ML20023E054
ML20023E054 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 05/27/1983 |
From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | Clark R, Harold Denton Office of Nuclear Reactor Regulation |
References | |
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, 257A, NUDOCS 8306070148 | |
Download: ML20023E054 (2) | |
Similar Documents at North Anna | |
---|---|
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20217H8711997-10-15015 October 1997
[Table view]Part 21 Rept Re Potential Safety Hazard for Some 3/4 Sch 40 Pipe Shipped to CP&L & VA Power Corp.Matl Has Been Found to Have Areas Where Wall Thickness Falls Below Minimum Allowed by SA 312 Specification.Customers Have Been Notified ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H7911997-09-30030 September 1997 Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML18153B0841994-09-26026 September 1994 Suppl to 940902 Initial Part 21 Rept Re Defect W/Governor Valves Used in turbine-driven Pumps Mfg by Dresser-Rand to Formally Addresss Written 30 Day Rept Requirement of 10CFR21(c)(3)(ii) ML18153B0601994-09-0202 September 1994 Initial Part 21 Rept Re Steam Drive AFW Pump Governor Valve Mfg by Dresser-Rand.Maint Procedure to Stroke Governor Valve Stem Performed Weekly & Monitoring of Corrosion Build Up in Gland Seal Leakoff Area Performed Weekly ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20044G5431993-05-26026 May 1993 Part 21 Rept Re Rosemount Model 1154 Series H Pressure Transmitters W/Temp Performance Characteristics Not in Compliance W/Specs.Vendor in Process of Notifying Customers.Sample Notification Ltr to Util Encl ML20126F8081992-12-22022 December 1992 Part 21 Rept Re Possible Condition of Gag Plug in Cap of Valves That Cause Valves Not to Lift to Requirement for Providing Full Capacity.Affected Customers Notified.Removal of Caps &/Or Gag Plugs Recommended ML18153D0811992-08-0303 August 1992 Interim Part 21 Rept Re Analysis of Klockner-Moeller Model NZM6-63,480 Volt Circuit Breakers.Initially Reported on 920701.Lever Fracture Should Be Examined to Determine If Any Cleaning Sprays or Purifying Agents Have Been Used ML20101L9661992-07-0101 July 1992 Part 21 Rept Re Discovery of Klockner-Moeller 480-volt Breaker in Tripped Condition Due to Fracture of Plastic Arm within Breaker.Two of Three Failed Breakers Sent to Mfg for Analysis.Results Expected by End of Jul 1992 ML20059M1751990-09-24024 September 1990 Supplemental Part 21 Rept 1 Re Defect in Coltec Industries, Inc Connecting Rod Assemblies Nuts/Bolts on Model 38TD8-1/8 Emergency Generators.Initially Reported on 851120.Nuts/bolts for Assemblies at Stated Plants Inspected & Replaced ML20012C1051990-03-0707 March 1990 Part 21 Rept Re Several Failures of Fairbanks Morse Engine Div Piston Pins/Bushings on Upper Pistons.Caused by Incorrect Surface Pattern on Piston Pins.Piston Pins Under Listed Purchase Orders to Be Removed & Replaced ML18153C1011990-02-0202 February 1990 Part 21 Rept Re Two of Three Pc Cards in GE Type SLV11A1 Over/Undervoltage Relays Failing to Produce Output.Short Between Leads Would Result in Damage to Component 1C5. Sketch of Threshold Detection Board Encl ML20247D3011989-07-12012 July 1989 Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified ML20246K7401989-04-26026 April 1989 Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves ML20205F3211988-10-10010 October 1988 Part 21 Rept Re Potential Deviation from Tech Spec Concerning Ry Indicators Due to Operating Temp Effect on Analog Meter Movement.Initially Reported on 881006.Customers Verbally Notified on 881006-07 ML20153F4151988-08-12012 August 1988 Part 21 Rept Re Procurement of Heat Tracing Matls from Nelson Electric Corp Not Meeting 10CFR21 Requirements. Initially