ML19310A399: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
1 Wisconsin Electnc mia coumr 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE WI 53201 June 10, 1980 Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calencar month of May 1980.
Very t.uly yours, C. W. Fay, Director Nuclear Power Department Attachments Copies to J. G. Keppler - NRC, Region III NRC Resident Inspector - Point Beach Nuclear Plant C. F. Riederer - PSCW 00%
l                                                                                      s
                                                                                      /!/
8 00617 0 W 3 R}}

Latest revision as of 09:34, 1 February 2020

Forwards Monthly Operating Repts for May 1980
ML19310A399
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/10/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19310A400 List:
References
NUDOCS 8006170473
Download: ML19310A399 (1)


Text

.

1 Wisconsin Electnc mia coumr 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE WI 53201 June 10, 1980 Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calencar month of May 1980.

Very t.uly yours, C. W. Fay, Director Nuclear Power Department Attachments Copies to J. G. Keppler - NRC, Region III NRC Resident Inspector - Point Beach Nuclear Plant C. F. Riederer - PSCW 00%

l s

/!/

8 00617 0 W 3 R