Line 35: Line 35:
I          -
I          -
                       ~
                       ~
                                                  .
January 7, 1977 P
January 7, 1977 P
                                          *
                                             ~ ~~i~N gg f Office of          Management Information ~  Qe4~~>>              hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.                20555 Gentlemen:
                                             ~ ~~i~N gg f Office of          Management Information ~  Qe4~~>>              hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.                20555 Gentlemen:
Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.
Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.
Line 88: Line 86:
:  Unit  No. 3 removed from service for refueling, maintenance,    and inspections.    (Continued from previous month) 4 ~  o
:  Unit  No. 3 removed from service for refueling, maintenance,    and inspections.    (Continued from previous month) 4 ~  o


0          APPENDIX B AVERAGE DAILY UNIT POWER LEVEL
0          APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50  251
                                                                        '
50  251
               ~
               ~
g DOCKET NO.
g DOCKET NO.

Latest revision as of 18:41, 2 February 2020

Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A408
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/07/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A408 (15)


Text

NRC fOBNI 195 U.S.,NVCLLAB I'ICGULATOBYCOMMISSION" OOCKETNU

'I

~I (2-7G) 50-25( 251 FILE NUMBER 35 NRC DISTR l8UTION Fon RT 60 DOC I(ET IE/IATERlAL MONTHLY REPORT TO: USNRC FROM: BLORDIA PWR 6 LIGHT CO. OATE OF OOCUMFNT MIAMI, FLORDIA 1/7/77 A.D. SCHMIDT OATL RECFIVEO 1/.g/77 QLETTER CINOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVED DOR IGINAL B UNC LASS IF I E 0 OCOPV DESCRIPTION LETTER TRANS THE FOLLOWING: MO)THLY REPORT EOR DECFIIBER 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT TURKEY PT ~ // 1 3 6 4

'ACKNOWLEDGED NAME ~

OKOT gggoy@

FOR ACTION/INFORMATION MIPC W CYS I'OR ACT ON INTERNAL D ISTRI BUTION MC PDR

'CDOMI D BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTIOIV CONTROL NUiVlBER I I IAMI I'I..

NRC FORM 195 (2 7GI

P. O. IfOX 013100. MIAMI, FL 33101

/y

~lp ~

J ~

FLORIDA POWEH St LIGHT COMPANY C ~

IK ~ I g

~ ~

I -

~

January 7, 1977 P

~ ~~i~N gg f Office of Management Information ~ Qe4~~>> hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE . ~ . SERVING PCOf'LC

a r.,

u 1k II '

Jj

~1 g ~,

I

~ '

APPENDS B AVERAGE DAILY UNIT POWER LEVEL

'I

~

I

~

DOCKET NO. 50 250

-UNIT Turkey Point Unit No.

DATE Jan. 6 1977 COMPLETED BY V. T. Chi son TELEPHONE (305) 552-3830 MONTH December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NHe-Net) (MWe-Net) 17 18 3 19 20 21 22 23 25 10 26 27 12 28 13 29 14 30 15 31 16

APPENDIX C OPERATING DATA REPO~

DOCKET NO, 50 250 UNIT Turkey Point Unit No. 3 REPORT MONTH December 1976 DATE Jan. 6, 1977 e

C'OMPLETED BY V. T. Chilson TELEPHONE OPERATING STATUS 1, REPORTING PERIOD: 0001 76 12 01 GROSS HOURS 'IN REPORTING PERIOD: 744.0 THROUGH 4

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200.

Mlcl.DNPNDD. DAPADPPP (MNe-Nee): ~66 DESIGN ELECTRICAL RATING (MWe-Net): 693

3. POWER LEVEL TO WHICH RESTRICTED (IP ANY) (MWe-iVet): NONE 46 REASONS POR RESTRZCTIOAV (IF ANY):.

THIS MONTH YEAR TO DATE CUMULATIVE 56 NiDiBERS OF HOURS REACTOR WAS CRITICAL..... 0 0 6 760.0 28 040.1

6. REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ .~. ~ .. 0 0 64.2 67.4 7~ HOURS GENERATOR OVA LINE. ~ .............. ~ .. 0.0 6 669.1 27 039.1 80 UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0.0 0.0 85.0
9. GROSS THERMAL ENERGY GLVERATED (MiiH)...... 14 417 328 51 729 588
10. GROSS ELECTRICAL ENERGY GLVERATED (i%H)... 0 4 555 215 16 570 451
11. NET ELECTRICAL ENERGY GENERATED (MiiH)..... - 1 706 4 320 173 15 675 935
12. REACTOR SERVICE FACTOR. 0.0 77.0 78.5
13. REACTOR AVAILABILITYFACTOR ,, ~ ...,,....., 0.0 77.7 78.7
14. UiNIT SERVICE FACTOR 0.0
15. UNIT AVAILABILITYFACTOR. ~ ~ ~ eee ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~ 75.9 75.9
16. iLVIT CAPACITY PACZOR (Using (MDC).....:... 73.8 66.8
17. UNIT CAPACITY FAC10R (Using Design MWe)... 0 0 71.0 63.3
18. UNIT FORCED OUTAGE RATEe. ~ . ~ .......... ... ~ 0 0 0.1 2.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATED AVA DDURATION OF EACH)
20. ZP SHUTDOWN AT END OP REPORT PERIOD, ESTLM(ATED DATE OP STAR UP: Jan 16 1977
21. UNITS IiV TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY ZNITIAL ELECTRICITY COMMERCIAL OPERATION

