{{#Wiki_filter:J l REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:8009180300 DOC~DATE'4/09/12 NOTARIZED:
{{#Wiki_filter:J             l REGULATOR           INFORMATION DISTRIBUTION                   STEM                     (RIDS)
YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plantg Unit 1~Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION NATSONgR,Ae Carolina Power L Light Co~REC IP~NAME RECIPIENT AFFILIATION DENTON,H,R, Office of Nuclear Reactor Regulationi DirectorPe'v aQ/v/i/$g'
ACCESSION NBR:8009180300                   DOC ~ DATE'4/09/12               NOTARIZED: YES                                   DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plantg Unit                                 1~                   Carolina       05000400 AUTH, NAME             AUTHOR AFFILIATION NATSONgR,Ae           Carolina Power L Light Co ~
REC IP ~ NAME         RECIPIENT AFFILIATION DENTON,H,R,           Office of Nuclear Reactor Regulationi Director Pe'v aQ   /v/i/$ g
  '


==SUBJECT:==
==SUBJECT:==
Forwards Rev 3 to emergency plan, Bases for rev'listed'ISTRIBUTION CODE;AOQSD COPIES RECEIVED:LTR ENCL SIZE: , 8+I TITlE: OR Submittal Emergency Prep Correspondence NOTES: RECIPIENT ID CODE/NAME NRR LB3-BC BUCKLEYgB 01 INTERNAL: ADM/LFMB IE/DEPER/IRB 12'RR/DS I/RAB RGN2 COPIES LTTR ENCL 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT,'D CODE/NAME NRR LB3 L,A IE/DEPER/EPB 06 NRR/DS I/AEB S 00 R S/EPRPB COPIES LT7R ENCL 1 0 2 2'1 1 1 1 1 EXTERNALS FEMA TECH HAZ NRC PDR, 02 NTIS 05 1 1 1 1 1 1 LPDR NSIC 03 1 1~1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 15 e o e a~1 g CÃQE Carolina Power&Light Company SEP PE t984 SERIAL: NLS-84-392 Mr.Haxold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR PONER PLANT UNIT NO~1-DOCKET NO.50-400 REVISION 3 TO EMERGENCY PLAN
Forwards Rev           3 to emergency plan, Bases for               rev TITlE:    OR CODE; AOQSD           COPIES RECEIVED:LTR Submittal Emergency Prep Correspondence ENCL
                                                                                            'listed'ISTRIBUTION SIZE:, 8+I NOTES:
RECIPIENT                COPIES          RECIPIENT,'D COPIES ID CODE/NAME               LTTR ENCL                    CODE/NAME                              LT7R ENCL NRR LB3- BC                   1          NRR            LB3  L,A                                  1    0 BUCKLEYgB     01            1    1 INTERNAL: ADM/LFMB                           1    0    IE/DEPER/EPB 06                                          2      2' IE/DEPER/IRB                  1     1   NRR/DS I/AEB                                                   1 I/RAB    12'RR/DS 1    1                        S       00                           1    1 RGN2                          1    1    R                   S/EPRPB                             1     1 EXTERNALS      FEMA TECH HAZ                1     1   LPDR                        03                          1     1 ~
NRC PDR,       02             1     1   NSIC                                                     1     1 NTIS          05            1     1 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 17             ENCL     15


==Dear Mr.Denton:==
e o
In accordance with the requirements of Generic Letter 82-14, Carolina Power&Light Company (CP&L)hereby submits thirteen (13)copies of Revision 3 to the Shearon Harris Nuclear Power Plant (SHNPP)Emergency Plan.Three (3)of the thirteen (13)copies are being sent directly to the Region II Regional Administrator, Mr.J.P.O'Reilly, by copy of this letter.The changes made in Revision 3 of the SHNPP Emergency Plan are based upon the following:
e a
1.While writing detailed procedures, CP&L discovered enhancements and consistency improvements that necessarily affected the SHNPP Emergency Plan.2.The protective action recommendations flow chart was revised to more closely follow the sequence of Information Notice 83-28 while incorporating the barriex concept of the Emergency Action Levels (EAL).3.Additional information is provided xeflecting the EAL concepts contained in Plant Emergency Procedure (PEP)-101.
~ 1 g
4.The PEPs list (Annex E)was revised to reflect the current configuration of the PEPs, which has consolidated many procedures and deleted procedures duplicating activities and pxocedures covered elsewhere in the plant manual.5.The frequency of health physics drills, involving simulated elevated airborne and liquid samples, has been reduced to annually in accordance with NUREG-0654, Revision 1.6.Other editorial and minor changes.8409180300 840'Pi2 PDR ADOCK 05000400 F'PDR.411 Fayettevilte Street o P.O.8ox 1551~Raleigh, N.C.27602 p0
 
