ML18017B467: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 15: | Line 15: | ||
| page count = 9 | | page count = 9 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:September ll, 1981 Mr.James P.O'Reilly Unit:ed States Nuclear Regulatory | {{#Wiki_filter:September ll, 1981 Mr. James P. O'Reilly Unit:ed States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 | ||
Commission | |||
Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 Dear Mr.O'Reilly: In reference to your letter of August 13, 1981, referring to RII: WPK 50-400/401/402/403/81-13, the attached is Carolina Power&Light Company's reply to the deficiencies | ==Dear Mr. O'Reilly:== | ||
identified | |||
in Appendix A.Our evaluation | In reference to your letter of August 13, 1981, referring to RII: WPK 50-400/401/402/403/81-13, the attached is Carolina Power & Light Company's reply to the deficiencies identified in Appendix A. Our evaluation of conditions relative to Appendix A, Item A.3 fail to indicate that a violation of procedures or commitments existed. Please consider the attached response information for possible reclassification of the item. It is considered that the corrective and preventive actions taken are satisfactory for resolution of items A.2,,A.4-A.7 (inclusive), B.l and B.2. It is considered that the corrective and .preventive actions taken for item A.l will be satisfactory for resolution of this item, once completed. | ||
of conditions | Thank you for your considerationin this matter. | ||
relative to Appendix A, Item A.3 fail to indicate that a violation of procedures | Yours very truly, Manager Corporate Quality Assurance ~;, | ||
or commitments | NJC/ps Attachment Sworn to and Subscribed before me this cc: Mr. J. A. Jones 11th day of September, 1981. | ||
existed.Please consider the attached response information | Notary Publ'c My commission expires June 5, 1984. | ||
for possible reclassification | '. 6...,, | ||
of the item.It is considered | 8110160608 811001 PDR *DOCK 05000400 PDR~yetteville Street o P. O. Box 1551 ~ Raleigh, N. C. 27602 | ||
that the corrective | |||
and preventive | udP I'. | ||
actions taken are satisfactory | C tlQ | ||
for resolution | . ~ | ||
of items A.2,,A.4-A.7 (inclusive), B.l and B.2.It is considered | zc a~+~ | ||
that the corrective | ~ip l I | ||
and.preventive | s r! c.-, | ||
actions taken for item A.l will be satisfactory | |||
for resolution | ERITY LEVEL V 5 VI'VIOLATIONS Conditions Reported: | ||
of this item, once completed. | A. 10 CFR 50, Appendix B, Criterion XIII as implemented by CPAL PSAR Sechion 1.8.5. 13 requires measures be established to control storage and preserva-tion of materials and equipment to prevent, damage or deterioration. The storage requirements f'r air handling and coil units are contained in a Bahnson letter dated April 11, 1979, received onsite April 13, 1979. ANSI | ||
Thank you for your considerationin | '45.2.2 "Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants (During the Construction Phase)" has been identified as the applicable standard for storage and handling. ANSI N45.2.2 prohibits the use of frayed or otherwise deteriorated rigging. ANSI N45.2.2 further requires the establishment of 5 program for the inspection of rigging including a system that will indicate acceptability. CPAL procedure MP-21, revision 0, "Inspection of Equipment and Rigging for General Lifting" is the controlling site inspection document for handling equipment and materials. | ||
this matter.Yours very truly, Manager Corporate Quality Assurance~;, NJC/ps Attachment | Material and equipment storage are controlled by CPAL procedures: AP-XIII-05, revision 10, "Material Storage", PGD-001, revision 20, "Material and Equipment Storage Requirements", PGD-002, revision 12, "Material Maintenance Requirements During Storage for SHNPP", and AP-XIII-07, revision 14, "In-Storage Inspection and Maintenance". MP-21 requires rigging materials to be period color coded. PGD-001 requires fabricated piping assemblies to be capped. PGD-002 requires general inspections for damaged or missing caps. PGD-002 further requires that tape be impervious to water and not subject to cracking or drying out if exposed to sunlight, heat or cold. | ||
AP-XlII-05 requires piping assemblies to be stored on dunnage. | |||
