{{#Wiki_filter:AC CELERATEDÃSZRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DXSTRIBUTXON SYSTEM (RIDS)ACCESSION NBR: 8811160112 DOC.DATE: 88/11/10 NOTARIZED:
{{#Wiki_filter:AC CELERATED           ÃSZRIBUTION             DEMONSTRATION             SYSTEM REGULATORY INFORMATION DXSTRIBUTXON SYSTEM (RIDS)
NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME AUTHOR AFFILIATION GRIDLEY,R.
ACCESSION NBR: 8811160112         DOC. DATE:   88/11/10   NOTARIZED: NO         DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee               05000260 AUTH. NAME           AUTHOR AFFILIATION GRIDLEY,R.           Tennessee Valley Authority RECIP.NAME           RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Confirms 881014 info 6 forwards summary of electrical separation program.DISTRIBUTION CODE:-D030D COPIES RECEIVED:LTR ENCL SIZE: TITLE: TVA Facilities
Confirms 881014 info       6 forwards summary of     electrical separation program.                                                               R DISTRIBUTION CODE: -D030D       COPIES RECEIVED:LTR         ENCL     SIZE:
-Routine Correspondence NOTES:1 Copy each to: S.Black, J.G.Partlow, S.Richardson B.D.Llaw,F.McCoy.
TITLE: TVA   Facilities   Routine Correspondence NOTES:1 Copy each     to: S.Black,     J.G.Partlow, S.Richardson               05000260 B.D.Llaw,F.McCoy.                                                                     S RECIPIENT         'OPIES              RECIPXENT        COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME     LTTR ENCL SIMMS,M                 1      1    PD                      1    1 GEARS,G                 1      1 INTERNAL: ACRS                     1      1    ADM/LFMB                1    0 UD-   -     RECT       1      1    OGC/HDS2                1    0 EG FILE               1      1 EXTERNAL: LPDR                     1       1     NRC PDR                1   1 NSIC                    1       1 NOTES                                5       5 R
DOCKET 05000260 R 05000260 S RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS UD--RECT EG FILE EXTERNAL: LPDR NSIC NOTES'OPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 RECIPXENT ID CODE/NAME PD ADM/LFMB OGC/HDS2 NRC PDR COPIES LTTR ENCL 1 1 1 0 1 0 1 1 R I D RECIPIENTS PLEASE HELP US TO REIXJCE KQHRl CXRGACT KSE DOCUMEVZ CONZROL DESKi ROOM Pl-37 (EXT.20079)TO EIZKQQZE K)UR NAME FRQH DISTRIBUTION LISTS FOR DO(XlMENTS YOU DON'T NEED.'.,D D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 14 I 0~t I,)lj>gl t t TENNESSEE VALLEY AUTHORITY CHATTANOOGA.
I D
TENNESSEE 37401 5H 157B Lookout Place NOV 10 ISB lj.S.Huclear Regulatory Commission ATTN: Document Control Desk'Washington, D.C.20555 Gentlemen:
RECIPIENTS
In the Hatter of Tennessee Valley Authority Docket Ho.50-260 BROWS FERRY HlJCLEAR PLANT (BFN)-ELECTRICAL SEPARATION PROGRAH This letter confirms information provided to HRC in an October 14, 1988 teleconference call with HRC's Office of Special Projects.The following summary of TVA's electrical separation program is provided.The purpose of the electrical separation program at BFN is to ensure that the installed equipment.
                                                                                            .,D PLEASE HELP US TO REIXJCE KQHRl CXRGACT KSE DOCUMEVZ CONZROL DESKi           D ROOM Pl-37 (EXT. 20079) TO EIZKQQZE K)UR NAME FRQH DISTRIBUTION LISTS FOR DO(XlMENTS YOU DON'T NEED.'                                       S TOTAL NUMBER OF COPIES REQUIRED: LTTR             16   ENCL   14
and cable configuration meet the BFN separation criteria.This criteria incorporates the Final Safety Analysis Report commitments in this area.To implement this program, a review is being performed of existing Condition Adverse to Quality Reports which concern electrical separation.
 
