ML17228B101: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1995
| issue date = 03/31/1995
| title = Monthly Operating Repts for Mar 1995 for St Lucie.W/950414 Ltr
| title = Monthly Operating Repts for Mar 1995 for St Lucie.W/950414 Ltr
| author name = ROGERS J A, SAGER F A
| author name = Rogers J, Sager F
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:P R.XC3H.IMV' CUE LERATED RIDS PROCESSING)
{{#Wiki_filter:P R.XC3H.IMV' CUE LERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9504180276 DOC.DATE: 95/03/31 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-335 St.Lucie Plant;Unit 1, Florida Power&Light Co.50-389 St., Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
ACCESSION NBR:9504180276                         DOC.DATE:   95/03/31   NOTARIZED: NO           DOCKET g FACIL:50-335 St. Lucie Plant; Unit 1, Florida Power                           & Light   Co. 05000335 50-389 St., Lucie Plant, Unit 2, Florida Power               & Light   Co. 05000389 AUTH. NAME                             AUTHOR AFFILIATION                                               P ROGERS,J.A.                           Florida Power & Light Co.
Florida Power&Light Co.SAGER,F.A.
SAGER,F.A.                             Florida Power & Light Co.
Florida Power&Light Co.RECIP.NAME
RECIP.NAME                         'ECIPIENT AFFILIATION
'ECIPIENT AFFILIATION DOCKET g 05000335 05000389 P


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Mar 1995 for St Lucie.W/950414 ltr..DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR L ENCL L SIZE:/TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS F~~HATEREEEE40 1~RR/DePS/OX'Cs'XTERNAL:
Monthly operating repts   for Mar 1995   for St   Lucie.W/950414 ltr..
LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1~1 1 1 1 1 1 1 D C U N NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE24D TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXI'.504-2083)TO ELIMINATE YOUR NAME I:ROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 Florida Power&Light Company, P.O.Box 128, Fort Pierce.FL 34854-0128 April 14, 1995 L-95-116 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1995, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions'on this information, please contact US~Very truly yours, D.A.Sager Vice President St.Lucie Plant fo r DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments 950418027g PDR ADQCK 05000335 PDR!, an FPL Group company  
COPIES RECEIVED:LTR     L   ENCL L     SIZE:   /
~~~~
NOTES:
OPERATIHG DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 4/7/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: MARCH 1995 3~LICENSED THERMAL POWER (MWT): 2700 4.HAMEPLATE RATING (GROSS WE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPEHDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SIHCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASOHS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11~HOURS IN REPORT PERIOD: 12.HUHBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEHERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (HWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21'APACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 744 571.7 0.0 565.0 0.0 1484353 491330 463183 75.9 75.9 74'75.0 0.0 2160 1940.6 0.0 1933.2 0.0 5172738 1719910 1629700 89.5 89.5 89.9 90.9 0.0 160200.0 125264.4 205.3 123890.0 0.0 320906479 105869920 100066603 77.3 77.4 76.7 76.1 3.9 25.IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
RECIPIENT        COPIES            RECIPIENT           COPIES ID CODE/NAME     LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD2-2 PD             1    1      NORRIS,J                1    1 INTERNAL: ACRS                                     10    10      AEOD/SPD/RRAB            1  ~  1 F~~HATEREEEE40 1     1    1      NRR/DISP/PIPB            1    1 1    1      RGN2                    1    1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
      ~RR/DePS/OX'Cs'XTERNAL:
50-335 St.Lucie¹1 April 7, 1995 J.A.ROGERS (407)468-4157 MONTH DAY 3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94 3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 AVERAGE DAILY POWER LEVEL (MWe-Ne t)-7-7-10-11-17-29-34 163 613 760 850 852 851 852 853 851 851 851 851 852 853 853 852 851 851 852 851 850 849 849 850 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I: DATE: April 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE:
LITCO BRYCE,J H     1     1     NOAC                     1     1 NRC PDR              1     1 D
(407)468-4157 REPORT MONTH No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report¹System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 950227 950308 226.8 0.0 B N/A N/A CB VALVEXX RC FUELXX Unit 1 offline to repair quench tank leak.Unit 1 held at 66%power due to fuel limitations.
