 1 2.ReportingPeriod: January 1,1997-January 31,1997
3. Licensed Thersal Power (M t): 2568
4. Naseplate Rating (6ross Me): 934 Notes Year-to date and
5. Design Electrical Rating (Net Me): 886 cusulative capacity factors
6. Marises Dependable Capacity (Gross M e): 866 are calculated using a weighted
7. Maxisus Dependable Capacity (Net MWe): 846 average for saximus dependable
8. If Changes Occur in Capacity Ratings (itess Nusber 3 Through 7) Since Last capacity.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net M e):

10.ReasonForRestrictions,ifany:

This Month Yr.-to-Date Cusulative

!!. Hours in Reporting Period 744.0 744.0 206425.0

12. Number Of Hours Reactor Was Criticai 0.0 0.0 160433.9
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hcurs Benerator Dn-Line 0.0 0.0 157489.2 6.UnitReserveShutdownHours --0-- --0-- --0--
16. Gross Thersal Energy 6enerated (WW) 0 0 388366054
17. Gross Electrical Energy Generated ( MH) 0 0 134251076
18. Net Electrical Energy Generated (WH) -5209 -5209. 127605138
19. Unit Service Factor 0.0 0.0 76.3
20. Unit Availability Factor 0.0 0.0 76.3
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 72.3
22. Unit Capacity factor (Using DER Net) 0.0 0.0 69.7
23. Unit Forced Outage Rate 0.0 0.0 9.3
24. Shutdown Scheduled Dyer Next 6 Months (Type, Date, and Duration of Eachl:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup February 12. 1997
26. Units in Test Status (Prior to Consercial Operation): Forecast Achieved

!N!ilAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON NRC Calculated fres Generator Naseplate Data:

1037 937 KVA x 0.90 Pf=934 M 9702210155 970214 PDR ADOCK 050002 9 R

L __

.- .. . - . . . . - - - -. ~ -

.-.~ . . . - . . . , - - = . - . .

. r-  ;

5

.,. t OPERATING DATA REPORT j-DOCTET NO' 50-269 l (HIIT Oconee !  ;

BATE Februarv 14. 1997- j COMPLETED BY R.A. Williams. -!

TELEPHofE 704-382-5346

l i

' MONTH January. 1997 lE AVERAGE DAILY POWER LEVEL' lE AYERAGE DA!LY POWER LEVEL  !

.. (MWe-NetI (Infe-NetI {

' 1 :. 0 17 0

.};

2 0 18 0 i  !

'3 0 19 0  !

4 0 N 0 9 0 21 0 i

0 22 0 '

4 6

i

7 0 N 0 l 0

8 0 24 l 9 0 5 0 ,

r i

10 0 26 0

!l 0 27 0  ;

I

-12 0 26 0 j

$ t 4

1b 0 29 0 ,

14 0 30 0 i 19 0 31 0 16 0  !

i t

I L

UNIT. SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. 50-269 UNIT NAME vyunt;b i DATE uz/le/w/ -

REPORT MONTH- January 1997- COMPLETED BY x. a. w1111ams TELEPHONE (/uei-dez-dsed (1) (2) (3) ('4 ) (5)

R MET-E HOD r T- A OF LICENSE

.N Y -

S SHUT EVENT SYS- CAUSE AND CORRECTIVE.

O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO-

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE- i 1 97 1 S 552.00 B --

HJ PIPEXX EVALUATE INSPECT & MODIFY MOISTURE i SEPARATOk REHEATER DRAIN LINE &

ASSOCIATED PIPING 2 97- 1-23 S 192.00 B --

HJ PIPEXX OUTAGE EXTENDED DUE TO MOISTURE SEPARATOR REHEATER DRAIN LINE & t ASSOCIATED PIPING REPAIR ACTIVITIES t

(1) '(2) (3) (4) i F Forced - Reason- Method: Exhibit G - Instructions t S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data  !

B-Maintenance or test C-Refueling 2-Manual Scram Ent W Sheets For Licensee Event Report (LER 3-Automatic Scram D-Regulato n Restriction 4-Other (Explain) File ( M EG-0161))

E-Operator Training & License Examination F-Administrative (5)- -

i G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) 1 4

.ci. --p--.- .

p.ri e .g h- tw,*v-.vm e, ,,ea-et-, -.g . Law... %+.*,ew-w mv.-m,-,w$q y- mwwygg.-. wpmr -,

m 9 -..el.g y s-m,-- g-+ew -

.-r-- .+e-ei--w- - me-

4 1

l l

DOCKET: 50-269 UNIT: Oconee 1  !

