{{#Wiki_filter:~" I REGULA INFORMATION DISTRlBUTIO YSTEM (RIDS)ACCESSION NHR: 8710220363 DOC.DATE: 87/10/15 NOTARIZED:
{{#Wiki_filter:~"     I REGULA       INFORMATION DISTRlBUTIO         YSTEM (RIDS)
NO FACIL:%0-400 Shearon Harv is Nuclear Poeer Plant>Unit ii Carolina AUTH.NAME AUTHOR AFFILIATION BAILEY>J.A.Georgia Power Co.BAILEY>J.A.Southern Company Servicesi inc.REC IP.NAME RECIPIENT AFFILIATION Document Contvol Bvanch (Document Control Desk)
ACCESSION NHR: 8710220363         DOC. DATE:   87/10/15     NOTARIZED: NO       DOCKET FACIL: %0-400 Shearon     Harv is Nuclear     Poeer Plant> Unit   ii Carolina   05000400 AUTH. NAME             AUTHOR AFFILIATION BAILEY> J. A.         Georgia Power Co.
BAILEY> J. A.         Southern Company Servicesi       inc.
REC IP. NAME         RECIPIENT AFFILIATION Document Contvol Bvanch       (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Pv ovides suplemental info re util 871015 emev gencg license amend request concerning diesel generator surveillance requirement 4.8.1.1.2.f.11.DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR Submittal:
Pv ovides suplemental info re util 871015 emev gencg license amend request concerning diesel generator surveillance requirement 4. 8. 1. 1. 2. f. 11.
General Distribution NOTES: Application fov permit renewal filed.DOCKET 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA HUCKLEYi B INTERNAL: ARM/DAF/LFMH NRR/DEST/CEB NRR/DEST/RSB NR S/ILRH REG FILE 01 EXTERNAL: EGhG HRUSKE>S NRC PDR COPIES LTTR ENCL 1 0 1 1 1 0 1 1 1 1 1 1 1 1 1 1 REC IP IENT ID CODE/NAME PD2-1 PD NRR/DEST/ADS NRR/DEST/MTB NRR/DQEA/TSB OGC/HDSi RES/DE/EIB LPDR NSIC CQP IES LTTR ENCL 5 5 1 1 1 1 1 1 1 0 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 18 1 tl ll t,I)I t Form 244 Company Correspondence CRK Carolina Power&Light Company USNRt,'=OS lPS1 OCT 22 A tO: OO" 8710220363 871016 PDR ADOCK 05000400'PDR OCT 1 6 fo87 United States Nuclear Regulatory Commission ATTENTION:
DISTRIBUTION CODE: A001D         COPIES RECEIVED: LTR         ENCL     SIZE:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 SUPPLEMENT TO REQUEST FOR EMERGENCY LICENSE AMENDMENT DIESEL GENERATOR SURVEILLANCE Gentlemen:
TITLE:   OR Submittal: General     Distribution NOTES: Application fov     permit renewal filed.                                 05000400 RECIPIENT         COPIES              REC IP IENT        CQP IES ID CODE/NAME       LTTR ENCL          ID CODE/NAME      LTTR ENCL PD2-1 LA                 1      0      PD2-1 PD              5    5 HUCKLEYi B               1      1 INTERNAL: ARM/DAF/LFMH               1      0      NRR/DEST/ADS          1    1 NRR/DEST/CEB             1      1      NRR/DEST/MTB          1    1 NRR/DEST/RSB                   1      NRR/DQEA/TSB          1    1 NR       S/ILRH         1      1      OGC/HDSi              1    0 REG   FILE     01      1      1      RES/DE/EIB            1    1 EXTERNAL: EGhG HRUSKE> S             1     1     LPDR                  1     1 NRC PDR                  1             NSIC                  1     1 TOTAL NUMBER OF COPIES REQUIRED: LTTR              21  ENCL    18
On October 15, 1987, Carolina Power l), Light Company submitted an emergency license amendment request regarding diesel generator Surveillance Requirement 4.8, 1.1.2.f.11.
 
The following discussion provides further information as to the emergency aspects of the situations The purpose of this outage is to perform surveillance testing that expires prior to the first refueling outage.The schedule was setup to perform testing on the B train first, which included B Emergency Diesel Generator, The Emergency Diesel Generator is now required to be declared operable in order to change safety trains to perform required testing on the A train components, including A Emergency Diesel Generator.