~0 1, d 1 I'I Mr.Harold R.Denton Changes are indicated by vertical bars in the right-hand margin of the revised pages.Text pages have been printed on both sides.If you have any questions, please contact Mr.Gregg A.Sinders at (919)836-8168.Yours very truly, Ed'D R.A.Watson-Vice President Harris Nuclear Project GAS/mf (545GAS)Enclosure cc w/enclosure:
CÃQE Carolina Power & Light Company SERIAL:  NLS-84-392 SEP  PE t984 Mr. Haxold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC      20555 SHEARON HARRIS NUCLEAR PONER PLANT UNIT NO ~ 1  DOCKET NO. 50-400 REVISION 3 TO EMERGENCY PLAN
Mr.C.A.Barth (NRC)Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
 
Mr.J.P.O'Reilly (NRC-RII)**
==Dear Mr. Denton:==
Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
 
Mr.S.W.Perry (FEMA)Chapel Hill Public Library**three (3)copies Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)Mr.G.E.Simonds (NRC)R.A.Watson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.my commission expires: Q/lf/ff Notary INSTRUCTIONS FOR UPDATING PLP-201 1.Remove , but do not yet discard the entire contents of the Emergency Plan binder.2.Separate and save the following pages from the'existing Revision 2 copy that you just removed from the binder: All index tabs (1 through 7 and A through H)Figure 1.5-1 Fig'ures 1.8-1, 1.8-2, 1.8-3 Figures G-l, G-2, G-3, and G-4 3.Discard all remaining pages of Revision 2 4.Before placing the new Revision 3 into the binder, insert the pages that you have saved from Revision 2 into Revision 3 at the following appropriate places: A)Insert index tab 1 in front of page l-l B)Insert Figure 1;5-1 in front of Figure 1.5-2 C)Insert Figures 1.8-1, 1.8-2, and 1.8-3 and index tab 2 (in that order)in front of page 2-1 p D)Insert index tab 3 in front of page 3-1 E)Insert index tab 4 in front'of page 4-1 F)Insert index tab 5 in front of page 5-1 G)Insert index tab 6 in front of page 6-1 H)Insert index tab 7 in front of page 7-1 I)Insert index tab A in front of page A-1 J)Insert index tab B in front of page B-1 K)Insert index tab C in front of page C-1 L)Insert index tab D in front of page D-1 M)Insert index tab E in front of page E-1 N)Insert index tab F in front of page F-1 0)Insert index tab G in front of page G-1 P)Insert Figures G-l, G-2, G-3 and G-4 , and index tab H (in that order)in front of Annex H 5.Place all pages (except those discarded in step 3)in the order that they are now in, in the binder.0}}
In accordance with the requirements of Generic Letter 82-14, Carolina Power &
Light Company (CP&L) hereby submits thirteen (13) copies of Revision 3 to the Shearon Harris Nuclear Power Plant (SHNPP) Emergency Plan. Three (3) of the thirteen (13) copies are being sent directly to the Region                         II Regional Administrator, Mr. J.     P. O'Reilly, by copy of this letter.
The changes   made in Revision         3 of the   SHNPP   Emergency Plan are based upon the following:
: 1. While writing detailed procedures, CP&L discovered enhancements and consistency improvements that necessarily affected the SHNPP Emergency Plan.
: 2. The protective action recommendations flow chart was revised to more closely follow the sequence of Information Notice 83-28 while incorporating the barriex concept of the Emergency Action Levels (EAL).
: 3. Additional information is provided xeflecting the                       EAL concepts contained in Plant Emergency Procedure             (PEP)-101.
: 4. The PEPs list   (Annex E) was revised to reflect the current configuration of the PEPs,   which has consolidated many procedures and deleted procedures duplicating activities and pxocedures covered elsewhere in the plant manual.
: 5. The frequency of health physics               drills,   involving simulated elevated airborne and liquid samples, has been reduced to annually in accordance with NUREG-0654, Revision 1.
: 6. Other editorial   and minor changes.
8409180300 840'Pi2 PDR ADOCK 05000400 F                   'PDR.
p0 411 Fayettevilte Street o P. O. 8ox 1551 ~ Raleigh, N. C. 27602
 
