ML18003A579: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/30/1979
| issue date = 04/30/1979
| title = Forwards Seismic Monitoring Program,First Data Rept, 770930-790331
| title = Forwards Seismic Monitoring Program,First Data Rept, 770930-790331
| author name = MCDUFFIE M A
| author name = Mcduffie M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400, 05000401, 05000402, 05000403
| docket = 05000400, 05000401, 05000402, 05000403

Revision as of 08:33, 18 June 2019

Forwards Seismic Monitoring Program,First Data Rept, 770930-790331
ML18003A579
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/30/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18003A580 List:
References
NUDOCS 7905070475
Download: ML18003A579 (4)


Text

.,vt (',q sa REGULATORY ORMAT ION DISTRIBUTION,SYS~1 (RIDS)\ACCESS ION NBR 7 90507 047 5 DOC~DATE 79/04/30 NOTAR IZED s NO.FACIL:50 400 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 1 CAROLINA'0~401 SHEARON HARRIS NUCLEAR POWER PLANTR UNIT'i CAROLINA 50 402 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 3e CAROLINA AUTH~NAME'UTHOR AFF IL IAT ION MCDUFFIEPM

~A~" CAROLINA POWER&LIGHT CO~RECIP~NAME RECIPIENT AFFILIATION DENTON H~R~OFFICE OF NUCLEAR REACTOR REGULATION DOCKET 05000400 05000401 050004(2 SUBJECT'ORWARDS SEISMIC MONITORING PROGRAM@770930 790331 DISTRIBUTION CODE: BOOIS COPIES RECEIVED>LTR j ENCL Z SIZE+TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE'OTES:

RECIPIENT ID CODE/NAME ACTIONS 05 PM/0/k~g BC Zhr INTERNAL: 0 06 E 09 GEOSCZEN BR ii MECH ENG BR 13 NATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I&C SYS BR 22 AD SITE TECH 27 EFF L TRT SYS 29 KIRKWOOD AD PLANT SYS AD SITE" ANLYSIS MPA EXTERNALS 03 LPDR 30 ACRS COPIES LTTR ENCL 1 1 1 0 1 1 2 2 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 0 1 0 1 0 1 1 10 10 REC IP IENT ID CODE/NAME AD Ud~eC.co LA l Lclrf 4~02 NRC PDR 08 OPERA L IC BR io QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTA1N SYS 21 POWER SYS BR 26 ACCDNT ANI YS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 04 NSIC COPIES LTTR ENCL'1 0 1 0 1 1 1 1 1,, 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 0 1 0 1 0 1 1~cr8 g8 FP8>4 M 8P%cd P c-8 MQ'TOTAL NUMBER OF COPIES REQUIRED: LTTR 49 ENCL 39 Ii 4 II~k P I V EW C I l r', I l J/

Carolina Power&Lighl Company April 30, 1979 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS.1, 2, 3, AND 4 DOCKET NOS.50-400, 50-401, 50-402, AND 50-403 SEISMIC MONITORING'PROGRAM

Dear Mr.Denton:

On February 13, 1976, Carolina Power&Light Company committed to commence a seismic monitoring pxogram in order to provide appropriate base-line data prior to the scheduled commencement of filling of the Auxiliary Reservoir in June, 1979..Attached is the First Data Report, Shearon Harris Nuclear Power Plant Seismic Monitoring Program.The seismic network was installed and became operational on September 30, 1977.The attached report provides data collected during the period September 30, 1977 to March 31, 1979.Future reports will be subadtted quarterly commencing with the'period April 1," 1979 to June 30, 1979.Yours very truly, M.A.McDuffie Senior Vice President Engineering

&Construction SDF/mf Attachment v 9050'.o~7+411 FayetteVitle Street~P.O.'BOX 1551~Raleigh.N.C.27602 I l