ML18004A607: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCESSION NBR FAC IL: 50-400 AUTH.NANE NCDUFFIE N.A RECIP.NANE DENTON>H.R.GRACE>J.N RE('ULA Y I NFGRNAT ION DISTR IBUTI SYSTEM (R 1DS)DOCKET 05000400 8610210340 DQC.DATE: 86/10/03 NOTARIZED:
{{#Wiki_filter:RE('ULA     Y   I NFGRNAT ION   DISTR IBUTI       SYSTEM (R 1DS)
NO Sheav on Hav v is Nuclear Po!!!er Plant>Unit 1>Cav olina AUTHOR AFFILIATION Cav olina Power Zc Light Co.RECIPIENT AFFILIATION Office of Nucleav Reactov Regulation>
ACCESSION NBR 8610210340             DQC. DATE: 86/10/03         NOTARIZED: NO             DOCKET FAC IL: 50-400 Sheav on Hav v is Nuclear         Po!!!er Plant>   Unit 1> Cav olina       05000400 AUTH. NANE            AUTHOR AFFILIATION NCDUFFIE N. A        Cav olina Power Zc Light Co.
Div ectov (post 851125 Region 2>Office of Director  
RECIP. NANE          RECIPIENT AFFILIATION DENTON> H. R.        Office of Nucleav Reactov             Regulation> Div ectov (post 851125 GRACE> J. N          Region   2>   Office of Director


==SUBJECT:==
==SUBJECT:==
Requests issuance of 40-gr GL on 861010 based on comple+ion of desi, gn const Zc pv eopera+iona I testing consistent ta/FSAR Z~suppov'ting documents.
Requests issuance of 40-gr GL on 861010 based on comple+ion of desi, gn const   Zc   pv eopera+ iona I testing consistent           ta/FSAR Z~
Safety-related updates to FSAR made thv ough SAR amend pv'ocess through Amend 37.D I STR I BUT ION CODE: B001D COPIES RECE I VED: LTR ENCL.SI ZE: TITLE: Licensing Submittal:
suppov'ting documents. Safety-related updates to FSAR made thv ough SAR amend     pv'ocess   through     Amend 37.
PSAR/FSAR*mdts Zc Related ov'respondence NOTES: Application fov permit v eneu!al f iled.05000400 RECIPIENT ID CODE/NANE P(JR-A EB PIER-A FOB P(lR-A PD2 PD PNR-A PSB INTERNAL: ADN/LFl}B IE FILE IE/DGAVT/GAB 21 NRR PWR-B ADTS NRR/DHFT/NTB R('N2 EXTERNAL: BNL(Al'IDTS ONLY)LPDR 03 NSIC 05 COPIES LTTR ENCL 1 3 3 1 1 1 1 RECIPIENT ID CODE/MANE PMR-A EICSB PNR-A PD2 LA BUCKLEY>B 01 PNR-A RSB ELD/HDS1 IE/DEPER/EPB 36 NRR BMR ADTS NRR L F 04 DANI/MIB DNB/DSS (ANDTS)NRC PDR 02 PNL CRUEL>R CL COPIES LTTR E 2 1 2 1 TOTAL NUi~fBER GF COPIES REQUIRED: LTFR 30 ENCL  
I D STR I BUT ION CODE:   B001D     COPIES RECE I VED: LTR           ENCL   . SI ZE:
~~~J'f, V'LP" C'N hl ll 4 1 Carolina Power I Ught Company P.O.Box 1551~Raleigh, N.C.27602 SERIAL: NLS-86-285 M.A.McOUFFIE Senior Vice President Nuclear Generation Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 Dr.3.Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, GA 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 FACILITY COMPLETION LETTER  
TITLE: Licensing Submittal: PSAR/FSAR *mdts                   Zc Related     ov'respondence NOTES: Application fov permit         v eneu!al f iled.                                   05000400 RECIPIENT             COPIES                RECIPIENT              COPIES ID CODE/NANE           LTTR ENCL            ID CODE/MANE          LTTR E CL P(JR-A EB                                   PMR-A EICSB                2 PIER-A FOB                                 PNR-A PD2 LA                1 P(lR-A PD2 PD                               BUCKLEY> B        01        2 PNR-A PSB                                   PNR-A RSB                  1 INTERNAL: ADN/LFl}B                     1              ELD/HDS1 IE FILE                                     IE/DEPER/EPB 36 IE/DGAVT/GAB 21                             NRR BMR ADTS NRR PWR-B ADTS                             NRR          L NRR/DHFT/NTB                                     F          04 R('N2                       3      3            DANI/MIB EXTERNAL: BNL(Al'IDTS ONLY)                     1       DNB/DSS (ANDTS)