1 tl ll t,I
The work to be performed on the A Emergency Diesel Generator includes 1)a partial tear down and inspection, 2)performance of Maintenance Surveillance Tests, and 3)performance of Maintenace Periodic Tests (see attached list).In addition, surveillance testing requirements are now coming due on A train components.
  )I t
This includes required Technical Specification Surveillance Requirements as well as Environmental Qualification verification.
 
The outage is currently being delayed by the inability to declare the B diesel operable.Extending the outage will cost the Company approximately 4250,000 per day as estimated by our Systems Operations Department, ng.)I~i'l l1 4454IM~J oozed a got.">raoi I E This letter also documents a telephone conversation between members of NRR, Region II, and CPhL held on October i6, i987.Participants in this conversation included: Mr.Albert F.Gibson, Region II;Mrs Gus C.Lainas, NRR;Ms.Elinor G.Adensam, NRR;Mr.Bartholomew C.Buckley, NRR;Mr.D.M Carthy, CPhL;Mr.D.Tibbitts, CPhL;Mr.B.Clark, CPhL;Mr.A, Howe, CPhL;and Mr.M, Turkal, CPhL~At the conclusion of the call, Carolina Power h Light Company was granted an Enforcement Discretion regarding the operability of the B Emergency Diesel Generator until the subject license amendment can be processed'lease refer any further questions regarding this matter to Mr.David C.M Carthy at (9i9)836-7715.Yours very truly, R.A.Watson ice President Harris Nuclear Project cc: Mr.D.HE Brown (State of NC)Mr.B.C.Buckley (NRC)Dr.J.Nelson Grace (NRC-RII)Nr.G.F.Maxwell (NRC-SHNPP)  
Form 244 CRK                                  USNRt,'=OS Carolina Power & Light Company lPS1 OCT  22  A tO: OO" Company Correspondence 8710220363 871016 PDR    ADOCK 05000400' PDR OCT 1 6 fo87 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR EMERGENCY LICENSE AMENDMENT DIESEL GENERATOR SURVEILLANCE Gentlemen:
'4 bcc.'Mr.R.Mr.R.Mr.G.Mr.R.Mr.J.Mr.A.Mr.C.Mr.G.Mr.Co Mro M.Dr.J.H.Bassett T.Biggerstaff G.Campbell M.Coats M.Collins B.Cutter R.Dietz Forehand R.Gibson D.Hill D.E.Jeffries Mr.J.D.Mr.L.H.Mr.R.E.Mr.C.H.Mr.C.E.Mr.J.R.Mr.R.B.Mr.D.L.Mr.R.B.Mr.J.L.Mr.DE CD Mr.R.J.Kloosterman Martin Morgan Moseley Rose Sipp Starkey, Jr.Tibbitts Van Metre Willis Whitehead Zula INPO SHEEC Training Reference Library SHNPP Reg.Compliance "I 4 kq'~q~5,'
On  October 15, 1987, Carolina Power         l), Light Company   submitted an emergency    license amendment request regarding diesel generator Surveillance Requirement 4.8, 1.1.2.f.11. The following discussion provides further information as to the emergency aspects of the situations The purpose      of this outage is to perform surveillance testing that expires prior to the first refueling outage. The schedule was setup to perform testing on the B train first, which included B Emergency Diesel Generator,       The Emergency Diesel Generator is now required to be declared operable in order to change safety trains to perform required testing on the A train components, including A Emergency Diesel Generator.       The work to be performed on the A Emergency Diesel Generator includes 1) a partial tear down and inspection, 2) performance of Maintenance Surveillance Tests, and 3) performance of Maintenace Periodic Tests (see attached list).
DIESEL GEN.WORK PAGE 28 ACTIVITY NUMBER DESC INTER-PLAN'D START FINISH FACE ZONE ACTUAL START.DATE CREW PROC TF ID QTY DU NO.CODE 51PC010 T 16-OCT-87:16 16-OCT-87:16 NE191 512C010~T~.16-OCT-87<19 16-0CT-.87 c 19 NE191 NSTHO'I4A EDGA030 EDCA040 2'I I COLD COMPRESSION CHECKS N-S-RN-017 JACKET WTR SYS CLEARANCES L.O.SYSTEM CLEARANCES
In addition, surveillance testing requirements are now coming due              on A train components. This includes required Technical Specification Surveillance Requirements as well as Environmental Qualification verification.