C U
F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG4)161)
N NOTE TO ALL"RIDS" RECIPIENTS:
Exhibit 1-Same Source tslss7 FPL  
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXI'. 504-2083 ) TO ELIMINATEYOUR NAME I:ROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                           20   ENCL   20
 
Florida Power & Light Company, P.O. Box 128, Fort Pierce. FL 34854-0128 April 14,       1995 L-95-116 10 CFR 50.36 U. S.     Nuclear Regulatory Commission Attn:     Document Control Desk Washington,           DC 20555 Re:     St. Lucie Units         1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1995, Operating Status                                   and Summary                 of Operating Experience Reports for St. Lucie Units                               1   and 2.
Should there be any questions 'on               this information, please contact US ~
Very     truly     yours, fo r D. A. Sager Vice President St. Lucie Plant DAS/GRM cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 950418027g PDR     ADQCK     05000335 PDR   !,
an FPL Group company
 
    ~ ~
~ ~
 
OPERATIHG DATA REPORT DOCKET NO         50 - 335 DATE               4/ 7/95 FPL LICENSING GROUP   - JUNO TELEPHONE     407/694/4432 OPERATING STATUS
: 1. UNIT NAME: ST. LUCIE       UNIT 1
: 2. REPORTING PERIOD:     MARCH 1995 3 ~ LICENSED THERMAL POWER (MWT):                 2700
: 4. HAMEPLATE RATING (GROSS WE):                     850
: 5. DESIGN ELECTRICAL RATING (NET MWE):               830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         872
: 7. MAXIMUM DEPEHDABLE CAPACITY (NET MWE):           839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS     NUMBER 3 THROUGH 7)
SIHCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED,   IF ANY (NET MWE)
: 10. REASOHS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE 11 ~ HOURS IN REPORT PERIOD:                        744      2160      160200.0
: 12. HUHBER OF HOURS REACTOR WAS CRITICAL             571.7    1940.6    125264.4
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0        205.3
: 14. HOURS GENERATOR ON-LINE                           565.0    1933.2    123890.0
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0          0.0
: 16. GROSS THERMAL ENERGY GEHERATED (MWH)           1484353    5172738    320906479
: 17. GROSS ELECTRICAL ENERGY GENERATED (HWH)         491330    1719910    105869920
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           463183    1629700    100066603
: 19. UNIT SERVICE FACTOR                               75.9      89.5          77.3
: 20. UNIT AVAILABILITYFACTOR                            75.9      89.5          77.4 21 'APACITY   FACTOR (USING MDC NET)                 74 '      89.9          76.7
: 22. CAPACITY FACTOR (USING DER NET)                   75.0       90.9         76.1
: 23. UNIT FORCED OUTAGE RATE                            0.0       0.0           3.9
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6    MONTHS :
: 25. IF   SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:   50-335 UNIT:          St. Lucie ¹1 DATE            April 7, 1995 COMPLETED BY:  J.A. ROGERS TELEPHONE:      (407) 468-4157 MONTH DAY       AVERAGE  DAILY POWER LEVEL (MWe -Ne t) 3/01/94   -7 3/02/94   -7 3/03/94   -10 3/04/94   -11 3/05/94   -17 3/06/94   -29 3/07/94   -34 3/08/94   163 3/09/94   613 3/10/94   760 3/11/94   850 3/12/94   852 3/13/94   851 3/14/94   852 3/15/94   853 3/16/94   851 3/17/94   851 3/18/94   851 3/19/94   851 3/20/94   852 3/21/94   853 3/22/94   853 3/23/94   852 3/24/94   851 3/25/94   851 3/26/94   852 3/27/94   851 3/28/94   850 3/29/94   849 3/30/94   849 3/31/94   850
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                     50-335 UNIT NAME:                     ST LUCIE UNIT       I:
DATE:                           April 7, 1995 COMPLETED BY:                 J.A.ROGERS TELEPHONE:                     (407) 468-4157 REPORT MONTH No.         Date Type Duration (Hours)
Reason'ethod of Shutting Reactor'icenseeEvent Report System Code'omponent   Code'ause                   & Corrective Action to Down                ¹                                              Prevent Recurrence 950227       226.8         B                               N/A         CB         VALVEXX     Unit 1 offline to repair quench tank leak.