LPDR            03        1      1      NRC PDR           02 NSIC            05                1      PNL CRUEL>   R TOTAL NUi~fBER GF COPIES REQUIRED:           LTFR     30   ENCL
 
                      ~ ~     ~
J'f, V'
LP "
C'N hl 4
ll 1
 
Carolina Power       I Ught Company SERIAL: NLS-86-285 P. O. Box 1551 ~ Raleigh, N.C. 27602 M. A. McOUFFIE Senior Vice President Nuclear Generation Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 Dr. 3. Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, GA 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 FACILITYCOMPLETION LETTER


==REFERENCE:==
==REFERENCE:==
: 1. CPtst:L Letter dated August            1, 1986    (NLS-86-209) from Mr. R. A. Watson (CP6cL) to Dr. 3.                Nelson Grace (NRC).
: 2. CPRL Letter dated September 29, 1986 (NLS-86-359) from Mr. R. A. Watson (CPRL) to Dr. 3. Nelson Grace (NRC) and Mr. H. R. Denton (NRC)
==Dear Sirs:==


1.CPtst:L Letter dated August 1, 1986 (NLS-86-209) from Mr.R.A.Watson (CP6cL)to Dr.3.Nelson Grace (NRC).2.CPRL Letter dated September 29, 1986 (NLS-86-359) from Mr.R.A.Watson (CPRL)to Dr.3.Nelson Grace (NRC)and Mr.H.R.Denton (NRC)
Carolina Power R Light Company (CPRL), an applicant for an operating license for the Shearon Harris Nuclear Power Plant (SHNPP), wishes to advise you that the design, construction, and preoperational testing at SHNPP are essentially complete as described ~
in the reference letters. These activities have been or will be completed in accordance with representations and descriptions contained in the Final Safety Analysis Report (FSAR) and supporting documents. We expect the plant and the operating organization to be operationally ready for receipt of a license on October 10, 1986. Fuel loading of the unit will be conducted in accordance with the Technical Specifications and the FSAR. To the best of our knowledge, known safety-related changes necessary to update the FSAR to current status have been made through the SAR amendment pr ocess up to and including Amendment No. 37. However, 10 CFR 50.71(e) recognizes that the FSAR is a living document subject to periodic updating to conform the plant description set forth therein to its actual status at any point in time. Further FSAR changes will be handled in accordance with 10 CFR 50.59.
CPRL has in place detailed tracking systems in use at SHNPP to identify and track completion of outstanding construction items, required hardware modifications, and test exceptions disclosed during preoperational testing and inspections. Entries are reviewed and classified so as to identify restraints to plant operational modes. Outstanding items 8610210340 861003 PDR        ADOCK 05000400 A                        PDR


==Dear Sirs:==
C 1
Carolina Power R Light Company (CPRL), an applicant for an operating license for the Shearon Harris Nuclear Power Plant (SHNPP), wishes to advise you that the design, construction, and preoperational testing at SHNPP are essentially complete as described~in the reference letters.These activities have been or will be completed in accordance with representations and descriptions contained in the Final Safety Analysis Report (FSAR)and supporting documents.