DATE: 02/14/97 l NARRATIVE

SUMMARY

MONTil: January,1996 i

Oconec Unit I began the month of January in an outage to evaluate, inspect and modify moisture separator j reheater drain line and associated piping. On 01/23/97 at 2400 the outage was extended due to moisture separator reheater drain line and associated piping repair activities. The unit remained in the outage the ,

remainder of the month.

i i

[

r i

i I

i 4

'i I

?

Prepared by: R. A. Williams  !

Telephone: (704)-382 5346 l i

l

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Qconee. Unit 1
2. Scheduled next refueling shutdown: August 1997
3. Scheduled restart following refueling: September 1997 Tile PROJECT MANAGER IIAS BEEN ADVIFED BY SEPAP. ATE COMMUNICATION OF l ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4  !

TIIROUGil 6 WILL NO LONGER BE MAINTAINED IN TIIIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? i If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee .

regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information. .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 17_7 (b) in the spent fuel pool: 974*

(c) in the ISFSI: 960"" l

8. Present licensed fuel pool capacity: 1112 Size of requested or planned increase: ** ,
9. Projected date oflast refueling which can be accommodated by present license canacity: February
g. . .

DUKE POWER COMPANY DATE: February 14.1997

! Name of Coritact: R. A. Williams Phone: (704)- 382-$346 i

  • Represents the combined total for Units 1 and 2

" On January 29,1990, received a license for ISFSI which will store 2112 assemblies

  • " 'Ihis date is based on 88 Dry Storage Modules. We currently have 40 modules (960 spaces).

Additional modules will be built on an as-needed basis.

"" Represents the combined total for Units 1,2, and 3

OPERATING DATA REPORT DOCKET NO 50-270 DATE Februarv 14. 1997 OPERATING STATUS COMPLETED BY _ R.A. Wi'llass TELEPHONE 704-382-5346

1. Unit Nase: Oconee 2
2. Reporting Period: January 1, 1997-January 31,1997
3. Licensed Thereal Power (M t): 2568
4. heeplate Rating (Gross Mhl: 934 Notes Year-te date and
5. Design Electrical Rating (Net Mh ): 886 cumulativecapacityfactors
6. Marious Dependable Capacity (6 toss Me): 886 are calculated using a seighted
7. Marious Dependable Capacity (Net We): 846 average for sarious dependable
8. If Changes Occur in Capacity Ratings Citees Nueber 3 Through 7) Since Last capacity.

Report. Give Reasons:

1

9. Power Level To Which Restricted, If Any (Net MW ): i
10. Reason For Restrictions If any i

i This Month Yr.-to-Date Cuaulative

!!. Hours In Reporting Period 744.0 744.0 196345.0'  !

12. Number Of Hours Reactor hs critical 0.0 0.0 155009.9
13. Reactor Reserve Shutdown Hours --0<- --0-- - *
14. Hours Generator On-Line 0.0 0.0 153001.0
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thereal Energy Generated (MH) 0 0 374505158 l
17. Gross Electrical Energy Generated ( WH) 0 0 lE8269799 .
19. Net Electrical Energy Generated ( WHI -9471 -8471 122145274
19. Unit Service Factor 0.0 0.0 77.9
20. Unit Availability Factor 0.0 0.0 77.9 l
21. Unit Capacity Factor (Using MDC ' ret) 0.0 0.0 72.7 t
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 70.2 l
23. Unit Forced Outage Rate 100.0 100.0 10.0  ;
24. Shutdenn Scheduled over Next 6 Months (Type, Date, and Duration of Eachl:  !

None  !

i

23. If Shut Denn At End Of Report Period. Estiaated Date of Startup: February 03, 1997 .
26. Units In Test Status (Prlor to Consercial Operation): Forecast Achieved ,

INiilALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NRC Calculated free Generator baseplate Data

-1 037 937 KVA : 0.90 Pfs934 W l

i

,,.  ;. 4 i

OPERAi!NGDATAREPORT DOCKET W - 50-270 Im!T Oconee 2  !

DATE February 14. 1997 COMPLETER BY R.A. Willians  !

TELEPHONE 704-382-5346 l i

I NONTH Ja-- v. 1997 RE . AVERA8E DAILY POWER LEVEL RE AYERA6E DAILY POWER LEVEL (We-Net) (Nue-Met)  ;

I- 0 17 0 l

'2~ 0- 18 0 I

3 '0 19 ._,

0 4 0 20 0 j 5 0 21 0 .