950308        0.0                                          N/A        RC          FUELXX Unit 1 held at 66% power due to fuel limitations.
F Forced                         Reason                                        Method                                Exhibit G - Instructions for S Scheduled                       A - Equipment failure (explain)               1 - Manual                            Preparation of Data Entry B - Maintenance or Test                       2 - Manual Scram                      Sheets Licensee Event Report C - Refueling                                 3 - Automatic Scram                    (LER) File (NUREG4)161)
D - Regulatory restriction                   4 - Continued E - Operator Training & License Examination   5 - Load Reduction F - Administrative                           9 - Other (Explain)                   Exhibit  1 - Same Source G - Operational Error (Explain)
H - Other (Explain) tslss7 FPL


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO~: UNIT: DATE COMPLETED BY TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO ~ : 50-335 UNIT:          St. Lucie gi DATE          4/7/95 COMPLETED BY  J.A. Rogers TELEPHONE:      (407) 468-4157 REPORT MONTH   March 1995 The Unit started the month in a scheduled maintenance outage to repair pressurizer code safety valve seat leakage.         The Unit returned to service on March 8, 1995, and operated at reduced power until March 9, 1995 due to fuel limitations. The Unit operated at essentially full power for the remainder of the month.
50-335 St.Lucie gi 4/7/95 J.A.Rogers (407)468-4157 REPORT MONTH March 1995 The Unit started the month in a scheduled maintenance outage to repair pressurizer code safety valve seat leakage.The Unit returned to service on March 8, 1995, and operated at reduced power until March 9, 1995 due to fuel limitations.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
The Unit operated at essentially full power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.A replacement copy of the Zanuary 1995 Operating Data Report for Unit 1 is included to correct an error reported on line 17 as requested by NRC contractor Gary Roberts of INEL.
A replacement copy of the Zanuary 1995 Operating Data Report for Unit 1 is included to correct an error reported on line 17 as requested by NRC contractor Gary Roberts of INEL.
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 3/24/95 FPL LICENSING GROUP-JUNO TELEPHOHE 407/694/4432 1.UNIT NAME: ST.LUCIE UHIT 1 2.REPORTING PERIOD: JANUARY 1995 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHAHGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MllE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL EHERGY GEHERATED (MWH)17.GROSS ELECTRICAL EHERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USIHG MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER HEXT 6 MONTHS: 744 744~0 0~0 744.0 0.0 2008954 669340 636037 100.0 100.0 101.9 103.0 0.0 744 744.0 0.0 744.0 0.0 2008954 669340 636037 100.0 100.0 101.9 103.0 0'158784.0 124067.8 205.3 122700.9 205.3 317742695 104819350 99072940 77.3 77.3 76.6 76.0 3.9 25.IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
OPERATIHG DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 4/7/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST~LUCIE UNIT 2 2.REPORTING PERIOD: MARCH 1995 3.LICENSED THERMAL POWER (HWT): 2700 4.NAHEPLATE RATING (GROSS MWE): 850 5.DESIGH ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11~HOURS IN REPORT PERIOD: 12.NUHBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GEHERATOR ON-LINE 15.UNIT RESERVE SHUTDOWH HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL EHERGY GEHERATED (HWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC HET)22~CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 744 744.0 0.0 744.0 0.0 2003552 662790 628494 100.0 100~0 100.7 101.8 0.0 2160 2085.4 0.0 2081.3 0.0 5563433 1843170 1744974 96.4 96.4 96.3 97.3 3.6 102097.0 86353.1 0;0 84948.3 0.0 220760974 73296880 69250854 83.2 83.2 81.8 82.2 6.9 25.IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
