ML18022A788: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:A CCELERATED DI UTION DEMONSTI'&TION SYSTEM C*REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
 
==SUBJECT:==
Confirms understanding of status of NRC activities re r plant.SIZE: proposed WakeSouth Regional Airport located n DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR
/ENCL TITLE: OR Submittal:
General Distribution NOTES:Application for permit renewal filed.ACCESSION NBR:9003140035 DOC.DATE: 90/03/06 NOTARIZED:
NO FACIL:50-400Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CUTTER,A.B.
Carolina Power'Light: Co.'ECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000400 D S 05000400-/RECIPIENT ID CODE/NAME.
PD2-1 LA BECKER,D INTERNAL'CRS NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC/LFMB 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL'6 1 1'1 1 1 0 1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ECMB 9H NRR/DST'E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR E 1 1"1 1 1 1 1 CL, R D NOTE TO ALL"RIDS" RECIPIENIS:
PLEASE HELP US TO REDUCE WASH?!CONTACI'HE DOCUMENT CONTROL DESK,'ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DON'T NEED)A D D S TOTAL NUMBER OF COPIES.REQUIRED:
LTTR 27 ENCL 5 4 5~'t f k a+p g~I~f Carolina Power&Light Company P.O.Box 1551~Raleigh, N.C.27602 MAR 0 6 1990 A.B CUTTER Vice President Nuclear Services Department United States Nuclear Regulatory'ommission ATTENTION:
Document Control Desk Washington, DC 20555 SERIAL: NLS-90-032 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 WAKESOUTH REGIONAL AIRPORT Gentlemen:
The purpose of this letter is to confirm our understanding of the status of NRC activity with regard to the proposed WakeSouth Regional Airport located near the Shearon Harris Nuclear Power Plant (SHNPP).On December 21, 1989, we presented to the NRC staff tha results of our aircraft hazards study associated with the proposed airport.By letter dated January 12, 1990, the NRC issued a summary of this meeting.On January 17, 1990, CP&L formally submitted the results of this aircraft hazards study.CP&L is in the process of completing negotiations with the WakeSouth Airport Authority.
In order to support the current airport development schedule, pending issues should be resolved by March 31, 1990.Based on the interactions with the NRC outlined in the preceding paragraph, CP&L believes there are no information requirements or regulatory actions pending with NRC in regard to this matter.Your confirmation of this understanding is requested by March 31, 1990.Please refer any questions regarding this submittal to Mr.L.I.Loflin at (919)546-6242.Yours very t ly, A.B Cutter JHE/j he ()cc: Mr.Mr.Mr.Mr.R'.A.Becker S.D.Ebneter J.E.Tedrow S.A.Varga~003gq00 p~~R ADOC3q~500306 F Cg 0~00040 pop
:l.r~t 9*1 T~I I}}

Revision as of 17:56, 11 September 2018

Confirms Understanding of Status of NRC Activities Re Proposed Wakesouth Regional Airport Located Near Plant Site. Pending Issues Should Be Resolved by 900331 to Enable Util to Complete Negotiations W/Airport Authority
ML18022A788
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/06/1990
From: CUTTER A B
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS-90-032, NLS-90-32, NUDOCS 9003140035
Download: ML18022A788 (4)


Text

A CCELERATED DI UTION DEMONSTI'&TION SYSTEM C*REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SUBJECT:

Confirms understanding of status of NRC activities re r plant.SIZE: proposed WakeSouth Regional Airport located n DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR

/ENCL TITLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.ACCESSION NBR:9003140035 DOC.DATE: 90/03/06 NOTARIZED:

NO FACIL:50-400Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CUTTER,A.B.

Carolina Power'Light: Co.'ECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000400 D S 05000400-/RECIPIENT ID CODE/NAME.

PD2-1 LA BECKER,D INTERNAL'CRS NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC/LFMB 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL'6 1 1'1 1 1 0 1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ECMB 9H NRR/DST'E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR E 1 1"1 1 1 1 1 CL, R D NOTE TO ALL"RIDS" RECIPIENIS:

PLEASE HELP US TO REDUCE WASH?!CONTACI'HE DOCUMENT CONTROL DESK,'ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DON'T NEED)A D D S TOTAL NUMBER OF COPIES.REQUIRED:

LTTR 27 ENCL 5 4 5~'t f k a+p g~I~f Carolina Power&Light Company P.O.Box 1551~Raleigh, N.C.27602 MAR 0 6 1990 A.B CUTTER Vice President Nuclear Services Department United States Nuclear Regulatory'ommission ATTENTION:

Document Control Desk Washington, DC 20555 SERIAL: NLS-90-032 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 WAKESOUTH REGIONAL AIRPORT Gentlemen:

The purpose of this letter is to confirm our understanding of the status of NRC activity with regard to the proposed WakeSouth Regional Airport located near the Shearon Harris Nuclear Power Plant (SHNPP).On December 21, 1989, we presented to the NRC staff tha results of our aircraft hazards study associated with the proposed airport.By letter dated January 12, 1990, the NRC issued a summary of this meeting.On January 17, 1990, CP&L formally submitted the results of this aircraft hazards study.CP&L is in the process of completing negotiations with the WakeSouth Airport Authority.

In order to support the current airport development schedule, pending issues should be resolved by March 31, 1990.Based on the interactions with the NRC outlined in the preceding paragraph, CP&L believes there are no information requirements or regulatory actions pending with NRC in regard to this matter.Your confirmation of this understanding is requested by March 31, 1990.Please refer any questions regarding this submittal to Mr.L.I.Loflin at (919)546-6242.Yours very t ly, A.B Cutter JHE/j he ()cc: Mr.Mr.Mr.Mr.R'.A.Becker S.D.Ebneter J.E.Tedrow S.A.Varga~003gq00 p~~R ADOC3q~500306 F Cg 0~00040 pop

l.r~t 9*1 T~I I