MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20205N8341999-04-0101 April 1999 Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217J9811998-04-28028 April 1998 Part 21 Rept Re Incorrect Description of Drift Specification for Model 1154,gauge Pressure Transmitters,Range Code 0 in Manual Man 4514,Dec 1992.Cause Indeterminate.Will Issue & Include Errata Sheets in All Future Shipments to Users ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML20198Q6961998-01-12012 January 1998 Part 21 Rept Re Failed Operation of Agastat EGPI004 Relay on 971129,as Reported by Limerick Station.Caused by Insufficient Soldering.Will Notify Customers Who Purchased EPI004 & ETR14XXX004 Relays During June 1996 NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility1997-12-23023 December 1997 Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility ML20217H8711997-10-15015 October 1997 Part 21 Rept Re Potential Safety Hazard for Some 3/4 Sch 40 Pipe Shipped to CP&L & VA Power Corp.Matl Has Been Found to Have Areas Where Wall Thickness Falls Below Minimum Allowed by SA 312 Specification.Customers Have Been Notified ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H7911997-09-30030 September 1997 Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected ML17309A6211997-09-29029 September 1997 Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-0041997-08-14014 August 1997 Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 ML20149J8681997-07-22022 July 1997 Part 21 Rept Re Failure of Main Steam Header Radiation Monitors Supplied by Nuclear Research Corp.Caused by Defect in Installed Basic Component.Declared Monitors Inoperable & Implemented Alternate Preplanned Monitoring Method ML20149D3121997-07-14014 July 1997 Part 21 Draft Rept Re 970606 Failure of Main Steam Header Radiation Monitors Supplied by Nuclear Research Corp.Caused by Temperature Compensation.Detectors Declared Inoperable & Removed for Repair ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem NRC-97-0005, Part 21 Rept Re 961113,EDG 11 Failed Surveillance Test 24.307.01 for LOP Coincident W/Loca.Avr Board Rev B Was Sent Offsite to an Independent Engineering Test Facility. CA Include More Analysis & Testing of AVR Board1997-02-0606 February 1997 Part 21 Rept Re 961113,EDG 11 Failed Surveillance Test 24.307.01 for LOP Coincident W/Loca.Avr Board Rev B Was Sent Offsite to an Independent Engineering Test Facility. CA Include More Analysis & Testing of AVR Board LD-97-002, Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns1997-01-17017 January 1997 Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns ML20133M2501997-01-15015 January 1997 Part 21 Rept Re Failures of GE Type AMH-4.76-250 Circuit Breakers.Caused by Bent Trip Lever.Replaced Trip Paddles, Support Bracket & Spring Discharge Link ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML20134E8171996-10-25025 October 1996 Part 21 Rept Re Bent Manual Trip Paddles in GE Magne Blast 4-kV Circuit Breakers.Investigation Revealed No Gap Between Manual Trip Rod & Manual Trip Lever.Definitive Explanation for Breaker Failures Not Been Confirmed ML18065B0111996-10-18018 October 1996 Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20112G9811996-05-29029 May 1996 Part 21 Rept Re Bechtel Job 21464 Calvert Cliffs Nuclear Power Plant DG Project.Plant Start Up Problem Rept 96-06M Addressed Oil Filter O-Rings,filter Element & Filter Holder ML20101L2051996-03-28028 March 1996 Followup to Part 21 Rept Re Failures of gould-shawmut Fuses. Initial Investigation Into Issue Revealed Certain Percentage of Fuses Developed Cracks in Fuse Elements ML20091P4271995-08-24024 August 1995 Final Part 21 Rept Re Regular Locknut Being Installed on Governor Where Thinner Locknut Required at Calvert Cliffs. Applications of Thick Nut P/N 75233A06 on Control Linkages Will Be Reviewed to Insure Applications Correct ML20083L0411995-05-0505 May 1995 Interim Part 21 Rept Re Failures of Gould-Shawmit A25X 10-15 Ampere Fuses Due to Cracking of Fuse Element.Util Not Yet Verified That Mfg Process Described Cause of Failures & Performing Own Metallurgical Analysis on Fuses ML20077M7581995-01-10010 January 1995 Part 21 Rept,Determined That Bechtel Power Corp