OPERATING DATA REPORT DOCKET NO         50 - 335 DATE               3/24/95 FPL LICENSING GROUP   - JUNO TELEPHOHE     407/694/4432 OPERATING STATUS
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
: 1. UNIT NAME:   ST. LUCIE     UHIT   1
50-389 St.Lucie¹2 April 7,1995 O'.A ROGERS (407)468-4157 MONTH DAY 3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94.3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 AVERAGE DAILY POWER LEVEL (MWe-Ne t)845'851 851 852 849 848 849 847 848 851 851 852 851 851 849 848 847 820 809 847 849 849 845 845 845 846 834 841 840~841 840 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: April 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE:
: 2. REPORTING PERIOD: JANUARY 1995
(407)468-4157 REPORT MONTH No.Date Duration (Hours)Reasona Method of Shutting Down Reactor'icensee Event Report¹System Code4 Component Code'ause&Corrective Action to Prevent Recurrence Unit 2 operated essentially at full power for the entire month.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Adminisuative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Insuuctions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG4)161)
: 3. LICENSED THERMAL POWER (MWT):                   2700
Exhibit 1-Same Source 09tssr FFL  
: 4. NAMEPLATE RATING (GROSS MWE):                     850
: 5. DESIGN ELECTRICAL RATING (NET MWE):               830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           839
: 8. IF CHAHGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3     THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED,   IF ANY (NET MllE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          744        744      158784.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           744 ~ 0    744.0    124067.8
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0~0        0.0        205.3
: 14. HOURS GENERATOR ON-LINE                         744.0      744.0    122700.9
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0        205.3
: 16. GROSS THERMAL EHERGY GEHERATED (MWH)           2008954    2008954    317742695
: 17. GROSS ELECTRICAL EHERGY GENERATED (MWH)         669340    669340    104819350
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           636037    636037    99072940
: 19. UNIT SERVICE FACTOR                             100.0      100.0          77.3
: 20. UNIT AVAILABILITYFACTOR                          100.0      100.0          77.3
: 21. CAPACITY FACTOR (USIHG MDC NET)                 101.9      101.9          76.6
: 22. CAPACITY FACTOR (USING DER NET)                 103.0     103.0         76.0
: 23. UNIT FORCED OUTAGE RATE                            0.0       0'           3.9
: 24. SHUTDOWNS SCHEDULED OVER HEXT  6   MONTHS :
: 25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
OPERATIHG DATA REPORT DOCKET NO         50 - 389 DATE               4/ 7/95 FPL LICENSING GROUP   - JUNO TELEPHONE     407/694/4432 OPERATING STATUS
: 1. UNIT NAME: ST ~ LUCIE       UNIT 2
: 2. REPORTING PERIOD:     MARCH 1995
: 3. LICENSED THERMAL POWER (HWT):                   2700
: 4. NAHEPLATE RATING (GROSS MWE):                   850
: 5. DESIGH ELECTRICAL RATING (NET MWE):             830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3     THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE 11 ~ HOURS IN REPORT PERIOD:                        744      2160      102097.0
: 12. NUHBER OF HOURS REACTOR WAS CRITICAL           744.0    2085.4      86353.1
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0          0;0
: 14. HOURS GEHERATOR ON-LINE                       744.0    2081.3      84948.3
: 15. UNIT RESERVE SHUTDOWH HOURS                     0.0        0.0          0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         2003552    5563433    220760974
