ML20009F957
| ML20009F957 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 07/20/1981 |
| From: | Spencer W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-PT21-81 10CFR-050.55E, 10CFR-50.55E, 411, NUDOCS 8108030194 | |
| Download: ML20009F957 (1) | |
Text
- -
U MiffALegpy VP VIRGINI A ELECTRIC AND POWER COMP ANY. RICHMONO, VIRGINI A 23261 July 20, 1981 Mr. Ames P. O'Reilly, Director Serial No. 411 Office of Inspection and Enforcement PSE&C/WBR:bw U.S. Nuclear Regulatory Commission Region II Docket Nos. 50-404 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 s
Dear Mr. O'Reilly:
JUL 3 l pV --
f REACTOR COOLANT SYSTEM ATTACHED PIPING j
NORTH ANNA UNIT 3
,ppot 4
/
g On January 29, 1981, NRC Region II was notified, unde 6t.
f provisions of 10CFR50.55(e) and 10CFR21, that the structural integh of certain RCS attached piping had not been verified for postulated breaks in the RCS piping.
Our review of this concern has also revealed that the structural integrity of RCS attached piping has not been verified for main steam line and feedwater line breaks.
As indicate 1 in our 30-day report (Ref.
Our letter of February 27, 1981, Serial No. 137) actions will be taken to ensure these piping and instrumentation connections are adequately designed or redesigned to withstand the effects of the afore-mentioned pipe breaks.
This letter is an interim report on this subject.
A final report will be filed following the resolution of this matter.
Very truly yours, t
,o W. C. Spencer l
Vice President - Power Station l
Engineering and Construction Services I
cc:
Mr. Robert L. Tedesco l
Division of Licensing l
l l
l bify 0
KO Og PDR I
.