~512C010 T 16-OCT-87:19 512COIO T 16"OCT-87:19 tlE191 I'16 OCT-87: 19'I 16-OCT-87:19 NEI91 ICE52 EDCAOBO FO SYSTEN CLEARANCE I 2 2 I 4 2 4 87ACNB'I'EGULATOR GLYPTOL T 16-OCT-87:19 16-OCT-87:RO 5'I 2CO I 0 SIRCOI 0 REMOVE GEN COVERS AND ASSIST NST-,E-0057
The outage is currently      being delayed by the inability to declare the            B diesel operable. Extending the outage will cost the Company approximately 4250,000 per day as estimated by our Systems Operations Department,
'RAIN L.O.-.SUMP TANK FOR HSTE0058 NSTEOSTA T 16-OCT-87:
 
'I 9'I 6-OCT-87:22 NE191 EDCAI I 0 512COI 0 T'I 6"OCT-87:20 16-OCT-87-23 NEI91 NSTN009A 87AFLJI 16"OCT-87:RI ICE52 16-OCT-87:22 ICE52 512COI 0 T 512COI 0 T INSTRUtlENT LEAK PI CAGE 16-0CT-87:21 16-OCT-87:R2 87AFLJ2 I'I 2 24 HSTE0578 JW HEATER INSP MSTI485A JW INSTR CALID I-8-RH-323 NSTM007A TURBO END PLAY N-8-RN-003 7 16-OCT-87-22 17-OCT-87:21 ELI76 512COI 0 512COI 0 16-OCT-87:22 17-OCT-87:10 ICESR 2 13 3'10 2 16-OCT-87:
ng.) I ~i' l 4454IM~J l1 oozed a got.">raoi I
22 17-OCT-87:
E
07 HE191 16-OCT-ST:
 
23 17-OCT-87:
This letter also  documents  a telephone conversation between members of NRR, Region  II, and CPhL  held  on October i6, i987. Participants in this conversation included: Mr. Albert F. Gibson, Region II; Mrs Gus C.
OR tlE191 51RCOI 0 T 512CO'I 0.T AIR BUTTERFLY VALVES N-8-RN-031 NSTN021A NSTN022A CENERATOR PEDESTAL BRG OIL CHANCE N-S-RN-032 CRANKSHAFT DEFL N-5-RH"OII T 16-OCT-87:
Lainas, NRR; Ms. Elinor G. Adensam, NRR; Mr. Bartholomew C. Buckley, NRR; Mr. D. M Carthy, CPhL; Mr. D. Tibbitts, CPhL; Mr. B. Clark, CPhL; Mr. A, Howe, CPhL; and Mr. M, Turkal, CPhL     ~ At the conclusion of the call, Carolina Power h Light Company was granted an Enforcement Discretion regarding the operability of the B Emergency Diesel Generator until the subject license amendment can be processed'lease refer any further questions regarding this matter to Mr. David C. M Carthy at (9i9) 836-7715.
23 17-OCT-87:
Yours very truly, R. A. Watson ice President Harris Nuclear Project cc: Mr. D. HE Brown (State of NC)
OR HEI 91 2 4 512COI 0 512COI 0 7 16-OCT-87:24 17-OCT-87:03 NEI9'I 2.4 2 24 NSTNOIIA MSTE060A'GEN CLEANING AND INSP 18-OCT-87:
Mr. B. C. Buckley (NRC)
02 EL 176 5'I2CO'10 512COI 0 512CO I 0 512CO I 0 512COI 0 17-OCT-87:03 17-OCT-87:03 MSTNOIOA CYL LINER VISUAL INSPECTION 2 12 2 12 17-OCT-87:
Dr. J. Nelson Grace (NRC-RII)
14 NE191 NSTN016A FUEL INJECTOR INSP N"8-RN-016 NST1497A TEMP TRIP GALS I-8-RN-335 NSTtl026A tlANUAL VLV'INSP N" S-RN-039 NSTHOO I A INTERCOOLER INSP N-8-RN-001 17"OCT-87:
Nr. G. F. Maxwell (NRC-SHNPP)
03 17-OCT-87:
 
14 tlE 191 I 17-OCT-87:
'4 bcc.'Mr. R. H. Bassett    Mr. J. D. Kloosterman  INPO Mr. R. T. Biggerstaff Mr. L. H. Martin      SHEEC Training Mr. G. G. Campbell    Mr. R. E. Morgan        Reference Library Mr. R. M. Coats      Mr. C. H. Moseley      SHNPP Reg. Compliance Mr. J. M. Collins     Mr. C. E. Rose Mr. A. B. Cutter      Mr. J. R. Sipp Mr. C. R. Dietz      Mr. R. B. Starkey, Jr.
