{{#Wiki_filter:-..**,:::_,',., VIRGINI A ELECTRIC AND AOWER COMP ANY, RICHMOND. VIRGIN 6 A 23261
{{#Wiki_filter:-.                                                                                           .
-October 29, 1979 Mr. James P. O'Reilly, Director Serial No. 888 Office of Inspection & Enforcement PSE&C/GLP:mac: wang U. S. Nuclear Regulatory Commission Region II Docket No. 50-339 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
                                                                                                  *
,
      '
              *,:::_
                          ,
                                                                    .
,
VIRGINI A ELECTRIC AND AOWER COMP ANY, RICHMOND. VIRGIN 6 A 23261
                                                                                        -
October 29, 1979 Mr. James P. O'Reilly, Director                                   Serial No. 888 Office of Inspection & Enforcement                                 PSE&C/GLP:mac: wang U. S. Nuclear Regulatory Commission Region II                                                         Docket No. 50-339 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==


On October 24, 1979 a report was made under the provisions of 10CFR50.55(e) concerning a defect in one conductor of a 12 conductor #14 class 1E cable.In accordance with the reporting requirements of 10CFR21, the following information is submitted:
On October 24, 1979 a report was made under the provisions of 10CFR50.55(e) concerning a defect in one conductor of a 12 conductor #14 class 1E cable.
A.Name and address of reporting individual:
In accordance with the reporting requirements of 10CFR21, the following information is submitted:
Mr. E. A. Baum, Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 B.Facility, activity and/or component affected:
A. Name and address of reporting individual:
North Anna Power Station, Unit 2 Class 1E Cable C.Name of firm constructing the facility or supplying the component, activity or service:
Mr. E. A. Baum, Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 B. Facility, activity and/or component affected:
North Anna Power Station, Unit 2 Class 1E Cable C. Name of firm constructing the facility or supplying the component, activity or service:
Cerro Wire and Cable Company Nicoll & Canner Streets New Haven, Connecticutt 06504
Cerro Wire and Cable Company Nicoll & Canner Streets New Haven, Connecticutt 06504
-D.DesAriptionofdefect, deficiency,orfailuretocomply:
    -
During the normal procedure for preparing a 12 conductor #14 cable for termination, the jacket was stripped back, and a small area of bare conductor was discovered on one of the twelve conductors
D. DesAriptionofdefect, deficiency,orfailuretocomply:
't, the cable.6 1367 289 7983 93; on20068 b cmuu mrv  
During the normal procedure for preparing a 12 conductor #14 cable for termination, the jacket was stripped back, and a small area of bare conductor was discovered on one of the twelve conductors 't, the cable.
*- 2-E.Date of determination of reportability:
6 1367 289 7983 93
October 24, 1979 F.Similar components, activities, or services:
                                                        ; on20068                           cmuu mrv b
North Anna Unit 1 G.Corrective action which has been, is being or will be taken, the individual responsible and the length of time to complete the action:
* E. Date of determination of reportability:
October 24, 1979 F. Similar components, activities, or services:
North Anna Unit 1 G. Corrective action which has been, is being or will be taken, the individual responsible and the length of time to complete the action:
The vendor has been informed and has agreed to inspect two reels of cable which were sent from the station to the vendor's manufacturing facilities. The inspection and retest of these cables should be completed by November 2, 1979.
The vendor has been informed and has agreed to inspect two reels of cable which were sent from the station to the vendor's manufacturing facilities. The inspection and retest of these cables should be completed by November 2, 1979.
H.Other information:
H. Other information:
None Any information not available at this time will be submitted in a follow-up letter as a 30-day report.
None Any information not available at this time will be submitted in a follow-up letter as a 30-day report.
Should you require further information, please contact this office.
Should you require further information, please contact this office.
truly[ur, j ,. -r_ / i ./jff. IN ll/t g _
r truly[ur,             j ,. -
,/l/'*/i ,' Sain C. Brown, Jr.
_l/ i ./jff. IN ll/t g/ _/i ,/
/, Senior Vicf President - Power / Station Engindering and Construction cc: Director, Office of Inspection and Enforcement (3) 1367 290}}
                                      '
                                                                    *
                                                        ,
                                          ' Sain C. Brown, Jr.   /,
Senior Vicf President - Power / Station Engindering and Construction cc: Director, Office of Inspection and Enforcement (3) 1367     290}}

Revision as of 13:40, 19 October 2019

Interim Deficiency Rept Re Defect in One Conductor of 12- Conductor,Number 14,Class IE Cable.Vendor Informed & Will Inspect Two Reels of Cable Sent to Util.Addl Info Forthcoming in 30-day Rept
ML19210D119
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/29/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
888, NUDOCS 7911200553
Download: ML19210D119 (2)


Text

-. .

,

'

  • ,:::_

,

.

,

VIRGINI A ELECTRIC AND AOWER COMP ANY, RICHMOND. VIRGIN 6 A 23261

-

October 29, 1979 Mr. James P. O'Reilly, Director Serial No. 888 Office of Inspection & Enforcement PSE&C/GLP:mac: wang U. S. Nuclear Regulatory Commission Region II Docket No. 50-339 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

On October 24, 1979 a report was made under the provisions of 10CFR50.55(e) concerning a defect in one conductor of a 12 conductor #14 class 1E cable.

In accordance with the reporting requirements of 10CFR21, the following information is submitted:

A. Name and address of reporting individual:

Mr. E. A. Baum, Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 B. Facility, activity and/or component affected:

North Anna Power Station, Unit 2 Class 1E Cable C. Name of firm constructing the facility or supplying the component, activity or service:

Cerro Wire and Cable Company Nicoll & Canner Streets New Haven, Connecticutt 06504

-

D. DesAriptionofdefect, deficiency,orfailuretocomply:

During the normal procedure for preparing a 12 conductor #14 cable for termination, the jacket was stripped back, and a small area of bare conductor was discovered on one of the twelve conductors 't, the cable.

6 1367 289 7983 93

on20068 cmuu mrv b
  • E. Date of determination of reportability:

October 24, 1979 F. Similar components, activities, or services:

North Anna Unit 1 G. Corrective action which has been, is being or will be taken, the individual responsible and the length of time to complete the action:

The vendor has been informed and has agreed to inspect two reels of cable which were sent from the station to the vendor's manufacturing facilities. The inspection and retest of these cables should be completed by November 2, 1979.

H. Other information:

None Any information not available at this time will be submitted in a follow-up letter as a 30-day report.

Should you require further information, please contact this office.

r truly[ur, j ,. -

_l/ i ./jff. IN ll/t g/ _/i ,/

'

,

' Sain C. Brown, Jr. /,

Senior Vicf President - Power / Station Engindering and Construction cc: Director, Office of Inspection and Enforcement (3) 1367 290