Contrary to the above, on July 7 to 10, 1981, measures were inadequate to | |||
expires June 5, 1984. | 'ontrol material and equipment storage and preservation in that the following conditions were noted: | ||
: 1. A number of safety related air handling and coil units we"e improperly stored out doors. This condition went unidentified from Apr March 1981. | |||
Street o P.O.Box 1551~Raleigh, N.C.27602 | il 1979 to | ||
udP I'.C.~zc a~+~ | : 2. Badly abraded and deteriorated cloth slings are used to or handle safety related materials and equipment. | ||
ERITY LEVEL V 5 VI'VIOLATIONS | lift, support | ||
Conditions | : 3. On safety related materials and equipment, there is no documented inspection program for nonlifting rigging. | ||
Reported: A.10 CFR 50, Appendix B, Criterion XIII as implemented | : 4. Cloth slings in the power block construction area are not period color coded. | ||
by CPAL PSAR Sechion 1.8.5.13 requires measures be established | : 5. Damaged pipe caps on numerous safety related piping assemblies. | ||
to control storage and preserva-tion of materials and equipment to prevent, damage or deterioration. | : 6. Numerous examples of deteriorated tape used to seal safety related piping assemblies. | ||
The storage requirements | : 7. Numerous examples of safety related and balance of plant stainless steel piping subassemblies off dunnage in contact with mud. | ||
f'r air handling and coil units are contained in a Bahnson letter dated April 11, 1979, received onsite April 13, 1979.ANSI'45.2.2"Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants (During the Construction | |||
Phase)" has been identified | I SePerity Level V & VI Vi tions Page Two B. 10 CFR 50, Appendix B, Criterion XVII as implemented by CP&L PSAR Section 1.8.5.17 requires sufficient records be maintained to furnish evidence of activities affecting quality. The records shall include qualifications of personnel. | ||
as the applicable | Contrary to the above, on July 10, 1981, sufficient records were not main-tained to furnish evidence of activities affecting quality in that: the training and qualifications records for several welding inspectors did not reflect required class-room training, and the training and qualification records for one welding inspector indicated one year of QC/QA related experience when in fact, the individual had only 10 months QC/QA related experience. | ||
standard for storage and handling.ANSI N45.2.2 prohibits the use of frayed or otherwise deteriorated | Denial or Admission and Reasons for Violation: | ||
rigging.ANSI N45.2.2 further requires the establishment | A. The violation is correct as stated. During March and April of 1979, through exchange of correspondence with the manufacturer of .the air handling units, CP&L assumed a posture that a quasi-agreement was in effect which permitted application of Level D storage for the units, except the associated motors would required Level B storage. CP&L proceeded on this basis with confidence that storage of the units and motors as planned, would provide adequate protection. Negotiations with the manufacturer in finalization of the storage program for the units, and appropriate revi-sions to the project procedures, failed to materialize. | ||
of 5 program for the inspection | 2.,& 4. | ||
of rigging including a system that will indicate acceptability. | ~ ~ The violation is correct as stated. Nylon slings were not placed under the inspection program due to limited use and difficulty in maintaining the inspection color code system. | ||
CPAL procedure MP-21, revision 0,"Inspection | : 3. The violation is, denied as stated. It is CP&L's interpretation that the requirement for a documented inspection program is directed at the equip-ment and rigging used in "handling" items as discussed in ANSI N45.2.2, paragraph 7, Handling. The standard defines handling as: "The act of physically moving items by hand or by mechanical machinery, not including transport modes." The NRC Inspector reported observing a piping assembly secured to a vehicle for transit with deteriorated holddown straps, contrary to ANSI N45.2.2 paragraph 7.4. 1; and cited the lack of a documented in-spection program for nonlifting rigging, contrary to paragraph 7.4 of the standard. CP&L agrees that the observed holddown straps are nonlifting equipment, but that they were being utilized in a transport mode versus handling (lifting) mode and as such, fall outside of the paragraphs cited. Inasmuch as the standard is found to be silent as to a documented inspection program for nonlifting rigging (sic), CP&L requests that this violation be rescinded. | ||
