ML19211C768: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                                            .
                                      *  -
#
January 4, 1980 BECo Ltr #80-2 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-048/01T              Docket Number 50-293 License DPR-35 Gentlemen:
January 4, 1980 BECo Ltr #80-2 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-048/01T              Docket Number 50-293 License DPR-35 Gentlemen:
The attached Licensee Event Report 79-048/01T, Failure of the Switchyard 125 Volt DC Battery Charger, is hereby submitted in accordance with the re-quirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.
The attached Licensee Event Report 79-048/01T, Failure of the Switchyard 125 Volt DC Battery Charger, is hereby submitted in accordance with the re-quirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.

Latest revision as of 04:46, 2 February 2020

Forwards LER 79-048/01T-0
ML19211C768
Person / Time
Site: Pilgrim
Issue date: 01/04/1980
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19211C769 List:
References
80-2, NUDOCS 8001140468
Download: ML19211C768 (1)


Text

.

January 4, 1980 BECo Ltr #80-2 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-048/01T Docket Number 50-293 License DPR-35 Gentlemen:

The attached Licensee Event Report 79-048/01T, Failure of the Switchyard 125 Volt DC Battery Charger, is hereby submitted in accordance with the re-quirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.

The Operations Review Committee has reviewed this event and classified it as operation in a degraded mode permitted by a Limiting Condition for Operation or requf ring shutdown (Specification 6.9.B.2.b) .

If there are any questions on this subject, please contact us.

Respe tfully Submitted,

/

P.; . McGuire Stnion Manager Nuclear Operations ETG:ep

Enclosures:

(3 copies)

LER 79-048/01T cc: Director (40 copies)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 1738 046 8001140