Reported on 880810.Nelson Electric Corp Removed from Approved safety-related Vendor List ML20235U0271987-10-0707 October 1987 Part 21 Rept Re Westinghouse Plant Steam Generator Tubes Susceptible to High Cycle Fatigue Failure Similar to 870715 Event at North Anna Unit 1.Caused by Mean Stress in Tube & Superimposed Alternating Stress ML20207T8061987-02-20020 February 1987 Part 21 & Deficiency Rept Re Defect in Recirculation Spray Hxs.Initially Reported on 870218.Original HX Design Did Not Consider External Pressurization of Diaphragm Seal Plate W/O Presence of Internal Pressure as Balance.Mods Scheduled ML20211E1661987-01-28028 January 1987 Part 21 & Deficiency Rept Re Rockwell Engineering Co Steel Columns W/Laminations in Web.Initially Reported on 861112. Ultrasonic Testing of Suspect Matls Completed.Action Plan to Replace 13 Defective Columns Summarized ML20214H7521986-11-12012 November 1986 Part 21 Rept Re Potential Defect in New Svc Water Spray Array Support Sys Mfg by Inland Steel Co.Initially Reported on 861107.Positive Identification & Ultrasonic Testing of Suspect Matls Will Be Completed by 861201 ML20214F9771986-11-0707 November 1986 Part 21 Rept Re New Svc Water Spray Array Sys Supports Supplied by Inland Steel Co.Util Will Provide Positive Identification & Ultrasonic Testing Results of Suspect Matl. Identification Process Will Be Complete by 861201 ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20197J6371986-05-12012 May 1986 Part 21 Rept Re Possibility of Power Supply hang-up When Energizing Slv Relays.Changes Made in Power Supply Circuitry.Slv Relays,W/Mods Incorporated in Latest Designs, Extensively Tested W/O Power Supply Failures ML20137X3891986-02-27027 February 1986 Part 21 Rept Re Possible Defect in Model KMG-HRH Noble Gas Radiation Monitor W/Enhanced Detector Model KDGM-HR. Initially Reported on 860222.Vendor Will Request Utils for Listed Plants to Determine If Monitors Defective ML20137S4441985-11-26026 November 1985 Part 21 Rept Re Unparallel Fitup of Nut to Mating Surface of Connecting Rod Cap & Nonperpendicular Faces of Nuts to Thread Pitch Line.Nuts & Bolts in Assembled Calvert Cliffs Onsite Spare Engine Will Be Replaced ML20133B2511985-09-16016 September 1985 Part 21 Rept Re Defective Electronically Coded Vinyl Key Cards,Pyrotronics Model 1310,used for Security Electronic Access Control Sys.Initially Reported on 850913.Five Defective Cards Destroyed.New Cards Will Be Tested ML20126C6901985-06-0505 June 1985 Part 21 Rept Re Generator Failure.Concurs W/Encl Louis Allis That Interpolar Connectors Be Removed ML20127N0621985-05-13013 May 1985 Part 21 Rept Re Incorrect Short Time Delay Band Lever Inadequately Installed in Low Voltage K-line Circuit Breaker Electromechanical Overcurrent Trip Device.Visual Insp to Determine If Correct Lever Installed Recommended RBG-18701, Attachment of Final Deficiency Rept DR-138 Re ITE-Gould Type 2150 Overload Relays Out of Calibr.Relays Sent Back & Replaced w/L10 Overload Relays.Response to Request for Addl Info Re Surry & North Anna SPDS Encl1984-08-20020 August 1984 Attachment of Final Deficiency Rept DR-138 Re ITE-Gould Type 2150 Overload Relays Out of Calibr.Relays Sent Back & Replaced w/L10 Overload Relays.Response to Request for Addl Info Re Surry & North Anna SPDS Encl ML20094D9061984-07-19019 July 1984 Interim Deficiency Rept,Item 176 Re Kerite Co Single Conductor Power Cables Damaged,But Undetected by Insp & Testing.Initially Reported on 840619.Final Rept by 841215 ML20092D9711984-06-15015 June 1984 Part 21 Rept Re Thermal Nonrepeatability & Other Calibr Errors in Barton Lot 1 Transmitters.Initially Reported on 840615.Transmitter Defects Identified & Expected Error Deviations Calculated.Utils Notified ML20088A6231984-03-28028 