of Equipment and Rigging for General Lifting" is the controlling | 5 ' 6. & 7. The violations are correct as stated. Routine handling operations result in damage to pipe caps and piping subassemblies falling off dunnage; and deterioration of sealing tape are continually occurring conditions. Personnel error in failing to observe and correct unsatisfactory conditions as they occur result in this type of violation. | ||
site inspection | |||
document for handling equipment and materials. | ~ , Severity Level V & VI Violations-Page Three B. This part of the. violation is correct, but should be clarified as follows: | ||
Material and equipment storage are controlled | The required classroom training had been accomplished but docurrentation was not available for the inspector's review. | ||
by CPAL procedures: | The classroom training records in question are for those inspectors qualified for welding related inspection activities under revision number two of procedure CQA-1, Personnel Training and Qualification, dated March 16, 1981. During the period of the NRC inspection July 7-10, 1981) these records were in the locked file of the Melding QA/QC Specialist (supervisor) who was on vacation. The supervisor had started a review of all these training records prior to going on vacation and had elected to keep them in his file until the review was completed.. | ||
AP-XIII-05, revision 10,"Material Storage", PGD-001, revision 20,"Material and Equipment Storage Requirements", PGD-002, revision 12,"Material Maintenance | : 2. The violation is correct as stated. The QA/QC Inspector Qualification/ | ||
Requirements | Cer tification form (QA-49, revision. 4) in use at the time (May 27, 1980) the inspector in question was qualified as Stud iield Inspector, provided a blank to indicate "years in QA/QC related work". The QA/QC Specialist determin'ed that the candidate met the minimum experience requirement (six months), then rounded off to the nearest year (one) when he filled out the form. | ||
During Storage for SHNPP", and AP-XIII-07, revision 14,"In-Storage | Corrective Steps Taken and Results Achieved: | ||
Inspection | A. 1' The air handling units have been inspected, and no significant deterioration of quality was found. Additional protection, in the way of metal awnings, has been installed to minimize internal exposure to rain. The units will be moved to level B storage, or placed in an allowed subordinate storage level following evaluation and revision of project procedures. | ||
and Maintenance". | : 2. & 4. Nylon slings have been inspected and unacceptable slings rejected. In-spection color coding of the slings is being accomplished in accordance with project procedures. | ||
MP-21 requires rigging materials to be period color coded.PGD-001 requires fabricated | 5., 6. & 7. A general inspection and corrective work effor t resulted in replacing of damaged pipe caps, returning pipe to dunnage and non-contact with the ground, and replacing deteriorated sealing tape. | ||
piping assemblies | Records to document required classroom training are prescribed by procedure CQA-1 and are normally maintained in the QA/QC Unit administrative files. | ||
to be capped.PGD-002 requires general inspections | Supervisory review of the training records in question was completed and the records were placed in the file on July 16, 1981. | ||
for damaged or missing caps.PGD-002 further requires that tape be impervious | : 2. The QA/QC Inspector Qualification/Certification form for the inspector in question has been corrected to read "10 months" instead of "1 year". | ||
to water and not subject to cracking or drying out if exposed to sunlight, heat or cold.AP-XlII-05 | |||
requires piping assemblies | ( ~ | ||
to be stored on dunnage.Contrary to the above, on July 7 to 10, 1981, measures were inadequate | 'I | ||
in that the following conditions | ( ~ ~ | ||
were noted: 1.A number of safety related air handling and coil units we"e improperly | ~ | ||