: 17. GROSS ELECTRICAL EHERGY GEHERATED (HWH)       662790    1843170    73296880
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         628494    1744974    69250854
: 19. UNIT SERVICE FACTOR                           100.0      96.4          83.2
: 20. UNIT AVAILABILITYFACTOR                        100 ~ 0    96.4          83.2
: 21. CAPACITY FACTOR (USING MDC HET)               100.7      96.3          81.8 22 ~ CAPACITY FACTOR (USING DER NET)                 101.8       97.3         82.2
: 23. UNIT FORCED OUTAGE RATE                            0.0       3.6          6.9
: 24. SHUTDOWNS SCHEDULED OVER NEXT  6 MONTHS :
: 25. IF   SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:     50-389 UNIT:          St. Lucie ¹2 DATE:          April 7,1995 COMPLETED BY:  O'.A ROGERS TELEPHONE:      (407) 468-4157 MONTH DAY       AVERAGE  DAILY POWER LEVEL (MWe -Ne t )
3/01/94   845 3/02/94   '851 3/03/94   851 3/04/94   852 3/05/94   849 3/06/94   848 3/07/94   849 3/08/94   847 3/09/94   848 3/10/94   851 3/11/94   851 3/12/94   852 3/13/94   851 3/14/94   851 3/15/94   849 3/16/94   848 3/17/94   847 3/18/94   820 3/19/94 . 809 3/20/94   847 3/21/94   849 3/22/94   849 3/23/94   845 3/24/94   845 3/25/94   845 3/26/94   846 3/27/94   834 3/28/94   841 3/29/94   840 ~
3/30/94   841 3/31/94   840
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-389 UNIT NAME:                   ST LUCIE UNIT 2 DATE:                         April 7, 1995 COMPLETED BY:                 J.A. ROGERS TELEPHONE:                   (407) 468-4157 REPORT MONTH No.         Date Duration (Hours)
Reasona       Method of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component                          & Corrective Action to Down                ¹                                                Prevent Recurrence Unit 2 operated essentially at full power for the entire month.
F Forced                   Reason                                        Method                                  Exhibit G - Insuuctions for S Scheduled               A - Equipment failure (explain)               1 - Manual                              Preparation of Data Entry B - Maintenance or Test                       2 - Manual Scram                        Sheets Licensee Event Report C - Refueling                                 3 - Automatic Scram                      (LER) File (NUREG4)161)
D - Regulatory restriction                   4 - Continued E - Operator Training & License Examination   5 - Load Reduction F - Adminisuative                             9 - Other (Explain)                     Exhibit  1 - Same Source G - Operational Error (Explain)
H - Other (Explain) 09tssr FFL


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT'ATE: COMPLETED BY0 TELEPHONE:
OF OPERATING EXPERIENCE DOCKET   NO.: 50-389 UNIT'ATE:
50-389 St.Lucie g2 4/7/95 J.A.Rogers (407)'68-4157 REPORT MONTH March 1995 Unit 2 operated at essentially full power for the entire month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no.challenges to the PORVs or safety valves during the report period.A replacement copy of the February 1995 Operating Data Report for Unit 2 is included to correct errors reported on lines 14 and 23 as requested by NRC contractor Gary Roberts of INEL.
St. Lucie g2 4/7/95 COMPLETED BY0  J.A. Rogers TELEPHONE:      (407) '68-4157 REPORT MONTH   March 1995 Unit 2 operated at essentially full power for the entire month.
OPERATING DATA REPORT OPERATING STATUS DOCKET HO 50-389 DATE 4/7/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: FEBRUARY 1995 3.LICENSED THERHAL POWER (MWT): 2700 4.HAHEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIHUM DEPENDABLE CAPACITY (GROSS HWE): 882 7.HAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRiCTED, IF ANY (NET HWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE
In accordance with the requirements of Technical Specification 6.9.1.6, there were no .challenges to the PORVs or safety valves during the report period.
