| January 7, 1977 P | | January 7, 1977 P |
| *
| |
| ~ ~~i~N gg f Office of Management Information ~ Qe4~~>> hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen: | | ~ ~~i~N gg f Office of Management Information ~ Qe4~~>> hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen: |
| Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1. | | Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1. |
Line 88: |
Line 86: |
| : Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) 4 ~ o | | : Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) 4 ~ o |
|
| |
|
| 0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL | | 0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50 251 |
| '
| |
| 50 251 | |
| ~ | | ~ |
| g DOCKET NO. | | g DOCKET NO. |
|
---|
Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC fOBNI 195 U.S.,NVCLLAB I'ICGULATOBYCOMMISSION" OOCKETNU
'I
~I (2-7G) 50-25( 251 FILE NUMBER 35 NRC DISTR l8UTION Fon RT 60 DOC I(ET IE/IATERlAL MONTHLY REPORT TO: USNRC FROM: BLORDIA PWR 6 LIGHT CO. OATE OF OOCUMFNT MIAMI, FLORDIA 1/7/77 A.D. SCHMIDT OATL RECFIVEO 1/.g/77 QLETTER CINOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVED DOR IGINAL B UNC LASS IF I E 0 OCOPV DESCRIPTION LETTER TRANS THE FOLLOWING: MO)THLY REPORT EOR DECFIIBER 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT TURKEY PT ~ // 1 3 6 4
'ACKNOWLEDGED NAME ~
OKOT gggoy@
FOR ACTION/INFORMATION MIPC W CYS I'OR ACT ON INTERNAL D ISTRI BUTION MC PDR
'CDOMI D BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTIOIV CONTROL NUiVlBER I I IAMI I'I..
NRC FORM 195 (2 7GI
P. O. IfOX 013100. MIAMI, FL 33101
/y
~lp ~
J ~
FLORIDA POWEH St LIGHT COMPANY C ~
IK ~ I g
~ ~
I -
~
January 7, 1977 P
~ ~~i~N gg f Office of Management Information ~ Qe4~~>> hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE . ~ . SERVING PCOf'LC
a r.,
u 1k II '
Jj
~1 g ~,
I
~ '
APPENDS B AVERAGE DAILY UNIT POWER LEVEL
'I
~
I
~
DOCKET NO. 50 250
-UNIT Turkey Point Unit No.
DATE Jan. 6 1977 COMPLETED BY V. T. Chi son TELEPHONE (305) 552-3830 MONTH December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NHe-Net) (MWe-Net) 17 18 3 19 20 21 22 23 25 10 26 27 12 28 13 29 14 30 15 31 16
APPENDIX C OPERATING DATA REPO~
DOCKET NO, 50 250 UNIT Turkey Point Unit No. 3 REPORT MONTH December 1976 DATE Jan. 6, 1977 e
C'OMPLETED BY V. T. Chilson TELEPHONE OPERATING STATUS 1, REPORTING PERIOD: 0001 76 12 01 GROSS HOURS 'IN REPORTING PERIOD: 744.0 THROUGH 4
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200.
Mlcl.DNPNDD. DAPADPPP (MNe-Nee): ~66 DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED (IP ANY) (MWe-iVet): NONE 46 REASONS POR RESTRZCTIOAV (IF ANY):.
THIS MONTH YEAR TO DATE CUMULATIVE 56 NiDiBERS OF HOURS REACTOR WAS CRITICAL..... 0 0 6 760.0 28 040.1
- 6. REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ .~. ~ .. 0 0 64.2 67.4 7~ HOURS GENERATOR OVA LINE. ~ .............. ~ .. 0.0 6 669.1 27 039.1 80 UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0.0 0.0 85.0
- 9. GROSS THERMAL ENERGY GLVERATED (MiiH)...... 14 417 328 51 729 588
- 10. GROSS ELECTRICAL ENERGY GLVERATED (i%H)... 0 4 555 215 16 570 451
- 11. NET ELECTRICAL ENERGY GENERATED (MiiH)..... - 1 706 4 320 173 15 675 935
- 12. REACTOR SERVICE FACTOR. 0.0 77.0 78.5
- 13. REACTOR AVAILABILITYFACTOR ,, ~ ...,,....., 0.0 77.7 78.7
- 14. UiNIT SERVICE FACTOR 0.0
- 15. UNIT AVAILABILITYFACTOR. ~ ~ ~ eee ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~ 75.9 75.9
- 16. iLVIT CAPACITY PACZOR (Using (MDC).....:... 73.8 66.8
- 17. UNIT CAPACITY FAC10R (Using Design MWe)... 0 0 71.0 63.3
- 18. UNIT FORCED OUTAGE RATEe. ~ . ~ .......... ... ~ 0 0 0.1 2.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATED AVA DDURATION OF EACH)
- 20. ZP SHUTDOWN AT END OP REPORT PERIOD, ESTLM(ATED DATE OP STAR UP: Jan 16 1977
- 21. UNITS IiV TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY ZNITIAL ELECTRICITY COMMERCIAL OPERATION
(1) REASON APPENDIX D DOCKET NO. 50 - 250 h: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST UHIT SBUTD(MNS AND POHER REDUCTIONS UNIT NAME Turkey Point Unit No. 3 C REFUELING D: RECULATORY RESTRICTION DATE Jan. 6, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION COMPLETED BY V. T. Chilson P: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) TELEPHONE (305) 552-3B30 REPORT MONTH December 1976 H: OTHER (EXPLAIN)
(2) METHOD 1: MANUAL METHOD OP 2: MANUAL SCRAM TYPE SllUTTIHG Dpi 3: AUTOMATIC SCRAM P: FORCED DURATION THE REACTOR OR 4: OlliER (EX%LAIN) NO. DATE S SCHEDULED (BOURS) REASON(1) REDUCING PONER(2) CORRECTIVE ACTIONS/CO:IHENTS 21 76-11-14 744.0 Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) . (Nuclear and Non-nuclear systems)
~,
SUMMARY
- Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) 4 ~ o
0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50 251
~
g DOCKET NO.