stored out doors.This condition went unidentified | Ser verity Level V & VI 3 ations Page Four A. 1. An evaluation of similar storage aspects is being made. Areas found to be weak or inadequate will be corrected to ensure compliance with project commitments. | ||
from Apr il 1979 to | : 2. & 4. Nylon slings are now being inspected in accordance with project procedures. | ||
cloth slings are used to | Procedure MP-21, "Inspection of Equipment and Rigging for General Lifting", | ||
3.On safety related materials and equipment, there is no documented | is being revised to be more definitive in the inspection of nylon slings. | ||
inspection | A Procedure Deviation Notice was issued on September 4, 1981, to affect the above change until the procedure can be revised. | ||
program for nonlifting | 5., 6. & 7. Through correspondence and meetings with construction personnel, management has reemphasized the storage requirements and the need to be constantly aware of actions and conditions that lead to these types of violations; and the need to take prompt corrective action to restore compliance with project requirements. | ||
rigging.4.Cloth slings in the power block construction | B. 1. Supervisors have been instructed not to remove inspectors'raining records from the file for extended periods. This should ensure that these records are available for review on short notice. | ||
area are not period color coded.5.Damaged pipe caps on numerous safety related piping assemblies. | : 2. The QA/QC Inspector Qualification/Certification form (QA-49) was revised on May 8, 1981, to indicate "total months" experience instead of years, making it highly unlikely to have future problems of this type. | ||
6.Numerous examples of deteriorated | Date Mhen Full Compliance Mill be Achieved: | ||
tape used to seal safety related piping assemblies. | A 1. Full compliance will be achieved by December 1, 1981, at which time the evaluation of similar storage aspects will be complete. | ||
7.Numerous examples of safety related and balance of plant stainless steel piping subassemblies | : 2. & 4. Full compliance is considered to have been achieved on September 4, 1981, with the issuance and implementation of Deviation 1 to revision 3 of procedure MP-21. | ||
off dunnage in contact with mud. | 5., 6. & 7. Full compliance is considered to have been achieved on August 31, 1981.- | ||
I | B 1. & 2. Full compliance is considered to have been achieved on July 16, 1981. | ||
SePerity Level V&VI Vi tions Page Two B.10 CFR 50, Appendix B, Criterion XVII as implemented | |||
by CP&L PSAR Section 1.8.5.17 requires sufficient | L ~}} | ||
records be maintained | |||
to furnish evidence of activities | |||
affecting quality.The records shall include qualifications | |||
of personnel. | |||
Contrary to the above, on July 10, 1981, sufficient | |||
records were not main-tained to furnish evidence of activities | |||
affecting quality in that: the training and qualifications | |||
records for several welding inspectors | |||
did not reflect required class-room | |||
training, and the training and qualification | |||
records for one welding inspector indicated one year of QC/QA related experience | |||
when in fact, the individual | |||
had only 10 months QC/QA related experience. | |||
Denial or Admission and Reasons for Violation: | |||
A.The violation is correct as stated.During March and April of 1979, through exchange of correspondence | |||
with the manufacturer | |||
of.the air handling units, CP&L assumed a posture that a quasi-agreement | |||
was in effect which permitted application | |||
of Level D storage for the units, except the associated | |||
motors would required Level B storage.CP&L proceeded on this basis with confidence | |||
that storage of the units and motors as planned, would provide adequate protection. | |||
Negotiations | |||
with the manufacturer | |||
in finalization | |||
of the storage program for the units, and appropriate | |||
revi-sions to the project procedures, failed to materialize. | |||
2.,&4.~~The violation is correct as stated.Nylon slings were not placed under the inspection | |||
program due to limited use and difficulty | |||
in maintaining | |||
the inspection | |||
color code system.3.The violation is, denied as stated.It is CP&L's interpretation | |||