'11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL EHERGY GENERATED (HWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (HWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER HET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS: 672 597.4 0.0 593.3 0.0 1551360 513000 483376 88.3 88.3 85.7 86.7 11.7 1416 1341.4 0.0 1337.3 0.0 3559881 1180380 1116480 94.4 94.4 94.0 95.0 5'101353.0 85609.1 0.0 84204.3 0.0 218757422 72634090 68622360 83.1 83.1 81.6 82.0 6.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:}}
A replacement copy of the February 1995 Operating Data Report for Unit 2 is included to correct errors reported on lines 14 and 23 as requested by NRC contractor Gary Roberts of INEL.
 
OPERATING DATA REPORT DOCKET HO           50 - 389 DATE                 4/ 7/95 FPL LICENSING GROUP   - JUNO TELEPHONE       407/694/4432 OPERATING STATUS
: 1. UNIT NAME:   ST. LUCIE     UNIT 2
: 2. REPORTING PERIOD: FEBRUARY 1995
: 3. LICENSED THERHAL POWER (MWT):                 2700
: 4. HAHEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):             830
: 6. MAXIHUM DEPENDABLE CAPACITY (GROSS HWE):       882
: 7. HAXIMUM DEPENDABLE CAPACITY (NET MWE):         839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3   THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRiCTED, IF ANY (NET HWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
'11. HOURS IN REPORT PERIOD:                        672      1416        101353.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL         597.4    1341.4      85609.1
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0          0.0
: 14. HOURS GENERATOR ON-LINE                       593.3    1337.3      84204.3
: 15. UNIT RESERVE SHUTDOWN HOURS                     0.0        0.0            0.0
: 16. GROSS THERMAL EHERGY GENERATED (HWH)       1551360    3559881    218757422
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       513000    1180380      72634090
: 18. NET ELECTRICAL ENERGY GENERATED (HWH)         483376    1116480      68622360
: 19. UNIT SERVICE FACTOR                             88.3      94.4          83.1
: 20. UNIT AVAILABILITYFACTOR                        88.3      94.4          83.1
: 21. CAPACITY FACTOR (USING MDC NET)                 85.7      94.0          81.6
: 22. CAPACITY FACTOR (USING DER HET)                 86.7      95.0          82.0
: 23. UNIT FORCED OUTAGE RATE                         11.7        5 '            6.9
: 24. SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS :
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:}}

Latest revision as of 22:05, 29 October 2019

Monthly Operating Repts for Mar 1995 for St Lucie.W/950414 Ltr
ML17228B101
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1995
From: Rogers J, Sager F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-116, NUDOCS 9504180276
Download: ML17228B101 (13)


Text

P R.XC3H.IMV' CUE LERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9504180276 DOC.DATE: 95/03/31 NOTARIZED: NO DOCKET g FACIL:50-335 St. Lucie Plant; Unit 1, Florida Power & Light Co. 05000335 50-389 St., Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION P ROGERS,J.A. Florida Power & Light Co.

SAGER,F.A. Florida Power & Light Co.

RECIP.NAME 'ECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Mar 1995 for St Lucie.W/950414 ltr..