March 1984 Part 21 Rept Re Abnormal Wear on Linear Converter Units Mfg & Furnished to Power Generating Facilities.Caused by Actuator Hunting.All Customers Provided Field Lubrication Procedure ML20081C5111984-03-0909 March 1984 Part 21 Rept Re Status Update Concerning Abnormal Wear on Linear Converters.Test Program Underway.Results of Investigation Indicate Excessive Wear Caused by Hunting of Control Circuitry ML20086N0421984-01-0202 January 1984 Final Part 21 Rept Re Potential Problem Concerning Radiography of Branch Connection Welds Covered by Reinforcing Pads.Welds at Byron,Braidwood & North Anna Acceptable.Weld 7 at Clinton Reradiographed PLA-1902, Interim Deficiency Rept Re Isolation of Nitrogen Makeup Sys. Also Reportable Per Part 21.Initially Reported on 830912. Permanent Design Mod Will Be Implemented.Final Rept Will Be Submitted in Dec 19831983-10-10010 October 1983 Interim Deficiency Rept Re Isolation of Nitrogen Makeup Sys. Also Reportable Per Part 21.Initially Reported on 830912. Permanent Design Mod Will Be Implemented.Final Rept Will Be Submitted in Dec 1983 ML20086N2381983-10-0404 October 1983 Supplemental Part 21 Rept Re Radiographic Record Evaluation, Supplying Addl Data to 830624 Submittal.Records Show That 90 Degree Branch Connections Furnished to North Anna 1 & 2 Jobsites.No Nozzles Supplied to Zimmer.Related Info Encl PLA-1872, Second Interim Deficiency Rept Re GE Reactor Mode Switch. Initially Reported on 830407.Mode Switch Redesigned.Sample Will Be Independently Tested.Also Reported Per Part 21.Final Rept Will Be Submitted by Dec 19831983-09-30030 September 1983 Second Interim Deficiency Rept Re GE Reactor Mode Switch. Initially Reported on 830407.Mode Switch Redesigned.Sample Will Be Independently Tested.Also Reported Per Part 21.Final Rept Will Be Submitted by Dec 1983 ML20023E0541983-05-27027 May 1983 Deficiency Rept Re Narrow Range Resistance Temp Detectors Installed to Meet License Condition Failing to Operate.Cause Under Investigation.Detectors Replaced.Testing Modified Until Design Revised.Also Reportable Per Part 21 ML20023C5101983-05-0606 May 1983 Final Deficiency Rept Re Nonconforming Class IE Radiation Monitoring Sys Electronic Modules Mfg by Victoreen,Inc Due to Breakdown of QA Program.Initially Reported on 820917. Vendor Revised QA Program Reviewed & Approved ML20050A8921982-03-12012 March 1982 Interim Part 21 Rept Re 1/2-inch & 3/8-inch Plates Used in Category 1 Seismic Supports,Initially Reported 820310. Supports Containing 3/8-inch Plates Examined & hands-on Search of 1/2-inch Matl Conducted.Reportable Per Part 21 ML20039C1441981-12-18018 December 1981 Final Deficiency Rept Re Failure of RHR Sys LPCI Injection Valve 1F017-B,initially Reported 811120.Locking Mechanism Devised to Attach anti-rotation Pin to Stem Collar.Also Reported Per Part 21 ML20038B5141981-11-12012 November 1981 Part 21 Rept Re Protection Sys Interaction Deficiency Caused by Control Circuitry Design for Vol Control Tank Level Instrumentation.Recommendation Re Westinghouse Proposed Action Requested ML20011A7131981-10-19019 October 1981 Final Deficiency Rept Re Inlet Piping Configurations for Pressurizer Safety Relief Valves W/Large Pressure Drops Possibly Leading to Valve Chatter,Initially Reported 810916. Inlet Piping Design Will Be Revised to Limit Pressure Loss ML20031B3921981-09-22022 September 1981 Final Deficiency Rept Re Casting Defect in Shaft Bearing Housing for Auxiliary Feed Pump Motor 3AF-P2A,initially Reported 790920.Pump Motors 3AF-P2B,4AF-P2A & 4AF-P2B Also Determined to Be Defective.Vendor Has Repaired All Defects ML20010G6761981-09-0909 September 1981 Final Deficiency Rept Re Available NPSH for Recirculation Spray Pumps,Originally Reported on 770812.Recirculation Spray Pump