k C
We expect the plant and the operating organization to be operationally ready for receipt of a license on October 10, 1986.Fuel loading of the unit will be conducted in accordance with the Technical Specifications and the FSAR.To the best of our knowledge, known safety-related changes necessary to update the FSAR to current status have been made through the SAR amendment pr ocess up to and including Amendment No.37.However, 10 CFR 50.71(e)recognizes that the FSAR is a living document subject to periodic updating to conform the plant description set forth therein to its actual status at any point in time.Further FSAR changes will be handled in accordance with 10 CFR 50.59.CPRL has in place detailed tracking systems in use at SHNPP to identify and track completion of outstanding construction items, required hardware modifications, and test exceptions disclosed during preoperational testing and inspections.
A y l g' u,
Entries are reviewed and classified so as to identify restraints to plant operational modes.Outstanding items 8610210340 861003 PDR ADOCK 05000400 A PDR C 1 k C A y l g'u, Mr.Harold R.Denton.3.Nelson Grace NLS-86-285
 
/Page 2 currently on the tracking systems are typical of an operating plant in both scope and number.Items classified as restraints to fuel load will be closed or dispositioned prior to commencement of fuel load.Similarly, items classified as restraints to any of Operational Modes 5 through 1 will be closed or dispositioned before operation in such mode is commenced.
Mr. Harold R. Denton     . 3. Nelson Grace NLS-86-285   / Page 2 currently on the tracking systems are typical of an operating plant in both scope and number. Items classified as restraints to fuel load will be closed or dispositioned prior to commencement of fuel load. Similarly, items classified as restraints to any of Operational Modes 5 through 1 will be closed or dispositioned before operation in such mode is commenced.
To the best of my knowledge, the foregoihg addresses the remaining activities and items which bear upon your issuance of an operating license for SHNPP.Accordingly, we request that a 00-year operating license be issued on October 10, 1986.Yours very truly, M.A.McDuffie GAS/pgp (0033GAS)cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
To the best of my knowledge, the foregoihg addresses the remaining activities and items which bear upon your issuance of an operating license for SHNPP. Accordingly, we request that a 00-year operating license be issued on October 10, 1986.
Mr.L.S.Rubenstein (NRC)  
Yours very truly, M. A. McDuffie GAS/pgp   (0033GAS) cc:   Mr. B. C. Buckley (NRC)
~C~/'"a 1 (I}}
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. L. S. Rubenstein (NRC)
 
    ~C~/ '"a 1
(
I}}

Latest revision as of 07:09, 22 October 2019

Requests Issuance of 40-yr OL on 861010 Based on Completion of Design,Const & Preoperational Testing Consistent W/Fsar & Supporting documents.Safety-related Updates to FSAR Made Via SAR Amend Process Through Amend 37
ML18004A607
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/03/1986
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton, Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), Office of Nuclear Reactor Regulation
References
NLS-86-285, NUDOCS 8610210340
Download: ML18004A607 (6)


Text

RE('ULA Y I NFGRNAT ION DISTR IBUTI SYSTEM (R 1DS)

ACCESSION NBR 8610210340 DQC. DATE: 86/10/03 NOTARIZED: NO DOCKET FAC IL: 50-400 Sheav on Hav v is Nuclear Po!!!er Plant> Unit 1> Cav olina 05000400 AUTH. NANE AUTHOR AFFILIATION NCDUFFIE N. A Cav olina Power Zc Light Co.

RECIP. NANE RECIPIENT AFFILIATION DENTON> H. R. Office of Nucleav Reactov Regulation> Div ectov (post 851125 GRACE> J. N Region 2> Office of Director

SUBJECT:

Requests issuance of 40-gr GL on 861010 based on comple+ion of desi, gn const Zc pv eopera+ iona I testing consistent ta/FSAR Z~

suppov'ting documents. Safety-related updates to FSAR made thv ough SAR amend pv'ocess through Amend 37.