(1) REASON APPENDIX D DOCKET NO. 50 - 250 h: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST UHIT SBUTD(MNS AND POHER REDUCTIONS UNIT NAME Turkey Point Unit No. 3 C REFUELING D: RECULATORY RESTRICTION DATE Jan. 6, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION COMPLETED BY V. T. Chilson P: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) TELEPHONE (305) 552-3B30 REPORT MONTH December 1976 H: OTHER (EXPLAIN)

(2) METHOD 1: MANUAL METHOD OP 2: MANUAL SCRAM TYPE SllUTTIHG Dpi 3: AUTOMATIC SCRAM P: FORCED DURATION THE REACTOR OR 4: OlliER (EX%LAIN) NO. DATE S SCHEDULED (BOURS) REASON(1) REDUCING PONER(2) CORRECTIVE ACTIONS/CO:IHENTS 21 76-11-14 744.0 Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) . (Nuclear and Non-nuclear systems)

~,

SUMMARY

Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) 4 ~ o

0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50 251

~

g DOCKET NO.

I

.UNIT Turkey. Point Unit No. 4

- ~ DATE Jan. 6, 1977 COMPLETED BY >- T. Chilson TELEPHONE (305) 552-3830 MONTH December, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mle-Net) (Mfe-Ne t) 17 690 18 697 3 17 19 689 521 20 605

'83 21 683 6 689 22 692 687 692 661 693 664 25 695 10 69.6 26 '92 690 27 691 12 689 28 693 684 29 689 680. -30 688 14'5 687 690 16 687 NOTE: Average daily power level greater than 666 Wih due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT~

DOCKET Np. 50 - 250 UNIT Turke Point Unit No.

~ i REPORT MONTH December, 1976 Jan.

~

~

DATE 6 1977

'OUPLE ED BY V. T. Chilson OPERATING STATUS 1~ REPORTING PERIOD'001 > 76> 12 i pl GROSS HOURS IN REPORTING 744.p 2400,76,12~31 PERIOD'HRpUGH

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):

MAX.DEPEHO ~ CAPACITY ON -N i):

DESIGN ELECTRICAL RATING (MWe"Net): 693

3. POWER LEVEL Tp WHICH RESTRICTED (IP ANY) (MWe-Net): NONE
4. REASONS FOR RESTRICTION (IP AVl):

THIS MONTH YEAR TO DATE CUMULATIVE

5. NUMBERS OF HOURS REACTOR WAS CRITICAL.... ~ 6 075.9 21 721.8
6. REACTOR RESERVE SHUTDOWN HOURS............ . 21.7 21.7 138 ~ 8 le HOURS GENERATOR ON LINE. ~ ~ ~ 670il 5 828.4 20 542.0
8. UNIT RESERVE SHUTDOWN HOURS..... ~ ......... 0.0 0.0 0.0
9. GROSS THERMAL ENERGY GENERATED (MWH)....., 1 453 037 ll 103 004 41 751 640
10. GROSS ELECTRICAL ENERGY OK&RATED (MWH)... 479 100 3 978 606 13 957 688
11. NET ELECTRICAL EJERGY GENERATED (AH)..... 455 502 3 771 836 13 230 466
12. REACTOR SERVICE FACTOR. 96.5 69.2 73 '
13. REACTOR AVAILABILITYFACTOR............... 99 ' 69.5 74.2
14. UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ to ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 66. 4 69.8
15. UNIT AVAILABILITYFACTOR.................. 90.1 66.4 69.8
16. UNIT CAPACITY FACTOR (Using (MDC)... ~ ~ ~ ... 91 ' 64.5 68.2
17. UNIT CAPACITY FACTOR (Using Design MWe)... 88 3 62.0 64.8
18. UNIT FORCED OUTAGE RATE...........'........ - 0 5 . 3.7 3.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Repair steam generator tube leak - Jan. 6, 1977 through Jan. 12, 1977.

Refueling, maintenance, and inspections - April 4, 1977 through May 22, 1977.