I
.UNIT Turkey. Point Unit No. 4
- ~ DATE Jan. 6, 1977 COMPLETED BY >- T. Chilson TELEPHONE (305) 552-3830 MONTH December, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mle-Net) (Mfe-Ne t) 17 690 18 697 3 17 19 689 521 20 605
'83 21 683 6 689 22 692 687 692 661 693 664 25 695 10 69.6 26 '92 690 27 691 12 689 28 693 684 29 689 680. -30 688 14'5 687 690 16 687 NOTE: Average daily power level greater than 666 Wih due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT~
DOCKET Np. 50 - 250 UNIT Turke Point Unit No.
~ i REPORT MONTH December, 1976 Jan.
~
~
DATE 6 1977
'OUPLE ED BY V. T. Chilson OPERATING STATUS 1~ REPORTING PERIOD'001 > 76> 12 i pl GROSS HOURS IN REPORTING 744.p 2400,76,12~31 PERIOD'HRpUGH
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX.DEPEHO ~ CAPACITY ON -N i):
DESIGN ELECTRICAL RATING (MWe"Net): 693
- 3. POWER LEVEL Tp WHICH RESTRICTED (IP ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IP AVl):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBERS OF HOURS REACTOR WAS CRITICAL.... ~ 6 075.9 21 721.8
- 6. REACTOR RESERVE SHUTDOWN HOURS............ . 21.7 21.7 138 ~ 8 le HOURS GENERATOR ON LINE. ~ ~ ~ 670il 5 828.4 20 542.0
- 8. UNIT RESERVE SHUTDOWN HOURS..... ~ ......... 0.0 0.0 0.0
- 9. GROSS THERMAL ENERGY GENERATED (MWH)....., 1 453 037 ll 103 004 41 751 640
- 10. GROSS ELECTRICAL ENERGY OK&RATED (MWH)... 479 100 3 978 606 13 957 688
- 11. NET ELECTRICAL EJERGY GENERATED (AH)..... 455 502 3 771 836 13 230 466
- 12. REACTOR SERVICE FACTOR. 96.5 69.2 73 '
- 13. REACTOR AVAILABILITYFACTOR............... 99 ' 69.5 74.2
- 14. UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ to ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 66. 4 69.8
- 15. UNIT AVAILABILITYFACTOR.................. 90.1 66.4 69.8
- 16. UNIT CAPACITY FACTOR (Using (MDC)... ~ ~ ~ ... 91 ' 64.5 68.2
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 88 3 62.0 64.8
- 18. UNIT FORCED OUTAGE RATE...........'........ - 0 5 . 3.7 3.6
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Repair steam generator tube leak - Jan. 6, 1977 through Jan. 12, 1977.
Refueling, maintenance, and inspections - April 4, 1977 through May 22, 1977.