            ~ 0 1,
d     I 1
'I
 
Mr. Harold R. Denton Changes   are indicated by vertical bars in the right-hand margin of the revised pages. Text pages have been printed on both sides.
If you   have any questions,   please contact Mr. Gregg A. Sinders at (919) 836-8168.
Yours very truly, Ed'D R. A. Watson Vice President Harris Nuclear Project GAS/mf   (545GAS)
Enclosure cc w/enclosure:
Mr. C. A. Barth (NRC)                   Wake County  Public Library Mr. B. C. Buckley (NRC)                 Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)           Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII)**         Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)               Mr. G. 0. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)         Dr. J. H. Carpenter (ASLB)
Mr. S. W. Perry (FEMA)                 Mr. J. L. Kelley (ASLB)
Chapel  Hill Public  Library            Mr. G. E. Simonds (NRC)
        ** three (3) copies R. A. Watson,   having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.
Notary my commission expires:   Q/lf/ff
 
INSTRUCTIONS FOR UPDATING PLP-201
: 1. Remove , but do not yet discard the entire contents of the Emergency Plan binder.
: 2. Separate and save the following pages from the 'existing Revision     2   copy that you just removed from the binder:
All index   tabs (1 through 7 and A through H)
Figure 1.5-1 Fig'ures 1.8-1, 1.8-2, 1.8-3 Figures G-l, G-2, G-3, and G-4
: 3. Discard   all remaining pages of Revision   2
: 4. Before placing the new Revision     3 into the binder, insert the pages that you have saved from Revision 2     into Revision 3 at the following appropriate places:
A)   Insert index tab 1 in front of page l-l B)   Insert Figure 1;5-1 in front of Figure 1.5-2 C) Insert Figures 1.8-1, 1.8-2, and 1.8-3 and index tab       2 (in that order) in front of page 2-1         p D) Insert index tab 3 in front of page 3-1 E) Insert index tab 4 in front 'of page 4-1 F) Insert index tab 5 in front of page 5-1 G)   Insert index tab 6 in front of page 6-1 H) Insert index tab 7 in front of page 7-1 I) Insert index tab A in front of page A-1 J) Insert index tab B in front of page B-1 K) Insert index tab C in front of page C-1 L) Insert index tab D in front of page D-1 M) Insert index tab E in front of page E-1 N) Insert index tab F in front of page F-1
: 0) Insert index tab G in front of page G-1 P) Insert Figures G-l, G-2, G-3 and G-4 , and index tab       H (in that order) in front of Annex H
: 5. Place all pages (except those discarded     in step 3) in the order that they are now in, in the binder.
0}}

Revision as of 04:19, 22 October 2019

Forwards Rev 3 to PLP-201, Emergency Plan. Bases for Rev Listed
ML18018B770
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/12/1984
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018B771 List:
References
GL-82-114, GL-82-14, NLS-84-392, NUDOCS 8409180300
Download: ML18018B770 (7)


Text

J l REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:8009180300 DOC ~ DATE'4/09/12 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plantg Unit 1~ Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION NATSONgR,Ae Carolina Power L Light Co ~

REC IP ~ NAME RECIPIENT AFFILIATION DENTON,H,R, Office of Nuclear Reactor Regulationi Director Pe'v aQ /v/i/$ g

'

SUBJECT:

Forwards Rev 3 to emergency plan, Bases for rev TITlE: OR CODE; AOQSD COPIES RECEIVED:LTR Submittal Emergency Prep Correspondence ENCL

'listed'ISTRIBUTION SIZE:, 8+I NOTES:

RECIPIENT COPIES RECIPIENT,'D COPIES ID CODE/NAME LTTR ENCL CODE/NAME LT7R ENCL NRR LB3- BC 1 NRR LB3 L,A 1 0 BUCKLEYgB 01 1 1 INTERNAL: ADM/LFMB 1 0 IE/DEPER/EPB 06 2 2' IE/DEPER/IRB 1 1 NRR/DS I/AEB 1 I/RAB 12'RR/DS 1 1 S 00 1 1 RGN2 1 1 R S/EPRPB 1 1 EXTERNALS FEMA TECH HAZ 1 1 LPDR 03 1 1 ~