20. IF SHUTDOWiN AT END OF REPORT PERIOD, ESTLQTED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR Tp COMMERCIAL OPERATION): PORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1 REASON APPENDIX D DOCKET NO. 50 - 251 A: EQUIPMENT FAILURE (EXPIAIN)

B: MAINT. OR TEST UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAHE Turke Point Unit No. 4 C: REFUELING D: REGULATORY RESTRICTION DATE Jan. 6 1977 E OPERATOR TRAINING AND LICENSE EXAHINATION COMPLETED BY V. T. Chilson F ADlIINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTII December 1976 TELEPHONE (305) 552-3830 H: OTHER (EXPLAIN)

(2) METHOD 1: MAIiVAL METHOD OF 2: .MANUAL SCRAH TYPE SHUTTLNG DOWN 3: AUTOHATIC SCRAM F: FORCF3) DURATION THE REACTOR OR OTIIER (EXPLAIN) NO. S SCHEDULED (BOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/CRDIENTS 28 76-10-28 69.4 Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month) (Nuclear system) 29 76-12-04 3.2 Unit No. 4 tripped on steam generator No. 4 A high level during a transient condition caused by the loss of a vital instrument bus Fewer supply. (Nuclear system) 30 76-12-20 1.3 Unit No. 4 tripped during a transient condition cause by the failure of a component in nuclear instrumen-tation system channel N-41. (Nuclear system)

SUMMARY

Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.

Unit operated at 100X R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL I

I r5 ~

C DOCKET NO. 50 335

'.UNIT St. Luce.e Unzt No. 1 I

DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWrR LEVEL (MWe-Net) (MWe-Net) 18 3 19 20 21 370 22 377 23 376 24 374 25 380 10 26 374 27 371 12 28 378 13 '9 376 14 30 373 15 31 374 16

APPENDIX C OPERATING DATA REPORT DOCXET NO. 50 - 335 UNIT St ~ Lucio Unit No. 1 REPORT MONTH December, 1976 J'ATE Jan. 6, 1977 COMPLETED BY V. T. Chilson

\~

OPERATING STATUS TELEPHONE (305) 552-3830

1. REPORTING PERIOD: 0001.76912,21 GROSS HOURS IN REPORTING PERIOD: 264.0 THROUGH 24
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 MAl(.DEPEND. CAPACITY (MWe"Net): ~ 802 Estimated)

DESIGN ELECTRZCAL RATING (MWe-Net): 802

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722
4. REASONS FOR RESTRICTION (IF AWa ):

"Temporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5~ NUAABERS OF HOURS REACTOR WAS CRITICAL ~ ~ ~ ~ 264.0 264.0

6. REAUTOR RESERVE SRUTDODE EOIIIIS............ 0.0
7. IIOURS OESEIIATOR OE LTSE.......,.... 264.0
8. UNIT RESERVE SHUTDOWN HOURS............... ' 0 0.0 0.0
9. GROSS THEPRlAL BARGY GE'.STERATED (MWH) ~ ~ .. ~ . ~ 347 603 347 603 347 603
10. GROSS ELECTRZCAL FNERGY GERKRATED (MWH)... 108 270 108 270 108 270
11. NET ELECTRICAL ENERGY GE:IERATED (Ã%) ~ ~ ~ ~ ~ 98 975 98 975 98 975
12. REACTOR SERVICE FACTOR 100.0 100.0 100.0
13. REACTOR AVAILABILITYFACTOR.............:. 100.0 100.0 100.0
14. UNZT SERVICE FACTOR............,....,...,. 100.0 100.0 100.0
15. 'UNIT AVAILABILITYFACTOR..............,... 100.0 100.0 100.0 16 UNIT CAPACITY FACTOR (Using (MDC) . ~ ~ ~ . ~ ., 46.7 46.7 46.7
17. UNIT CAPACITY FACTOR (Using Design MWe)... 46 7 46.7 46.7

\

18. UNIT FORCED OUTAGE RATE................... 0.0 0.0 0.0
19. SHUTDOWANS SCHEDULED OVER NEXT 6 MO~iS (TYPE, DATE> AND DURATION OF EACH):
20. IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 49221 22, 1976 INITIAL ELECTRICITY ~EA 7 1976 CORAAERCIAL OPERATION D . 21 1976 4

APPEtlDIX D DOCKET NO. I (1) REASON A: EQUIPMENT FAILURE (EXPLAIN) UNIT St. Lucie Unit o.

UNIT SHUTDOWNS AND POWER REDUCTIONS NAME 1 B: MAINT. OR TEST C: REFUELING DATE Jan. 6, 1977 D: REGULATORY RESTRICTION E: OPERATOR TRAINING AIID CO'IPI ETED BY V T Chilson LICENSE EXAMINATION F: ADttI H ISTRATIVE TELEPHONE (305) 552-3830.

G: OPERATIOtlAL ERROR (EXPLAIN) REPORT MONTH December 1976 H: OTHER (FJ(PLAIN)

(2) tIETHOD 1: MANUAL METHOD OF 2: .MANUAI SCRAM TYPE SHUTTING DOWN 3: AUTOMATIC SCRAM F! FORCED DURATION THE REACTOR OR OTHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtDIENTS NONE

SUMMARY

Unit No. 1 vas placed in commercial operation on December 21, 1976, at 12:01 a.m. Unit operated at approximately 50X R.P. through end of month.