that the requirement | |||
for a documented | |||
inspection | |||
program is directed at the equip-ment and rigging used in"handling" items as discussed in ANSI N45.2.2, paragraph 7, Handling.The standard defines handling as: "The act of physically | |||
moving items by hand or by mechanical | |||
machinery, not including transport modes." The NRC Inspector reported observing a piping assembly secured to a vehicle for transit with deteriorated | |||
holddown straps, contrary to ANSI N45.2.2 paragraph 7.4.1;and cited the lack of a documented | |||
in-spection program for nonlifting | |||
rigging, contrary to paragraph 7.4 of the standard.CP&L agrees that the observed holddown straps are nonlifting | |||
equipment, but that they were being utilized in a transport mode versus handling (lifting)mode | |||
cited.Inasmuch as the standard is found to be silent as to a documented | |||
inspection | |||
program for nonlifting | |||
rigging (sic), CP&L requests that this violation be rescinded. | |||
5'6.&7.The violations | |||
are correct as stated.Routine handling operations | |||
result in damage to pipe caps and piping subassemblies | |||
falling off dunnage;and deterioration | |||
of sealing tape are continually | |||
occurring conditions. | |||
Personnel error in failing to observe and correct unsatisfactory | |||
conditions | |||
as they occur result in this type of violation. | |||
~, Severity Level V&VI Violations- | |||
Page Three B.This part of the.violation is correct, but should be clarified as follows: The required classroom training had been accomplished | |||
but docurrentation | |||
was not available for the inspector's | |||
review.The classroom training records in question are for those inspectors | |||
qualified for welding related inspection | |||
activities | |||
under revision number two of procedure CQA-1, Personnel Training and Qualification, dated March 16, 1981.During the period of the NRC inspection | |||
July 7-10, 1981)these records were in the locked file of the Melding QA/QC Specialist (supervisor) | |||
who was on vacation.The supervisor | |||
had started a review of all these training records prior to going on vacation and had elected to keep them in his file until the review was completed.. | |||
2.The violation is correct as stated.The QA/QC Inspector Qualification/ | |||
Cer tification | |||
form (QA-49, revision.4)in use at the time (May 27, 1980)the inspector in question was qualified as Stud iield Inspector, provided a blank to indicate"years in QA/QC related work".The QA/QC Specialist | |||
determin'ed | |||
that the candidate met the minimum experience | |||
requirement (six months), then rounded off to the nearest year (one)when he filled out the form.Corrective | |||
Steps Taken and Results Achieved: A.1'The air handling units have been inspected, and no significant | |||
deterioration | |||
of quality was found.Additional | |||
protection, in the way of metal awnings, has been installed to minimize internal exposure to rain.The units will be moved to level B storage, or placed in an allowed subordinate | |||
storage level following evaluation | |||
and revision of project procedures. | |||
2.&4.Nylon slings have been inspected and unacceptable | |||
slings rejected.In-spection color coding of the slings is being accomplished | |||
in accordance | |||
with project procedures. | |||
5., 6.&7.A general inspection | |||
and corrective | |||
work effor t resulted in replacing of damaged pipe caps, returning pipe to dunnage and non-contact | |||
with the ground, and replacing deteriorated | |||
sealing tape.Records to document required classroom training are prescribed | |||
by procedure CQA-1 and are normally maintained | |||
in the QA/QC Unit administrative | |||
files.Supervisory | |||
review of the training records in question was completed and the records were placed in the file on July 16, 1981.2.The QA/QC Inspector Qualification/Certification | |||
form for the inspector in question has been corrected to read"10 months" instead of"1 year". | |||
(~'I | |||
(~~~Ser verity Level V&VI 3 ations Page Four A.1.An evaluation | |||
of similar storage aspects is being made.Areas found to be weak or inadequate | |||
will be corrected to ensure compliance | |||
with project commitments. | |||
2.&4.Nylon slings are now being inspected in accordance | |||