I D STR I BUT ION CODE: B001D COPIES RECE I VED: LTR ENCL . SI ZE:

TITLE: Licensing Submittal: PSAR/FSAR *mdts Zc Related ov'respondence NOTES: Application fov permit v eneu!al f iled. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR E CL P(JR-A EB PMR-A EICSB 2 PIER-A FOB PNR-A PD2 LA 1 P(lR-A PD2 PD BUCKLEY> B 01 2 PNR-A PSB PNR-A RSB 1 INTERNAL: ADN/LFl}B 1 ELD/HDS1 IE FILE IE/DEPER/EPB 36 IE/DGAVT/GAB 21 NRR BMR ADTS NRR PWR-B ADTS NRR L NRR/DHFT/NTB F 04 R('N2 3 3 DANI/MIB EXTERNAL: BNL(Al'IDTS ONLY) 1 DNB/DSS (ANDTS)

LPDR 03 1 1 NRC PDR 02 NSIC 05 1 PNL CRUEL> R TOTAL NUi~fBER GF COPIES REQUIRED: LTFR 30 ENCL

~ ~ ~

J'f, V'

LP "

C'N hl 4

ll 1

Carolina Power I Ught Company SERIAL: NLS-86-285 P. O. Box 1551 ~ Raleigh, N.C. 27602 M. A. McOUFFIE Senior Vice President Nuclear Generation Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 Dr. 3. Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, GA 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 FACILITYCOMPLETION LETTER

REFERENCE:

1. CPtst:L Letter dated August 1, 1986 (NLS-86-209) from Mr. R. A. Watson (CP6cL) to Dr. 3. Nelson Grace (NRC).
2. CPRL Letter dated September 29, 1986 (NLS-86-359) from Mr. R. A. Watson (CPRL) to Dr. 3. Nelson Grace (NRC) and Mr. H. R. Denton (NRC)

Dear Sirs:

Carolina Power R Light Company (CPRL), an applicant for an operating license for the Shearon Harris Nuclear Power Plant (SHNPP), wishes to advise you that the design, construction, and preoperational testing at SHNPP are essentially complete as described ~

in the reference letters. These activities have been or will be completed in accordance with representations and descriptions contained in the Final Safety Analysis Report (FSAR) and supporting documents. We expect the plant and the operating organization to be operationally ready for receipt of a license on October 10, 1986. Fuel loading of the unit will be conducted in accordance with the Technical Specifications and the FSAR. To the best of our knowledge, known safety-related changes necessary to update the FSAR to current status have been made through the SAR amendment pr ocess up to and including Amendment No. 37. However, 10 CFR 50.71(e) recognizes that the FSAR is a living document subject to periodic updating to conform the plant description set forth therein to its actual status at any point in time. Further FSAR changes will be handled in accordance with 10 CFR 50.59.

CPRL has in place detailed tracking systems in use at SHNPP to identify and track completion of outstanding construction items, required hardware modifications, and test exceptions disclosed during preoperational testing and inspections. Entries are reviewed and classified so as to identify restraints to plant operational modes. Outstanding items 8610210340 861003 PDR ADOCK 05000400 A PDR

C 1

k C

A y l g' u,

Mr. Harold R. Denton . 3. Nelson Grace NLS-86-285 / Page 2 currently on the tracking systems are typical of an operating plant in both scope and number. Items classified as restraints to fuel load will be closed or dispositioned prior to commencement of fuel load. Similarly, items classified as restraints to any of Operational Modes 5 through 1 will be closed or dispositioned before operation in such mode is commenced.

To the best of my knowledge, the foregoihg addresses the remaining activities and items which bear upon your issuance of an operating license for SHNPP. Accordingly, we request that a 00-year operating license be issued on October 10, 1986.

Yours very truly, M. A. McDuffie GAS/pgp (0033GAS) cc: Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. L. S. Rubenstein (NRC)

~C~/ '"a 1

(

I