DISTRIBUTION CODE: IE24D TITLE: Monthly Operating Report (per Tech Specs)

COPIES RECEIVED:LTR L ENCL L SIZE: /

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 ~ 1 F~~HATEREEEE40 1 1 1 NRR/DISP/PIPB 1 1 1 1 RGN2 1 1

~RR/DePS/OX'Cs'XTERNAL:

LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXI'. 504-2083 ) TO ELIMINATEYOUR NAME I:ROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

Florida Power & Light Company, P.O. Box 128, Fort Pierce. FL 34854-0128 April 14, 1995 L-95-116 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1995, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions 'on this information, please contact US ~

Very truly yours, fo r D. A. Sager Vice President St. Lucie Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 950418027g PDR ADQCK 05000335 PDR  !,

an FPL Group company

~ ~

~ ~

OPERATIHG DATA REPORT DOCKET NO 50 - 335 DATE 4/ 7/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: MARCH 1995 3 ~ LICENSED THERMAL POWER (MWT): 2700
4. HAMEPLATE RATING (GROSS WE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPEHDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SIHCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASOHS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE 11 ~ HOURS IN REPORT PERIOD: 744 2160 160200.0

12. HUHBER OF HOURS REACTOR WAS CRITICAL 571.7 1940.6 125264.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE 565.0 1933.2 123890.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEHERATED (MWH) 1484353 5172738 320906479
17. GROSS ELECTRICAL ENERGY GENERATED (HWH) 491330 1719910 105869920
18. NET ELECTRICAL ENERGY GENERATED (MWH) 463183 1629700 100066603
19. UNIT SERVICE FACTOR 75.9 89.5 77.3
20. UNIT AVAILABILITYFACTOR 75.9 89.5 77.4 21 'APACITY FACTOR (USING MDC NET) 74 ' 89.9 76.7
22. CAPACITY FACTOR (USING DER NET) 75.0 90.9 76.1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE April 7, 1995 COMPLETED BY: J.A. ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe -Ne t) 3/01/94 -7 3/02/94 -7 3/03/94 -10 3/04/94 -11 3/05/94 -17 3/06/94 -29 3/07/94 -34 3/08/94 163 3/09/94 613 3/10/94 760 3/11/94 850 3/12/94 852 3/13/94 851 3/14/94 852 3/15/94 853 3/16/94 851 3/17/94 851 3/18/94 851 3/19/94 851 3/20/94 852 3/21/94 853 3/22/94 853 3/23/94 852 3/24/94 851 3/25/94 851 3/26/94 852 3/27/94 851 3/28/94 850 3/29/94 849 3/30/94 849 3/31/94 850

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I:

DATE: April 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icenseeEvent Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 950227 226.8 B N/A CB VALVEXX Unit 1 offline to repair quench tank leak.

950308 0.0 N/A RC FUELXX Unit 1 held at 66% power due to fuel limitations.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4)161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain) tslss7 FPL

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ : 50-335 UNIT: St. Lucie gi DATE 4/7/95 COMPLETED BY J.A. Rogers TELEPHONE: (407) 468-4157 REPORT MONTH March 1995 The Unit started the month in a scheduled maintenance outage to repair pressurizer code safety valve seat leakage. The Unit returned to service on March 8, 1995, and operated at reduced power until March 9, 1995 due to fuel limitations. The Unit operated at essentially full power for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

A replacement copy of the Zanuary 1995 Operating Data Report for Unit 1 is included to correct an error reported on line 17 as requested by NRC contractor Gary Roberts of INEL.

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 3/24/95 FPL LICENSING GROUP - JUNO TELEPHOHE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UHIT 1
2. REPORTING PERIOD: JANUARY 1995
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHAHGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MllE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 744 158784.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 ~ 0 744.0 124067.8
13. REACTOR RESERVE SHUTDOWN HOURS 0~0 0.0 205.3
14. HOURS GENERATOR ON-LINE 744.0 744.0 122700.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
16. GROSS THERMAL EHERGY GEHERATED (MWH) 2008954 2008954 317742695