with project procedures. | |||
Procedure MP-21,"Inspection | |||
of Equipment and Rigging for General Lifting", is being revised to be more definitive | |||
in the inspection | |||
of nylon slings.A Procedure Deviation Notice was issued on September 4, 1981, to affect the above change until the procedure can be revised.5., 6.&7.Through correspondence | |||
and meetings with construction | |||
personnel, management | |||
has reemphasized | |||
the storage requirements | |||
and the need to be constantly | |||
aware of actions and conditions | |||
that lead to these types of violations; | |||
and the need to take prompt corrective | |||
action to restore compliance | |||
with project requirements. | |||
B.1.Supervisors | |||
have been instructed | |||
not to remove inspectors'raining | |||
records from the file for extended periods.This should ensure that these records are available for review on short notice.2.The QA/QC Inspector Qualification/Certification | |||
form (QA-49)was revised on May 8, 1981, to indicate"total months" experience | |||
instead of years, making it highly unlikely to have future problems of this type.Date Mhen Full Compliance | |||
Mill be Achieved: A 1.Full compliance | |||
will be achieved by December 1, 1981, at which time the evaluation | |||
of similar storage aspects will be complete.2.&4.Full compliance | |||
is considered | |||
to have been achieved on September 4, 1981, with the issuance and implementation | |||
of Deviation 1 to revision 3 of procedure MP-21.5., 6.&7.Full compliance | |||
is considered | |||
to have been achieved on August 31, 1981.-B 1.&2.Full compliance | |||
is considered | |||
to have been achieved on July 16, 1981. | |||
L~ | |||
}} |
Latest revision as of 20:12, 3 February 2020
ML18017B467 | |
Person / Time | |
---|---|
Site: | Harris ![]() |
Issue date: | 09/11/1981 |
From: | Banks H CAROLINA POWER & LIGHT CO. |
To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML18017B466 | List: |
References | |
NUDOCS 8110160608 | |
Download: ML18017B467 (9) | |
Text
September ll, 1981 Mr. James P. O'Reilly Unit:ed States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303
Dear Mr. O'Reilly:
In reference to your letter of August 13, 1981, referring to RII: WPK 50-400/401/402/403/81-13, the attached is Carolina Power & Light Company's reply to the deficiencies identified in Appendix A. Our evaluation of conditions relative to Appendix A, Item A.3 fail to indicate that a violation of procedures or commitments existed. Please consider the attached response information for possible reclassification of the item. It is considered that the corrective and preventive actions taken are satisfactory for resolution of items A.2,,A.4-A.7 (inclusive), B.l and B.2. It is considered that the corrective and .preventive actions taken for item A.l will be satisfactory for resolution of this item, once completed.
Thank you for your considerationin this matter.
Yours very truly, Manager Corporate Quality Assurance ~;,
NJC/ps Attachment Sworn to and Subscribed before me this cc: Mr. J. A. Jones 11th day of September, 1981.
Notary Publ'c My commission expires June 5, 1984.
'. 6...,,
8110160608 811001 PDR *DOCK 05000400 PDR~yetteville Street o P. O. Box 1551 ~ Raleigh, N. C. 27602
udP I'.
C tlQ
. ~
zc a~+~
~ip l I
s r! c.-,
ERITY LEVEL V 5 VI'VIOLATIONS Conditions Reported:
A. 10 CFR 50, Appendix B, Criterion XIII as implemented by CPAL PSAR Sechion 1.8.5. 13 requires measures be established to control storage and preserva-tion of materials and equipment to prevent, damage or deterioration. The storage requirements f'r air handling and coil units are contained in a Bahnson letter dated April 11, 1979, received onsite April 13, 1979. ANSI
'45.2.2 "Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants (During the Construction Phase)" has been identified as the applicable standard for storage and handling. ANSI N45.2.2 prohibits the use of frayed or otherwise deteriorated rigging. ANSI N45.2.2 further requires the establishment of 5 program for the inspection of rigging including a system that will indicate acceptability. CPAL procedure MP-21, revision 0, "Inspection of Equipment and Rigging for General Lifting" is the controlling site inspection document for handling equipment and materials.