- 20. IF SHUTDOWiN AT END OF REPORT PERIOD, ESTLQTED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR Tp COMMERCIAL OPERATION): PORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
1 REASON APPENDIX D DOCKET NO. 50 - 251 A: EQUIPMENT FAILURE (EXPIAIN)
B: MAINT. OR TEST UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAHE Turke Point Unit No. 4 C: REFUELING D: REGULATORY RESTRICTION DATE Jan. 6 1977 E OPERATOR TRAINING AND LICENSE EXAHINATION COMPLETED BY V. T. Chilson F ADlIINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTII December 1976 TELEPHONE (305) 552-3830 H: OTHER (EXPLAIN)
(2) METHOD 1: MAIiVAL METHOD OF 2: .MANUAL SCRAH TYPE SHUTTLNG DOWN 3: AUTOHATIC SCRAM F: FORCF3) DURATION THE REACTOR OR OTIIER (EXPLAIN) NO. S SCHEDULED (BOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/CRDIENTS 28 76-10-28 69.4 Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month) (Nuclear system) 29 76-12-04 3.2 Unit No. 4 tripped on steam generator No. 4 A high level during a transient condition caused by the loss of a vital instrument bus Fewer supply. (Nuclear system) 30 76-12-20 1.3 Unit No. 4 tripped during a transient condition cause by the failure of a component in nuclear instrumen-tation system channel N-41. (Nuclear system)
SUMMARY
- Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit operated at 100X R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL I
I r5 ~
C DOCKET NO. 50 335
'.UNIT St. Luce.e Unzt No. 1 I
DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWrR LEVEL (MWe-Net) (MWe-Net) 18 3 19 20 21 370 22 377 23 376 24 374 25 380 10 26 374 27 371 12 28 378 13 '9 376 14 30 373 15 31 374 16
APPENDIX C OPERATING DATA REPORT DOCXET NO. 50 - 335 UNIT St ~ Lucio Unit No. 1 REPORT MONTH December, 1976 J'ATE Jan. 6, 1977 COMPLETED BY V. T. Chilson
\~
OPERATING STATUS TELEPHONE (305) 552-3830
- 1. REPORTING PERIOD: 0001.76912,21 GROSS HOURS IN REPORTING PERIOD: 264.0 THROUGH 24
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 MAl(.DEPEND. CAPACITY (MWe"Net): ~ 802 Estimated)
DESIGN ELECTRZCAL RATING (MWe-Net): 802
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722
- 4. REASONS FOR RESTRICTION (IF AWa ):
"Temporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5~ NUAABERS OF HOURS REACTOR WAS CRITICAL ~ ~ ~ ~ 264.0 264.0
- 6. REAUTOR RESERVE SRUTDODE EOIIIIS............ 0.0
- 7. IIOURS OESEIIATOR OE LTSE.......,.... 264.0
- 8. UNIT RESERVE SHUTDOWN HOURS............... ' 0 0.0 0.0
- 9. GROSS THEPRlAL BARGY GE'.STERATED (MWH) ~ ~ .. ~ . ~ 347 603 347 603 347 603
- 10. GROSS ELECTRZCAL FNERGY GERKRATED (MWH)... 108 270 108 270 108 270
- 11. NET ELECTRICAL ENERGY GE:IERATED (Ã%) ~ ~ ~ ~ ~ 98 975 98 975 98 975
- 12. REACTOR SERVICE FACTOR 100.0 100.0 100.0
- 13. REACTOR AVAILABILITYFACTOR.............:. 100.0 100.0 100.0
- 14. UNZT SERVICE FACTOR............,....,...,. 100.0 100.0 100.0
- 15. 'UNIT AVAILABILITYFACTOR..............,... 100.0 100.0 100.0 16 UNIT CAPACITY FACTOR (Using (MDC) . ~ ~ ~ . ~ ., 46.7 46.7 46.7
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 46 7 46.7 46.7
\
- 18. UNIT FORCED OUTAGE RATE................... 0.0 0.0 0.0
- 19. SHUTDOWANS SCHEDULED OVER NEXT 6 MO~iS (TYPE, DATE> AND DURATION OF EACH):
- 20. IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 49221 22, 1976 INITIAL ELECTRICITY ~EA 7 1976 CORAAERCIAL OPERATION D . 21 1976 4
APPEtlDIX D DOCKET NO. I (1) REASON A: EQUIPMENT FAILURE (EXPLAIN) UNIT St. Lucie Unit o.
UNIT SHUTDOWNS AND POWER REDUCTIONS NAME 1 B: MAINT. OR TEST C: REFUELING DATE Jan. 6, 1977 D: REGULATORY RESTRICTION E: OPERATOR TRAINING AIID CO'IPI ETED BY V T Chilson LICENSE EXAMINATION F: ADttI H ISTRATIVE TELEPHONE (305) 552-3830.
G: OPERATIOtlAL ERROR (EXPLAIN) REPORT MONTH December 1976 H: OTHER (FJ(PLAIN)
(2) tIETHOD 1: MANUAL METHOD OF 2: .MANUAI SCRAM TYPE SHUTTING DOWN 3: AUTOMATIC SCRAM F! FORCED DURATION THE REACTOR OR OTHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtDIENTS NONE
SUMMARY
- Unit No. 1 vas placed in commercial operation on December 21, 1976, at 12:01 a.m. Unit operated at approximately 50X R.P. through end of month.