6 0 22 0 i I

7 0 5 0 B 0 24 0'  ;

10 0 26 0

}

11 0 27 0 )

12 0 29 0 l 13 0_ 29 0

)

i 14 0 30 0 J 15 0 31 0 16 0

'l

4 UNIT SHUTDOWMS AWD POWER REDUCTIONS DOCKET NO. 50-270 UNIT.NAME vt,vage. 2 DATE uz/14/y/__.

REPORT MONTH January 1997- COMPLETED BY x. A _. niillams TELEPHONE. ttus;-sez_dese (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE

+- O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PW. EVENT RECURRENCE 1 97 1 F 360.00 A --

HJ PIPEXX- SECOND STAGE REHEATER DRAIN LINE RUPTURE 2 '97- 1-15 F 384.00 A --

HJ PIPEXX OUTAGE DELAY DUE TO 2ND STAGE REHEATER DRAIN LINE~ RUPTURE REPAIR-ACTIVITIES i (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data

, B-Maintenance or test 2-Manual Scram Entry.Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER l D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-OheratorTraining&LicenseExamination

! F-A ministrative (5) i G-Operator Error Exhibit I - Same Source l H-Other (Explain) (Explain)

_ _ _ . . - . . . _ . . ~ _ . . . . . , . ~ , _ . _ . . _ . _ - . . . , _ , . . . - _ . . - . _ . _ . . . . _ . . . _ . . . . _ . . . _ . - _ . , _ _ . - . . _ . . _ . . - . _ . _ . _ . . , _ _ _ . . . . . . . _ . _ _ . _ _ _ _ . . , . - - _ _ _ _ _ - _ _ _ . _ _ . . _ _ . . _ _ _ _ _

. . - . - -. . . . . .. . . - - - . . - ~ - .-

x.-

=,., , .

}

DOCKET: 50-270 i UNIT: Oconee2 Date: 02/14/97

-i NARRATIVE

SUMMARY

I l

. MONTil: January,1996

- Oconee Unit 2 began the month of January in an outage due to second stage reheater drain line rupture. On

- 01/15/97 at 2400 the outage was delayed due to second stage reheater drain line rupture repair activities. ,

'Ihe unit remained in the outage the remainder of the month. l l

t s

P i

i i

I l

l Prepared by: R. A. Williams Telephone: (704)- 382-5346

. I

. ., 1

  • s t

. j i

j MONTHLY REFUELING INFORMATION REOUEST

. 1. Facility name: Oconee. Unit 2 ,

2. Scheduled next refueling shutdown: February 1998 -

} 3. Scheduled restart following refueling: Merch 1998 i l i T118 PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4  !

, THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS 2EPORT. l l

. 4. Will refueling or resumption of operation thereafter require a technical specification change or )

other license amendment?

. - If yes, what will these be? -  ;

4 If no, has reload design and core configuration been reviewed by Safety Review Committee

, regarding unreviewed safety questions?

i

5. Scheduled date(s) for submitting proposed licensing action and supporting information.  ;

i

6. Imponant licensing considerations (new'or different design or supplier, unreviewed design or I

4 performance analysis methods, significant changes in design or new operating procedures).

7. Number of Fuel assemblies  ;

(a) in the core: 122 i (b) in the spent fuel pool: 974*

(c) in the ISFSI: See unit I ""

i  :

, t

! 8. Present licensed fuel pool capacity: 1312 1

{ Size of requested or planned increase: "

t i

9. Projected date oflast refueling which can be accommodated by present license capacity: October 3 g. . .

DUKE POWER COMPANY DATE: February 14.1997 i

]

! Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

  • Represents the combined total for Units I and 2

" See footnote on Unit 1

"* This date is based on 88 Dry Storage Modules. We currently have 40 modules (960 spaces).

Additional modules will be built on an as needed basis.

]

"" See footnote on Unit I i

i i

-1 t

t OPERATIN6 DATA REPORT i

l DOCKET N0 50-287 DATE February 14. 1997 OPERATING STATUS COMPLETED BY R.A. Willines -

TELEPHONE 704-382-5346

1. Unit Naee Oconee 3  :
2. Reporting Period: January 1, 1997-January 31,1997 -
3. Licensed Thereal Power (Mt): 2568 ,
4. Waeeplate Rating (6ross Me): 934 Notes Year-to date and  !
5. Design Electrical Rating (Net M e): B86 casulativecapacityfactors l
6. Maxieue Dependable Capacity (Gross MWe): 886 are calculated using a neighted  !