Material and equipment storage are controlled by CPAL procedures: AP-XIII-05, revision 10, "Material Storage", PGD-001, revision 20, "Material and Equipment Storage Requirements", PGD-002, revision 12, "Material Maintenance Requirements During Storage for SHNPP", and AP-XIII-07, revision 14, "In-Storage Inspection and Maintenance". MP-21 requires rigging materials to be period color coded. PGD-001 requires fabricated piping assemblies to be capped. PGD-002 requires general inspections for damaged or missing caps. PGD-002 further requires that tape be impervious to water and not subject to cracking or drying out if exposed to sunlight, heat or cold.
AP-XlII-05 requires piping assemblies to be stored on dunnage.
Contrary to the above, on July 7 to 10, 1981, measures were inadequate to
'ontrol material and equipment storage and preservation in that the following conditions were noted:
- 1. A number of safety related air handling and coil units we"e improperly stored out doors. This condition went unidentified from Apr March 1981.
il 1979 to
- 2. Badly abraded and deteriorated cloth slings are used to or handle safety related materials and equipment.
lift, support
- 3. On safety related materials and equipment, there is no documented inspection program for nonlifting rigging.
- 4. Cloth slings in the power block construction area are not period color coded.
- 5. Damaged pipe caps on numerous safety related piping assemblies.
- 6. Numerous examples of deteriorated tape used to seal safety related piping assemblies.
- 7. Numerous examples of safety related and balance of plant stainless steel piping subassemblies off dunnage in contact with mud.
I SePerity Level V & VI Vi tions Page Two B. 10 CFR 50, Appendix B, Criterion XVII as implemented by CP&L PSAR Section 1.8.5.17 requires sufficient records be maintained to furnish evidence of activities affecting quality. The records shall include qualifications of personnel.
Contrary to the above, on July 10, 1981, sufficient records were not main-tained to furnish evidence of activities affecting quality in that: the training and qualifications records for several welding inspectors did not reflect required class-room training, and the training and qualification records for one welding inspector indicated one year of QC/QA related experience when in fact, the individual had only 10 months QC/QA related experience.
Denial or Admission and Reasons for Violation:
A. The violation is correct as stated. During March and April of 1979, through exchange of correspondence with the manufacturer of .the air handling units, CP&L assumed a posture that a quasi-agreement was in effect which permitted application of Level D storage for the units, except the associated motors would required Level B storage. CP&L proceeded on this basis with confidence that storage of the units and motors as planned, would provide adequate protection. Negotiations with the manufacturer in finalization of the storage program for the units, and appropriate revi-sions to the project procedures, failed to materialize.
2.,& 4.
~ ~ The violation is correct as stated. Nylon slings were not placed under the inspection program due to limited use and difficulty in maintaining the inspection color code system.
- 3. The violation is, denied as stated. It is CP&L's interpretation that the requirement for a documented inspection program is directed at the equip-ment and rigging used in "handling" items as discussed in ANSI N45.2.2, paragraph 7, Handling. The standard defines handling as: "The act of physically moving items by hand or by mechanical machinery, not including transport modes." The NRC Inspector reported observing a piping assembly secured to a vehicle for transit with deteriorated holddown straps, contrary to ANSI N45.2.2 paragraph 7.4. 1; and cited the lack of a documented in-spection program for nonlifting rigging, contrary to paragraph 7.4 of the standard. CP&L agrees that the observed holddown straps are nonlifting equipment, but that they were being utilized in a transport mode versus handling (lifting) mode and as such, fall outside of the paragraphs cited. Inasmuch as the standard is found to be silent as to a documented inspection program for nonlifting rigging (sic), CP&L requests that this violation be rescinded.
