ML20071A662: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =  
| project = TAC:49804
| stage = Request
| stage = Request
}}
}}

Latest revision as of 04:59, 31 May 2023

Application for Amend to License NPF-9,authorizing Transfer of Spent Fuel Between Unit 1 & Unit 2.Original Issuance of License for Unit 2 Should Include Subj Provision
ML20071A662
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/18/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
TAC-49804, NUDOCS 8302240302
Download: ML20071A662 (3)


Text

. .

. n Fh '/

Dmm POWER GOMFANY P.o. nox aatse -

cuawrrn, x.c. ass 4a HAL B. TUCKER ' TELEPHOmt v on re . (704) 373 4a3:

= = . .- l February 18, 1983 i

Mr.. Harold R. ')enton, Director Office of. Nuclear Reactor Regulation-U. S. Nuclear Regulatory Commission Washington, D. C.- 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station

' Docket No. 50-369

Dear Mr. Denton:

It is requested that Facility Operating License No. NPF-9 for McGuire Unit 1 be amended to authorize transfer of spent fuel between McGuire. Units 1 and 2.

Condition 2.B.(5) of the license currently states:

" Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility."

The word " facility" as used in the license refers to McGuire Unit 1. This wrding _

prohibits transfer of byproduct and special nuclear material from McGuire Unit 1 i: to Unit 2 and vice versa. It is believed that this restriction is unintentional since there is no justification for segregating the byproduct and special nuclear

[ material produced by the two units. Therefore, we propose that Condition 2.B.(5)

I of License No. NFP-9.be amended to read as follows:

" Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of McGuire Nuclear Station, Units 1 and 2."

It is also requesi;.ed that the original issuance of the license for McGuire Unit 2 l include this provision.

l

In addition to the aforementioned revision, it is requested that McGuire Unit 1 License No. NFP-9 be amended to incorporate the McGuire Unit 2 Appendix A, Technical l Specifications, into the McGuire Unit I license to supercede the existing Technical l Specifications. The Technical Specifications for McGuire Unit 2 have been developed so that they can be incorporated "as is" for McGuire Unit 1. It is requested that l- the new Technical Specifications be effective on Unit 1 immediately upon issuance f

8302240302 830213 0 PDR ADOCK 05000369 P PDR gtt f() l))

m -e ->e,----,-- + s e ci m gr-- - - . = . - - + , ----.+,s-, , .-we-s.. 3 v w-3-- - -!-y..m- . , , - v c--we-m- e- +v- M -+me--r-*+w=*-ew- -v --

e -- r 9 y-= y v v - --= --**-*W-

-i Harold R. Denton February 18, 1983 Page 2 of the Unit 2 license except that systems and components may be considered operable based upon the requirements in the current McGuire Unit 1 Technical Specifications until no later than:

(1) 31 days after the effective date, foi systems and components having new surveillance requirements which can be performed during reactor qperation, or (2) startup after the first refueling, for systems and components having new sarveillance requirements which cannot be performed during reactor operation.

This provision will allow sufficient time to successfully comply with all new surveillance requirements which are not required in the current Technical Specifications while not requiring a reactor shutdown solely to perform the n a surveillance.

This proposed amendment has been reviewed and determined not to involve any adverse safety or environmental impacts. Pursuant to 10 CFR 170.22, a check for $1,200 is enclosed.

Very truly yours.

i Hal B. Tucker REH:j fw cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Senior Resident Inspector McGuire Nuclear Station

. o o d

/

Mr. Harold R. Denton February 18, 1983 Page 3-HAL B. TUCKER being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign end fi.',o with the Nuclear Regulatory Commission this revision to the McGuira Nuclear Station Technical Specifications, Appendix A to License No. NPF-9; and that all statements and matters set forth therein are true and correct to the best of his knowledge, f

Ral B. Tucker, Vice President Subscribed and sworn to before me this 18th day of February, 1983 JL $ '

Notary Public ~

My Commission Expires:

September 20, 1984 f

t l

i 1

1 .

. - _ - - - . - _ - . . - . . - . . , - - - -