= 7. Maxieue Dependable Capacity (Net Me): 946 average for earlaus dependable - ,

8, if Changes Occur in Capacity Ratings (Itees Musber 3 Through 7) Since Last capacity.- ,

Report. Give Reasons:

l l

9. Power Level To Which Restricted, if Any (Net Me): I
10. Reason For Restrictions, if any  ;

i ThisMonth Yr.-to-Date Cueviative ,

I 11.HoursinReportingPeriod 744.0 744.0 193992.0 j

12. Number Of Hours Reactor Was Critical 0.0 0.0 150111.1 i
13. Reactor Reserve Shutdown Hours --0-- - -  ;
14. Hours Generator On-Line 0.0 0.0 14B292.7 19.UnitReserveShutdownHours --0-- --0-- --0--
16. Gross Thereal Energy 6ewrated (MH) 0 0 369366633 L i
17. Gross Electrical Energy Generated (MH) 0 0 127544077
10. Net Electrical Energy 6enerated (MH) -3711 -3711 121660974
19. Unit Service Factor 0.0 0.0 76.4 t
20. Unit Availability Factor 0.0 0.0 76.4
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 73.3
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 70.7
23. Unit Forced Outage Rate 0.0 0.0 9.6
24. Shutdoen Scheduled Over Next 6 Nonths (Type, Date, and Duration of Eachl:

None

25. If Shut Down At End Of Report Period. Estisated Date of Startup February 23, 1997
26. Units in Test Status (Prior to Coesercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

- CONNERCIAL OPERATION NRC Calculated free Generator Naseplate Datal 1 037 937 KVA : 0.90 Pfs934 W ~

OPERATING MTA REPORT DOCKET N0 50-287 UNIT- Oconee 3 MIE February 14. 1997 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH !anuary,1997 lM, AVERAGE MILY POWER LEVEL RM. AYERAGE DAILY POWER LEVEL (Nue-Met) (luie-Net) 1 0 17- 0 2 0 IB 0 3 0 19 0 ,

l k 0 N 0 5 0 21 O -

1 6 0 22 0 l

7 0 ~ 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 .

I

.14 - 0 30 0 15 0 31 0 16 0 ~!

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-287 .

UNIT NAME v y u a t c. 3 _

DATE uz /14 / y /

REPORT MONTH January 1997 COMPLETED BY x. a. Williams TELEPHONE tfusi .soz-9346 (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AhT CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 97 1 S 720.00 B --

HJ PIPEXX EVALUATE INSPECT & MODIFY MOISTURE SEPARATOft REEEATER DRAIN LINE &

ASSOCIATED PIPING 2 97- 1-30 S 24.00 B --

HJ PIPEXX OUTAGE EXTENDED DUE TO MOISTURE SEPARATOR REHEATER DRAIN LINE &

ASSOCIATED PIPING REPAIR ACTIVITIES (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test C-Refueling 2-Manual Scram 3-Automatic Scram Ent W Sneets For Licensee Event Report (LER)

D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

,o . .

4 DOCKET: 50-287 UNIT: Oconee 3 Date: 02/14/97 NARRATIVE

SUMMARY

MONTil: January,1996 Oconec Unit 3 began the month of January in an maintenance outage to evaluate, inspect and modify moisture separator reheater drain line and associated piping. On 01/30/97 at 2400 the outage was extended due to moisture separator reheater drain line and associated piping repair activities. End -of-cycle 16 refueling outage has spanned 119.48 days of which 75.48 days are attributed to the on going maintenance -

activities to evaluate, inspect and modify moisture separator reheater drain line and associated piping. The unit remained in the outage the entire month Prepared by: R. A Williams Telephone: (704)- 382-5346

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Oconee. Unit 3
2. Scheduled next refueling shutdown: Currently Refueline
3. Scheduled restart following refueling: February 1997 TIIE PROJECT MANAGER 11AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TliROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committec ,

regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information. ,

i

6. Important licensing considerations (new or different design or supplier, unreviewed design or perfonnance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 122 (b) in the spent fuel pool: 152 1 (c) in the ISFSI: See Unit 1 **" {
8. Presentlicensed fuelpoolcapacity: 821 Size of requested or planned increase: "
9. Projected date oflast refueling which can be accommodated by present license capacity: Luly u 2014 "
  • DUKE POWER COMPANY DATE: February 14.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

" See footnote of Unit 1

  • " This date is based on 88 Dry Storage Modules. We currently have 40 modules (960 spaces).

Additional modules will be built on an as needed basis.

"" See footnote on Unit i 1

i l

,