17. GROSS ELECTRICAL EHERGY GENERATED (MWH) 669340 669340 104819350
18. NET ELECTRICAL ENERGY GENERATED (MWH) 636037 636037 99072940
19. UNIT SERVICE FACTOR 100.0 100.0 77.3
20. UNIT AVAILABILITYFACTOR 100.0 100.0 77.3
21. CAPACITY FACTOR (USIHG MDC NET) 101.9 101.9 76.6
22. CAPACITY FACTOR (USING DER NET) 103.0 103.0 76.0
23. UNIT FORCED OUTAGE RATE 0.0 0' 3.9
24. SHUTDOWNS SCHEDULED OVER HEXT 6 MONTHS :
25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

OPERATIHG DATA REPORT DOCKET NO 50 - 389 DATE 4/ 7/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST ~ LUCIE UNIT 2
2. REPORTING PERIOD: MARCH 1995
3. LICENSED THERMAL POWER (HWT): 2700
4. NAHEPLATE RATING (GROSS MWE): 850
5. DESIGH ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE 11 ~ HOURS IN REPORT PERIOD: 744 2160 102097.0

12. NUHBER OF HOURS REACTOR WAS CRITICAL 744.0 2085.4 86353.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0;0
14. HOURS GEHERATOR ON-LINE 744.0 2081.3 84948.3
15. UNIT RESERVE SHUTDOWH HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2003552 5563433 220760974
17. GROSS ELECTRICAL EHERGY GEHERATED (HWH) 662790 1843170 73296880
18. NET ELECTRICAL ENERGY GENERATED (MWH) 628494 1744974 69250854
19. UNIT SERVICE FACTOR 100.0 96.4 83.2
20. UNIT AVAILABILITYFACTOR 100 ~ 0 96.4 83.2
21. CAPACITY FACTOR (USING MDC HET) 100.7 96.3 81.8 22 ~ CAPACITY FACTOR (USING DER NET) 101.8 97.3 82.2
23. UNIT FORCED OUTAGE RATE 0.0 3.6 6.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: April 7,1995 COMPLETED BY: O'.A ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe -Ne t )

3/01/94 845 3/02/94 '851 3/03/94 851 3/04/94 852 3/05/94 849 3/06/94 848 3/07/94 849 3/08/94 847 3/09/94 848 3/10/94 851 3/11/94 851 3/12/94 852 3/13/94 851 3/14/94 851 3/15/94 849 3/16/94 848 3/17/94 847 3/18/94 820 3/19/94 . 809 3/20/94 847 3/21/94 849 3/22/94 849 3/23/94 845 3/24/94 845 3/25/94 845 3/26/94 846 3/27/94 834 3/28/94 841 3/29/94 840 ~

3/30/94 841 3/31/94 840

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: April 7, 1995 COMPLETED BY: J.A. ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH No. Date Duration (Hours)

Reasona Method of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component & Corrective Action to Down ¹ Prevent Recurrence Unit 2 operated essentially at full power for the entire month.

F Forced Reason Method Exhibit G - Insuuctions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4)161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Adminisuative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain) 09tssr FFL

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT'ATE:

St. Lucie g2 4/7/95 COMPLETED BY0 J.A. Rogers TELEPHONE: (407) '68-4157 REPORT MONTH March 1995 Unit 2 operated at essentially full power for the entire month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no .challenges to the PORVs or safety valves during the report period.

A replacement copy of the February 1995 Operating Data Report for Unit 2 is included to correct errors reported on lines 14 and 23 as requested by NRC contractor Gary Roberts of INEL.

OPERATING DATA REPORT DOCKET HO 50 - 389 DATE 4/ 7/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERHAL POWER (MWT): 2700
4. HAHEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIHUM DEPENDABLE CAPACITY (GROSS HWE): 882
7. HAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRiCTED, IF ANY (NET HWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

'11. HOURS IN REPORT PERIOD: 672 1416 101353.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 597.4 1341.4 85609.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 593.3 1337.3 84204.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL EHERGY GENERATED (HWH) 1551360 3559881 218757422
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 513000 1180380 72634090
18. NET ELECTRICAL ENERGY GENERATED (HWH) 483376 1116480 68622360
19. UNIT SERVICE FACTOR 88.3 94.4 83.1
20. UNIT AVAILABILITYFACTOR 88.3 94.4 83.1
21. CAPACITY FACTOR (USING MDC NET) 85.7 94.0 81.6
22. CAPACITY FACTOR (USING DER HET) 86.7 95.0 82.0
23. UNIT FORCED OUTAGE RATE 11.7 5 ' 6.9
24. SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP: