ML20196H091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20196H091
| number = ML20196H091
| issue date = 07/06/1983
| issue date = 07/06/1983
| title = Responds to NRC 830609 Ltr Re Initial Preoperational Radiation Protection Insp Repts 50-445/83-16 & 50-446/83-10. Detailed Planned Actions to Suppl Present Radiation Protection Staff W/Experienced Personnel Encl
| title = Responds to NRC Re Initial Preoperational Radiation Protection Insp Repts 50-445/83-16 & 50-446/83-10. Detailed Planned Actions to Suppl Present Radiation Protection Staff W/Experienced Personnel Encl
| author name = Gary R
| author name = Gary R
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Line 12: Line 12:
| case reference number = FOIA-87-669
| case reference number = FOIA-87-669
| document report number = TXX-3999, NUDOCS 8803100076
| document report number = TXX-3999, NUDOCS 8803100076
| title reference date = 06-09-1983
| package number = ML20196H050
| package number = ML20196H050
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 27: Line 28:
==Dear Mr. Madsen:==
==Dear Mr. Madsen:==


We have reviewed your letter dated June 9,1983 on the initial preoperational radiation protection inspection conducted by Messrs.
We have reviewed your {{letter dated|date=June 9, 1983|text=letter dated June 9,1983}} on the initial preoperational radiation protection inspection conducted by Messrs.
H. D. Chaney and B. Murray of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2. As requested, we have detailed our planned actions to supplement the present radiation protection staff with personnel tnat have actual power plant experience.
H. D. Chaney and B. Murray of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2. As requested, we have detailed our planned actions to supplement the present radiation protection staff with personnel tnat have actual power plant experience.
Prior to unit one fuel load, TUGC0 will augment the present Radiation Protecion Staff with either permanent or contract personnel that meet the ANSI 18.1 criteria and have a minimum of
Prior to unit one fuel load, TUGC0 will augment the present Radiation Protecion Staff with either permanent or contract personnel that meet the ANSI 18.1 criteria and have a minimum of

Revision as of 04:33, 9 December 2021

Responds to NRC Re Initial Preoperational Radiation Protection Insp Repts 50-445/83-16 & 50-446/83-10. Detailed Planned Actions to Suppl Present Radiation Protection Staff W/Experienced Personnel Encl
ML20196H091
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/06/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20196H050 List:
References
FOIA-87-669 TXX-3999, NUDOCS 8803100076
Download: ML20196H091 (2)


Text

.

h TENAS UTILITIES GENERATING COMPANY

.,.. mnss nnse,.i,su - 1, w v.o. .o.

tstt ts ts *

..; ra . . .a..s.u.

July 6,1983 TXX-3999 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION INSPECTION REPORT N0.83-16/10 FILE NO.: 10130

Dear Mr. Madsen:

We have reviewed your letter dated June 9,1983 on the initial preoperational radiation protection inspection conducted by Messrs.

H. D. Chaney and B. Murray of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2. As requested, we have detailed our planned actions to supplement the present radiation protection staff with personnel tnat have actual power plant experience.

Prior to unit one fuel load, TUGC0 will augment the present Radiation Protecion Staff with either permanent or contract personnel that meet the ANSI 18.1 criteria and have a minimum of

, two years of operating experience at commercial nuclear power

facilities.

l If contract technicians are used, the duration of their assignments will be based upon completion of all power escalation activities and tests or six months onsite. As a minimum, a qualified individual will be onsite, twenty-four hours of the day, seven days a week.

Very truly yours, l

8g 31 g 6 880307 WILLIAM 87-669 PDR , .

En 1 urt.s l cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555

~ *

-bec: R. J. Gary (2)

8. R. Clements D. N. Chapman R. L. Ramsey J. C. Kuykendall R. A. Jones J. T. Merritt D. Frankum H. C. Schmidt B. S. Dacko R. G. Tolson R. G. Taylor D. L. Kelley F. B. Shants J. B. George M. R. McBay Teri Smart R. E. Kahler N. S. Reynolds (D&L) p

.---,---..~,-~-u --- - --+