Analysis of long-term Cooling Phase of LOCA Did Not Model Heat Transfer from RCS Metal Components to RCS Coolant.Util Asked C-E to Provide New Mass & Energy Transfer Data ML20078R2721994-12-14014 December 1994 Part 21 Rept Re Auxiliary Feedwater Pump Turbine Governor Valve Binding.Caused by Galvanic & Crevice Corrosion Between Stem & Stem Packing Components.Licensees Replaced Stem & Packing Gland Matls ML20078Q1641994-12-0909 December 1994 Part 21 Rept Re Result in Slight Increase in post-accident Containment Temp.Licensees Have No Current Operability Concerns Due to Low Ultimate Heat Sink Temps at Present Time ML20080A7681994-11-15015 November 1994 Part 21 Rept Re AFW Pump Turbine Governor Valve Binding Caused by Galvanic & Crevice Corrosion Between Stem & Stem Packaging Components.Turbine Mfg by Terry Steam Turbine Co. Licensee Plans to Periodically Exercise Valve Stems ML18153B0841994-09-26026 September 1994 Suppl to 940902 Initial Part 21 Rept Re Defect W/Governor Valves Used in turbine-driven Pumps Mfg by Dresser-Rand to Formally Addresss Written 30 Day Rept Requirement of 10CFR21(c)(3)(ii) ML18038A8971994-09-0707 September 1994 Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures ML18153B0601994-09-0202 September 1994 Initial Part 21 Rept Re Steam Drive AFW Pump Governor Valve Mfg by Dresser-Rand.Maint Procedure to Stroke Governor Valve Stem Performed Weekly & Monitoring of Corrosion Build Up in Gland Seal Leakoff Area Performed Weekly NRC-94-0072, Part 21 Rept Re Improper Installation of Thermo-Lag Fire Barrier Matl Furnished & Delivered by Thermal Science,Inc. Eight of Ten Thermo-Lag Fire Barriers Installed by Pr Sussman Co Being Replaced1994-08-15015 August 1994 Part 21 Rept Re Improper Installation of Thermo-Lag Fire Barrier Matl Furnished & Delivered by Thermal Science,Inc. Eight of Ten Thermo-Lag Fire Barriers Installed by Pr Sussman Co Being Replaced ML20070K8111994-07-20020 July 1994 Interim Part 21 Rept Re OP 38TD8-1/8 CS Injection Pump Erosion Sleeve Cavitation,Reported by Bg&E.Vendor Pursuing Evaluation to Determine Whether Situation Could Potentially Affect All Nuclear Utils Who Operate Subj Sleeve ML20070H1471994-07-15015 July 1994 Part 21 Rept Re Problems W/Thermolag Fire Barriers.Initially Reported on 940715.Replaced Thermolag Fire Barriers ML20070M6451994-04-26026 April 1994 Part 21 Rept Re anti-rotation Keys for 6-inch MOVs Mfg by Velan.New Keys Machined on-site to Dimensional Requirements of New Drawings Supplied by Vendor Installed & Performed Satisfactorily ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20058G5981993-11-17017 November 1993 Part 21 Rept Re Westronics Recorders,Model 2100C.Signal Input Transition Printed Circuit Board Assembly Redesigned to Improve Recorder Immunity to Electromagnetic Interference.List of Affected Recorders & Locations Encl ML20059L9861993-11-11011 November 1993 Part 21 Rept Re Deviation Wherein Fully Open Butterfly Valve Located 15 Pipe Diameters Upstream of Sensors Was Disturbing Flow Profile Enough to Cause Ultrasonic Meter to Indicate 3 to 4% Low.Customers Notified & Valve Removed ML20057G1511993-10-0707 October 1993 Part 21 Rept Re Westronics Model 2100C Series Recorders. Informs That Over Several Tests,Observed That Recorder Would Reset During Peak Acceleration & Door Being Forced Off Recorder.Small Retaining Clips Added to Bottom of Door ML20044G5431993-05-26026 May 1993 Part 21 Rept Re Rosemount Model 1154 Series H Pressure Transmitters W/Temp Performance Characteristics Not in Compliance W/Specs.Vendor in Process of Notifying Customers.Sample Notification Ltr to Util Encl LD-93-019, Part 21 Rept Re Defect in Input to Better Axial Shape Selection Sys (Basss) Computer Code.Caused by Inconsistency Between Basss User Documentation & Code.Initially Determined on 930205.Correct Input Provided1993-02-12012 February 1993 Part 21 Rept Re Defect in Input to Better Axial Shape Selection Sys (Basss) Computer Code.Caused by Inconsistency Between Basss User Documentation & Code.Initially Determined on 930205.Correct Input Provided ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20126F8081992-12-22022 December 1992 Part 21 Rept Re Possible Condition of Gag Plug in Cap of Valves That Cause Valves Not to Lift to Requirement for Providing Full Capacity.Affected Customers Notified.Removal of Caps &/Or Gag Plugs Recommended 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N4381999-10-25025 October 1999 Safety Evaluation Supporting Amend 17 to License DPR-9 ML20217P3551999-10-22022 October 1999 LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided ML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20217D1211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fermi 2.With ML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A8861999-09-13013 September 1999 Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20212A4481999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fermi 2.With ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20211E9891999-08-20020 August 1999 LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210L7051999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fermi 2.With ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209D7741999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 ML20209G0211999-06-30030 June 1999 GE-NE-B13-02010-33NP, Evaluation of Limerick Unit 2 Shroud Cracking for at Least One Fuel Cycle of Operation NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fermi 2.With NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with1999-06-30030 June 1999 Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195G4651999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2 NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fermi 2.With ML20209D7791999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2 ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20207H8331999-05-31031 May 1999 Non-proprietary Rev 0 to 1H61R, LGS - Unit 2 Core Shroud Ultrasonic Exam ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206J9301999-05-10010 May 1999 SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves ML20195B3021999-05-0606 May 1999 Rev 0 to PECO-COLR-L2R5, COLR for Lgs,Unit 2 Reload 5 Cycle 6 ML20206G5081999-05-0505 May 1999 Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety ML20195G4761999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2 1999-09-08
[Table view] |
Text
_ . . _ _ . _ . _ . . . _ _ _
- y. '
ColtecIndustries Fairbanks Morse
- , , Engine Olvision 701 Lawton Avenue .I Beloit, Wisconsin 535115492. 'l Telephone
- 609f364 4411 i Telecopier: 608/3644463 ,
I September 24, 1990 Office of-Inspection & Enforcement j l U.S. Nuclear Regulatory Commission 1 799 Roosevelt Road il Glen Ellyn, IL 60137 .
I: Attention: Mr. James G. ' Keppler, Director Region III _j
Subject:
Coltec Industries ~ Inc, Fairbanks Morse' Engine Division MoA- 38TD8-1/8 Emergency Generators ;l Ce.iecting Rod Nuts (Bolts) 1 P. t 21 Report Supplemental Report #1
Reference:
Our November 20, 1985 letter, same subject >
Gentlemen:
i 1
Our reference letter described our intended course of action on the potential defect involving connecting rod nuts (bolts). q We have replaced . all connecting rod assemblies nuts / bolts on the Baltimore Gas & Electric Company, Calvert Cliffs, on-site spare engine.
- We have inspected and replaced as necessary, nuts / bolts shipped to Virginia Electric & Power Company, North Anna; Detroit Edison Company, Fermi #2; and ,
j Philadelphia Electric, Limerick Station, as on-site spares, i All units are now free of the potential defect.
A copy of this report is being forwarded to the utilities involved.
! Very truly yours,
( _
NAA
~
. . riarty Manager, Utff t Sales l
gli Y' # '
9010030234 900924 PDR ADOCK 05000317 5 PDC A eve.onorc.a.c w e ine
a
.o-
p:
c U.S. Nuclear Regulatory Commission ;
c/o Document Management Branch Washington,- DC 20555 ,
Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant .
Routes 2 and 4, Lusby, MD 20657. !
Attention: L.B. Russell, Plant Superintendent ,
o Virginia Electric & Power Company North Anna Nuclear Station.
Mineral, VA 23117 Attention: E.W. Harrell, Station Manager Detroit Edison Company Fermi Unit #2 6400 North Dixie Highway-Newport, MI 48166 .
Attention: R.S. Lenart, Plant Superintendent l Philadelphia Electric Company i
2301 Market Street Philadelphia, PA 19101 '
Attention: Mr. V.S. Boyer Senior V.P., Nuclear Power t
i I