The purpose of this review is to determine the extent.of the condition through a discovery process and to provide corrective action for identified discrepancies.
I 0
The discovery process will be completed before refueling of BFN unit 2.Identified discrepancies will be evaluated for their impact on systems required to be operational in the refueling mode.Those discrepancies which could impact the operability of these systems will be corrected before refueling of BFN unit 2.The remaining discrepancies will be evaluated for impact on subsequent.
  ~t I,)
plant restart milestones and corrected as required (for example, identified electrical separation discrepancies that potentially affect compliance with 10 CFR 50.48 will be handled in accordance with the BFN Fire Protection Program).A report describing the results of the discovery process and the disposition of identified discrepancies will be provided to HRC by December 23, 1988.8 811160112 881110 PDR ADOCK 05000260 P PDC An Equal Opportunity Employer U.S.Nuclear Regulatory Commission A summary list of commitments made in this letter is enclosed.If you have any further questions, please call Patrick Carier at (205)729-3566 Very truly yours, TENNESSEE VALLEY AUTHORITY R.ridley, Ha ger Nuclear Licensing and Regulatory Affairs Enclosure cc (Enclosure):
lj >
Hs.S.C.Black, Assistant Director for Projects TVA Projects Division U.S.Nuclear Regulatory Commission One Mhite Flint, North 11555 Rockville Pi'ke Rockville, Haryland 20852 Hr.F.R.HcCoy, Assistant Director for Inspection Programs TVA Projects Division U.S.Nuclear Regulatory Commission Region II 101 Harietta Street, Nrl, Suite 2900 Atlanta, Georgia 30323 Brooms Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611  
gl
/,c'1 V I  
 
\~8 ENCLOSURE BROWS FERRY HUCLEAR PLANT (BFN)-ELECTRICAL SEPARATION PROGRAH SUHHARY LIST OF COaiMITHENTS
tTENNESSEE VALLEY AUTHORITY t
~1.The discovery process for the electrical separation program will be completed before refueling of BFH unit 2.Identified discrepancies will be evaluated for their impact, on systems required to be operational in the refueling mode.Those discrepancies which could impact the operability of these systems will be corrected before refueling of BFN unit 2~2.A report describing the results of the discovery process and dispositioning of identified discrepancies will be provided to HRC by December 23, 1.988.  
CHATTANOOGA. TENNESSEE 37401 5H 157B Lookout Place NOV 10 ISB lj.S. Huclear Regulatory Commission ATTN: Document Control Desk
,~4'4}}
    'Washington, D.C. 20555 Gentlemen:
In the Hatter of                                                 Docket Ho. 50-260 Tennessee  Valley Authority BROWS FERRY HlJCLEAR PLANT (BFN) ELECTRICAL SEPARATION PROGRAH This letter confirms information provided to HRC in an October 14, 1988 teleconference call with HRC's Office of Special Projects. The following summary of TVA's electrical separation program is provided.
The purpose of the electrical   separation program at BFN is to ensure that the installed equipment. and cable configuration meet the BFN separation criteria.
This criteria incorporates the Final Safety Analysis Report commitments in this area.
To implement   this program, a review is being performed of existing Condition Adverse to Quality Reports which concern electrical separation. The purpose of this review is to determine the extent. of the condition through a discovery process and to provide corrective action for identified discrepancies.     The discovery process will be completed before refueling of BFN unit 2.
Identified discrepancies will be evaluated for their impact on systems required to be operational in the refueling mode. Those discrepancies which could impact the operability of these systems will be corrected before refueling of BFN unit 2. The remaining discrepancies will be evaluated for impact on subsequent. plant restart milestones and corrected as required (for example, identified electrical separation discrepancies that potentially affect compliance with 10 CFR 50.48 will be handled in accordance with the BFN Fire Protection Program).
A report describing the results of the discovery process and the disposition of identified discrepancies will be provided to HRC by December 23, 1988.
8 811160112   881110 PDR     ADOCK 05000260 PDC             An Equal Opportunity Employer P
 
U.S. Nuclear Regulatory Commission A summary list of commitments made in this letter is enclosed. If you have any further questions, please call Patrick Carier at (205) 729-3566 Very truly yours, TENNESSEE VALLEY AUTHORITY R. ridley, Ha ger Nuclear Licensing and Regulatory Affairs Enclosure cc (Enclosure):
Hs. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Mhite Flint, North 11555 Rockville Pi'ke Rockville, Haryland   20852 Hr. F. R. HcCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Harietta Street, Nrl, Suite 2900 Atlanta, Georgia 30323 Brooms Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611
 
/,c' 1
V I
 
ENCLOSURE
~8
  \
BROWS FERRY HUCLEAR PLANT (BFN) ELECTRICAL SEPARATION PROGRAH SUHHARY LIST OF COaiMITHENTS
    ~ 1. The discovery process for the electrical separation program will be completed before refueling of BFH unit 2. Identified discrepancies will be evaluated for their impact, on systems required to be operational in the refueling mode. Those discrepancies which could impact the operability of these systems will be corrected before refueling of BFN unit 2 ~
: 2. A report describing the results of the discovery process and dispositioning of identified discrepancies will be provided to   HRC by December 23, 1.988.
 
