ML19211C768: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:..*#-January 4, 1980 BECo Ltr #80-2 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-048/01T Docket Number 50-293 License DPR-35 Gentlemen:
{{#Wiki_filter:.
                                            .
                                      *   -
#
January 4, 1980 BECo Ltr #80-2 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-048/01T               Docket Number 50-293 License DPR-35 Gentlemen:
The attached Licensee Event Report 79-048/01T, Failure of the Switchyard 125 Volt DC Battery Charger, is hereby submitted in accordance with the re-quirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.
The attached Licensee Event Report 79-048/01T, Failure of the Switchyard 125 Volt DC Battery Charger, is hereby submitted in accordance with the re-quirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.
The Operations Review Committee has reviewed this event and classified it as operation in a degraded mode permitted by a Limiting Condition for Operation or requf ring shutdown (Specification 6.9.B.2.b) .
The Operations Review Committee has reviewed this event and classified it as operation in a degraded mode permitted by a Limiting Condition for Operation or requf ring shutdown (Specification 6.9.B.2.b) .
If there are any questions on this subject, please contact us.
If there are any questions on this subject, please contact us.
Respe tfully Submitted,/P.; . McGuire Stnion Manager Nuclear Operations ETG:ep  
Respe tfully Submitted,
                                                      /
P.; . McGuire Stnion Manager Nuclear Operations ETG:ep


==Enclosures:==
==Enclosures:==
(3 copies)
(3 copies)
LER 79-048/01T cc: Director (40 copies)
LER 79-048/01T cc: Director (40 copies)
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 1738 046 8001140}}
20555 1738 046 8001140}}

Revision as of 13:02, 19 October 2019

Forwards LER 79-048/01T-0
ML19211C768
Person / Time
Site: Pilgrim
Issue date: 01/04/1980
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19211C769 List:
References
80-2, NUDOCS 8001140468
Download: ML19211C768 (1)


Text

.

.

  • -

January 4, 1980 BECo Ltr #80-2 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-048/01T Docket Number 50-293 License DPR-35 Gentlemen:

The attached Licensee Event Report 79-048/01T, Failure of the Switchyard 125 Volt DC Battery Charger, is hereby submitted in accordance with the re-quirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.

The Operations Review Committee has reviewed this event and classified it as operation in a degraded mode permitted by a Limiting Condition for Operation or requf ring shutdown (Specification 6.9.B.2.b) .

If there are any questions on this subject, please contact us.

Respe tfully Submitted,

/

P.; . McGuire Stnion Manager Nuclear Operations ETG:ep

Enclosures:

(3 copies)

LER 79-048/01T cc: Director (40 copies)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 1738 046 8001140