5 ' 6. & 7. The violations are correct as stated. Routine handling operations result in damage to pipe caps and piping subassemblies falling off dunnage; and deterioration of sealing tape are continually occurring conditions. Personnel error in failing to observe and correct unsatisfactory conditions as they occur result in this type of violation.
~ , Severity Level V & VI Violations-Page Three B. This part of the. violation is correct, but should be clarified as follows:
The required classroom training had been accomplished but docurrentation was not available for the inspector's review.
The classroom training records in question are for those inspectors qualified for welding related inspection activities under revision number two of procedure CQA-1, Personnel Training and Qualification, dated March 16, 1981. During the period of the NRC inspection July 7-10, 1981) these records were in the locked file of the Melding QA/QC Specialist (supervisor) who was on vacation. The supervisor had started a review of all these training records prior to going on vacation and had elected to keep them in his file until the review was completed..
- 2. The violation is correct as stated. The QA/QC Inspector Qualification/
Cer tification form (QA-49, revision. 4) in use at the time (May 27, 1980) the inspector in question was qualified as Stud iield Inspector, provided a blank to indicate "years in QA/QC related work". The QA/QC Specialist determin'ed that the candidate met the minimum experience requirement (six months), then rounded off to the nearest year (one) when he filled out the form.
Corrective Steps Taken and Results Achieved:
A. 1' The air handling units have been inspected, and no significant deterioration of quality was found. Additional protection, in the way of metal awnings, has been installed to minimize internal exposure to rain. The units will be moved to level B storage, or placed in an allowed subordinate storage level following evaluation and revision of project procedures.
- 2. & 4. Nylon slings have been inspected and unacceptable slings rejected. In-spection color coding of the slings is being accomplished in accordance with project procedures.
5., 6. & 7. A general inspection and corrective work effor t resulted in replacing of damaged pipe caps, returning pipe to dunnage and non-contact with the ground, and replacing deteriorated sealing tape.
Records to document required classroom training are prescribed by procedure CQA-1 and are normally maintained in the QA/QC Unit administrative files.
Supervisory review of the training records in question was completed and the records were placed in the file on July 16, 1981.
- 2. The QA/QC Inspector Qualification/Certification form for the inspector in question has been corrected to read "10 months" instead of "1 year".
( ~
'I
( ~ ~
~
Ser verity Level V & VI 3 ations Page Four A. 1. An evaluation of similar storage aspects is being made. Areas found to be weak or inadequate will be corrected to ensure compliance with project commitments.
- 2. & 4. Nylon slings are now being inspected in accordance with project procedures.
Procedure MP-21, "Inspection of Equipment and Rigging for General Lifting",
is being revised to be more definitive in the inspection of nylon slings.
A Procedure Deviation Notice was issued on September 4, 1981, to affect the above change until the procedure can be revised.
5., 6. & 7. Through correspondence and meetings with construction personnel, management has reemphasized the storage requirements and the need to be constantly aware of actions and conditions that lead to these types of violations; and the need to take prompt corrective action to restore compliance with project requirements.
B. 1. Supervisors have been instructed not to remove inspectors'raining records from the file for extended periods. This should ensure that these records are available for review on short notice.
- 2. The QA/QC Inspector Qualification/Certification form (QA-49) was revised on May 8, 1981, to indicate "total months" experience instead of years, making it highly unlikely to have future problems of this type.
Date Mhen Full Compliance Mill be Achieved:
A 1. Full compliance will be achieved by December 1, 1981, at which time the evaluation of similar storage aspects will be complete.
- 2. & 4. Full compliance is considered to have been achieved on September 4, 1981, with the issuance and implementation of Deviation 1 to revision 3 of procedure MP-21.
5., 6. & 7. Full compliance is considered to have been achieved on August 31, 1981.-
B 1. & 2. Full compliance is considered to have been achieved on July 16, 1981.
L ~