4
, ~
  '4}}

Latest revision as of 00:53, 22 October 2019

Discusses Util Electrical Separation Program,Per 881014 Telcon W/Nrc.Program Ensures That Installed Equipment & Cable Configuration Meets Util Separation Criteria,Per FSAR Commitments.Rept Will Be Provided by 881223
ML18033A443
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/10/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-R00493, TAC-R493, NUDOCS 8811160112
Download: ML18033A443 (7)


Text

AC CELERATED ÃSZRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DXSTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR: 8811160112 DOC. DATE: 88/11/10 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME AUTHOR AFFILIATION GRIDLEY,R. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)

SUBJECT:

Confirms 881014 info 6 forwards summary of electrical separation program. R DISTRIBUTION CODE: -D030D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: TVA Facilities Routine Correspondence NOTES:1 Copy each to: S.Black, J.G.Partlow, S.Richardson 05000260 B.D.Llaw,F.McCoy. S RECIPIENT 'OPIES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL SIMMS,M 1 1 PD 1 1 GEARS,G 1 1 INTERNAL: ACRS 1 1 ADM/LFMB 1 0 UD- - RECT 1 1 OGC/HDS2 1 0 EG FILE 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 5 5 R

I D

RECIPIENTS

.,D PLEASE HELP US TO REIXJCE KQHRl CXRGACT KSE DOCUMEVZ CONZROL DESKi D ROOM Pl-37 (EXT. 20079) TO EIZKQQZE K)UR NAME FRQH DISTRIBUTION LISTS FOR DO(XlMENTS YOU DON'T NEED.' S TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 14

I 0

~t I,)

lj >

gl

tTENNESSEE VALLEY AUTHORITY t

CHATTANOOGA. TENNESSEE 37401 5H 157B Lookout Place NOV 10 ISB lj.S. Huclear Regulatory Commission ATTN: Document Control Desk

'Washington, D.C. 20555 Gentlemen:

In the Hatter of Docket Ho. 50-260 Tennessee Valley Authority BROWS FERRY HlJCLEAR PLANT (BFN) ELECTRICAL SEPARATION PROGRAH This letter confirms information provided to HRC in an October 14, 1988 teleconference call with HRC's Office of Special Projects. The following summary of TVA's electrical separation program is provided.

The purpose of the electrical separation program at BFN is to ensure that the installed equipment. and cable configuration meet the BFN separation criteria.

This criteria incorporates the Final Safety Analysis Report commitments in this area.

To implement this program, a review is being performed of existing Condition Adverse to Quality Reports which concern electrical separation. The purpose of this review is to determine the extent. of the condition through a discovery process and to provide corrective action for identified discrepancies. The discovery process will be completed before refueling of BFN unit 2.

Identified discrepancies will be evaluated for their impact on systems required to be operational in the refueling mode. Those discrepancies which could impact the operability of these systems will be corrected before refueling of BFN unit 2. The remaining discrepancies will be evaluated for impact on subsequent. plant restart milestones and corrected as required (for example, identified electrical separation discrepancies that potentially affect compliance with 10 CFR 50.48 will be handled in accordance with the BFN Fire Protection Program).

A report describing the results of the discovery process and the disposition of identified discrepancies will be provided to HRC by December 23, 1988.

8 811160112 881110 PDR ADOCK 05000260 PDC An Equal Opportunity Employer P

U.S. Nuclear Regulatory Commission A summary list of commitments made in this letter is enclosed. If you have any further questions, please call Patrick Carier at (205) 729-3566 Very truly yours, TENNESSEE VALLEY AUTHORITY R. ridley, Ha ger Nuclear Licensing and Regulatory Affairs Enclosure cc (Enclosure):

Hs. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Mhite Flint, North 11555 Rockville Pi'ke Rockville, Haryland 20852 Hr. F. R. HcCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Harietta Street, Nrl, Suite 2900 Atlanta, Georgia 30323 Brooms Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611

/,c' 1

V I

ENCLOSURE

~8

\

BROWS FERRY HUCLEAR PLANT (BFN) ELECTRICAL SEPARATION PROGRAH SUHHARY LIST OF COaiMITHENTS

~ 1. The discovery process for the electrical separation program will be completed before refueling of BFH unit 2. Identified discrepancies will be evaluated for their impact, on systems required to be operational in the refueling mode. Those discrepancies which could impact the operability of these systems will be corrected before refueling of BFN unit 2 ~

2. A report describing the results of the discovery process and dispositioning of identified discrepancies will be provided to HRC by December 23, 1.988.