NRC PDR, 02 1 1 NSIC 1 1 NTIS 05 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 15

e o

e a

~ 1 g

CÃQE Carolina Power & Light Company SERIAL: NLS-84-392 SEP PE t984 Mr. Haxold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR PONER PLANT UNIT NO ~ 1 DOCKET NO. 50-400 REVISION 3 TO EMERGENCY PLAN

Dear Mr. Denton:

In accordance with the requirements of Generic Letter 82-14, Carolina Power &

Light Company (CP&L) hereby submits thirteen (13) copies of Revision 3 to the Shearon Harris Nuclear Power Plant (SHNPP) Emergency Plan. Three (3) of the thirteen (13) copies are being sent directly to the Region II Regional Administrator, Mr. J. P. O'Reilly, by copy of this letter.

The changes made in Revision 3 of the SHNPP Emergency Plan are based upon the following:

1. While writing detailed procedures, CP&L discovered enhancements and consistency improvements that necessarily affected the SHNPP Emergency Plan.
2. The protective action recommendations flow chart was revised to more closely follow the sequence of Information Notice 83-28 while incorporating the barriex concept of the Emergency Action Levels (EAL).
3. Additional information is provided xeflecting the EAL concepts contained in Plant Emergency Procedure (PEP)-101.
4. The PEPs list (Annex E) was revised to reflect the current configuration of the PEPs, which has consolidated many procedures and deleted procedures duplicating activities and pxocedures covered elsewhere in the plant manual.
5. The frequency of health physics drills, involving simulated elevated airborne and liquid samples, has been reduced to annually in accordance with NUREG-0654, Revision 1.
6. Other editorial and minor changes.

8409180300 840'Pi2 PDR ADOCK 05000400 F 'PDR.

p0 411 Fayettevilte Street o P. O. 8ox 1551 ~ Raleigh, N. C. 27602

~ 0 1,

d I 1

'I

Mr. Harold R. Denton Changes are indicated by vertical bars in the right-hand margin of the revised pages. Text pages have been printed on both sides.

If you have any questions, please contact Mr. Gregg A. Sinders at (919) 836-8168.

Yours very truly, Ed'D R. A. Watson Vice President Harris Nuclear Project GAS/mf (545GAS)

Enclosure cc w/enclosure:

Mr. C. A. Barth (NRC) Wake County Public Library Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII)** Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. 0. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Mr. S. W. Perry (FEMA) Mr. J. L. Kelley (ASLB)

Chapel Hill Public Library Mr. G. E. Simonds (NRC)

    • three (3) copies R. A. Watson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.

Notary my commission expires: Q/lf/ff

INSTRUCTIONS FOR UPDATING PLP-201

1. Remove , but do not yet discard the entire contents of the Emergency Plan binder.
2. Separate and save the following pages from the 'existing Revision 2 copy that you just removed from the binder:

All index tabs (1 through 7 and A through H)

Figure 1.5-1 Fig'ures 1.8-1, 1.8-2, 1.8-3 Figures G-l, G-2, G-3, and G-4

3. Discard all remaining pages of Revision 2
4. Before placing the new Revision 3 into the binder, insert the pages that you have saved from Revision 2 into Revision 3 at the following appropriate places:

A) Insert index tab 1 in front of page l-l B) Insert Figure 1;5-1 in front of Figure 1.5-2 C) Insert Figures 1.8-1, 1.8-2, and 1.8-3 and index tab 2 (in that order) in front of page 2-1 p D) Insert index tab 3 in front of page 3-1 E) Insert index tab 4 in front 'of page 4-1 F) Insert index tab 5 in front of page 5-1 G) Insert index tab 6 in front of page 6-1 H) Insert index tab 7 in front of page 7-1 I) Insert index tab A in front of page A-1 J) Insert index tab B in front of page B-1 K) Insert index tab C in front of page C-1 L) Insert index tab D in front of page D-1 M) Insert index tab E in front of page E-1 N) Insert index tab F in front of page F-1

0) Insert index tab G in front of page G-1 P) Insert Figures G-l, G-2, G-3 and G-4 , and index tab H (in that order) in front of Annex H
5. Place all pages (except those discarded in step 3) in the order that they are now in, in the binder.

0