04 17-0CT-.87:
Mr. G. Forehand      Mr. D. L. Tibbitts Mr. Co R. Gibson      Mr. R. B. Van Metre Mro M. D. Hill        Mr. J. L. Willis Dr. J. D. E. Jeffries Mr. DE CD Whitehead Mr. R. J. Zula
'I 5 ICE52 2 12 2 8 T 17-OCT-87:04 17-OCT-87:11 NE191 5IRCOIO T 17-OCT-87:08 17-0CT-87:15 NEI91 4 8 CRANKCASE VISUAL INSP tl-S-RN-009 512COI 0 T 16-OCT-87:20 16-OCT-87:23 NE191 173 176 173 217 238 210 183 238 238 176 234 226 183 214 183 225 203 MUST IIUS+MUST E NUST MUST NUST NUST MUST MUST NUST NUST MUST NUST NUST NUST 4
 
DIESEL GEN WORK PACE 29 ACTIVITY NUMBER DESC INTER-PLAN'D START FINISH--CREW PROC TF IFACE ZONE ACTUAL START F DATE ID OTV DU.NO.CODE tlSTtl017A START AIR SYSTEM N-S-RM-tl025 NSTNOI9A ROCKER ARN INSPECTION N-8-RN-027 NSTM023A COVERNOR COUPLINC REPLACEMENT NSTI487A LO PRESSURE INSTR CALIB 86BTYAI AIR START TOROUE STALWQI JW HTR INSP NSTEOSBA LO HTR INSP E-8-RM-036 87ALWQIA TURBO JACKET IITR CASKETS EDCAIOO INSTALL CEN COVERS NST1483A LO INSTR CAL I-8-RN-381 EDCA060 REFILL JACKET IITR SYSTEM MST1493A F.O.INSTR GALS I-8-RN-327 EDCAIRO REFILL LO SUMP NSTtl009B NST1499A MSTI489A NST1479A NST1491A tlST148 I A CONPLETE NST N-009 CLOSEOUT CRANKCASE CRANKCASE PRESSURE I-8-RN"337 THERtlOCOUPLES I-S-RM-327 ECP PNEU PRESSS CAL I-8-RN-317 ECPINSP CLEANINC L.O.SUIIP LEVEL NST1495A EDC VIB SW TEST 6 CAL NSTN0198 EDC COMPRESSION CHKS 512C010 512col 0 sl ecol o 512colo 512COIO Sl ecol 0 51 ecol 0 512COIO 512C010 512colo SIRC010 512C010 512COI 0 512col 0 51RCOI 0 5'I RCO I 0 slesolo 512colo 51RCOIO 51RCOIO 512C010 NSTI541A LO JW HTR THERMO CALIB I-8-RM-339 SIRCOI0 T 17-OCT-87:II T 17-OCT-87:15 T 17-OCT-87:15 T 17-OCT-87:16 T 17-OCT-87:17 17-OCT-87:
    "I 4 kq'
16 17-OCT-87:22 17-OCT-87:18 17-OCT-87:19
~ q
~'1 18-OCT-87:04 I CE52~2 6 NE19 I 4 8 NE191 NEI91 e ICE52 2 12 T 17-OCT-87:20 17-OcT-87:ee T 18-OCT-87:02 T'8-OCT-87:03 T 18 OCT-87:05 T 18"OCT-87:08 T 18-OCT-87:13 T 18-OCT-87:R2 T" 18-OCT-87:22 T 18-OCT-87:84 T 19-'OCT-87:Ol T 19-OCT-87:06 T 20-OCT-87:02 T 20-OCT-ST:10 eo-ocT-87:18 T Ro-OCT-87:18 18-OCT-87:01 IS"OCT-87:21 18"OCT-87:07 18-OCT-8T:06 18-OCT-87tlR 18-OCT-87:09 18-OCT-87'-24
~ 5,'
'19-OCT-87:O'I 18-OCT-ST:23 19-OCT-87:05 19-OCT-87:IR RO-OCT-.87-01 20-OCT-87:09 20-OCT-87:13 el-OCT-87:41 20-OCT-S7:21 NEI91 ELI76 NE191 NE191 I CE5R NE191 I CE52 2 6 2 24 2 6 2 4 8 8 2 12 tlE191 I 4 NE191 I CE52 lcEse ICE52 2 R 2 6 2 le e eo ICESR 2 8 ICE52 ICES2 NEI91 e 8'T 17-0CT-.87:19 17-OCT-.ST:20 NEI91'2 176 el 4 R16 176 216 203 203 206 176 203 176 187 151 151 176 151 151 151 151 155 MUST NUST NUST NUST NUST E NUST MUST MUST MUST NUST MUST MUST MUST NUST NUST~>I~
 
DIESEL GEN IJORK PAGE 30 ACTIVITY NUMBER DESC 1NTER-FACE PLAN'D START ZONE ACTUAL START F 1NI SH'REII PROC TF DATE ID QTY DU NO.CODE T 28-OCT-87:
DIESEL GEN.WORK PAGE 28 ACTIVITY                                                 INTER-             PLAN'D START             FINISH           CREW                PROC TF NUMBER                          DESC                    FACE       ZONE ACTUAL START           . DATE             ID     QTY     DU NO.         CODE NSTHO'I4A      COLD COMPRESSION      CHECKS            51PC010        T     16-OCT-87:16 16-OCT-87:16               NE191       2      'I      173      MUST N-S-RN-017 EDGA030      JACKET WTR SYS CLEARANCES                512C010     ~