Arrangement Has Been Modified to Set Pumps Lower in Elevation.Assumptions Used Are Conservative ML20010F7911981-08-27027 August 1981 Part 21 Rept Re Effects of Spurious Opening of Turbine Bypass Sys Valves on Nuclear Supply Sys.Potential Single Active Failure Could Result in Possibility of Exceeding DNBR Limits ML20030D4571981-08-21021 August 1981 Final Deficiency Rept Re Nonconservative Calculation of Seismic Loads on NSSS Equipment & Supports,Initially Reported on 810724.B&W Will Use NSSS half-loop & Symmetrical half-wall Representation on Loop Mathematical Model 1997-09-30 Category:TEXT-SAFETY REPORT MONTHYEAR05000339/LER-1999-002-03, :on 990922,containment Liner Through Wall Defect Was Noted.Caused by Corrosion.Pressure Test Was Performed.With1999-10-21021 October 1999
[Table view]
ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section 1999-09-08 |
Text
.-
2 VIROINIA ELECTRIC ann POWER COMPANY f
V Ricnxoxu,V HGINIA 20261 f
W.L.STEWABIT k
f Vses Pmessoswr Nect.mAm oramartown i
May 27, 1983
?
g,p Mr. Harold R. Denton, Director Serial No. 257A j
y Office of Nuclear Reactor Regulation N0/SBE/JHL:acm l
Attn:
Mr. Robert A. Clark, Chief Docket No. 50-339 Operating Reactors Branch No. 3 License No. NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 2 STATUS OF LICENSE CONDITION 2.C(4)(c)
In our letter dated May 6, 1983 (Serial No. 257), we reported the status of North Anna Unit 2 License Condition 2.C(4)(c) which requires the replacement of the wide and narrow range resistance temperature detectors (RTD's) in the reactor coolant system with qualified RTD's.
In the letter, it was stated that qualified RTD's had been obtained and installed in 23 of 24 locations in the reactor coolant system.
The last RTD (TE-2430) could not be replaced at the time due to an obstruction.
These qualified RTD's are Weed Instrument Company narrow range (200 ohm platinum single element) Model No. N9000-2B-240
/ 9 and vide range (200 ohm platinum dual element) with sensor element
~
SP612D-2B-C-6-F-13.5-0-0.
This letter is to inform yoa that the narrow range RTD's that were installed to meet this license condition have failed to operate properly.
The failures were identified during bench testing or after installation while operating at a temperature between 195*F and 350*F.
The failure mechanisms are still under investigation. The wide range RTD's are of a different design and experienced no such failures after installation.
Due to these failures, all of the narrow range RTD's (18 total) have been replaced.
Vepco has located and installed 18 Rosemount RTD's (Model 176KF)
,)
that have not been used.
These units have been installed and tested by the J
approved calibration and post installation testing procedures.
In addition, until the replaced RTD's can be repaired or redesigned to ensure the needed reliability is obtained or another qualified RTD can be obtained, the installed Rosemount RTD's will be tested by the Arrhenius methodology and j
/
also by the Loop Current Step Response method each calendar quarter.
Vepco has assured that the cable connectors are adequately sealed.
Therefore, the interim License Condition is being met.
.\\
8306070148 830527 PDR ADOCK 05000339
\\0 E
=
VIROINIA Etzernic Awp Powra Courm To Harold R. Denton Vepco has determined that these failures could create a Substantial Safety Hazard in a Basic Component and this is reportable pursuant to 10 CFR Part 21.
The initial verbal notification of this event was made to Mr. C. Julian (NRC Region II) at 1356 on May 24, 1983.
A follow-up written report will follow within five days.
Very truly yours,
\\ h
\\
k W. L. Stewart cc:
Mr. James P. O'Reilly Regional Administrator Region II Mr. M. B. Shymlock NRC Resident Inspector North Anna Power Station