07 28-OCT-87:
T ~
07 NE191.2 I T 28-0CT-87:
                                                                            . 16-OCT-87 19 16-0CT-.87 c 19
'I 0 28-OCT-87:
                                                                                          <                            NE191         I              176 EDCA040     L.O. SYSTEM CLEARANCES       ~
10 NE191.I I T 28-OCT-87:10 88-OCT-87:10 NEI91 I I T 28-OCT-87:10 28-OCT-87-10 ME191 EDG COMPRESSION CHECKS N-8-RN-018 512CO I I NSTM014C EDGB030 J.W SYSTEN CLEARANCES 512CO I'I 51 2C01'I 512C011 EDGB080 F.O.SYS CLEARANCE EDGB040 L.O.SYSTEN CLEARANCE 87ACNEI REGULATOR GLYPTOL NSTE060C REMOVE GENERATOR COVERS 2 512C011 T 28-OCT-87:10 28 OCT-87: 11 1CE52 T 28-OCT-87:
512C010         T     16-OCT-87:19 16 OCT-87:             19 tlE191       I
I 0 28-OCT-87:
                                                                                                                                      '            173
13 NEI 91 2 512COII 512COII ME ASSIST NSTE058 DRAIN LO SUHP TANK CRANKCASE VISUAL HSTE058C MSTN009C T'8-OCT-87:
                                                                                                              'I EDCAOBO      FO SYSTEN CLEARANCE                      512COIO        T    16"OCT-87:19 16-OCT-87:19               NEI91                       217 87ACNB'I 'EGULATOR       GLYPTOL                     5'I 2CO I 0    T     16-OCT-87:19 16-OCT-87:RO                 ICE52        I     2        238 NSTEOSTA      REMOVE GEN COVERS AND NST-,E-0057 ASSIST      SIRCOI 0        T    16-OCT-87:    'I 9 'I   6-OCT-87:22     NE191       2              210      IIUS+
11 28-OCT-87:
EDCAI I 0           L.O. .SUMP TANK FOR HSTE0058
14 NE191'I 4 512COI I T 28-OCT-87:11 28-OCT-87:14 NE191 2 0 60 NUST E MUST MUST HUST NSTNOOTC NSTtl022C IB-LB TURBO ROTOR END PLAY N-S-RH-004 GEN PED BRG 01L CHG MSTNO'I OC CYL L1NER VISUAL 87ACGUI A1R F1LTER LEAK NSTE057C J.II.HTR 1NSPECT1ON E-8-RN-035 NST1486C J.W.1NSTR CAL 512C011 T 28-OCT-87:
                            'RAIN 512COI 0       T     'I 6 "OCT-87:20   16-OCT-87-23         NEI91         I    4 NSTN009A     CRANKCASE VISUAL INSP        tl-S-RN-009  512COI 0        T    16-OCT-87:20 16-OCT-87:23                NE191        2      4        183      MUST 87AFLJI      INSTRUtlENT LEAK                        512COI 0       T     16-0CT-87:21 16"OCT-87:RI                ICE52                      238          E 87AFLJ2     PI  CAGE                                  512COI 0        T    16-OCT-87:R2 16-OCT-87:22                ICE52      I               238
11 28-OCT-87:
                                                                                                                              'I HSTE0578     JW HEATER   INSP                         512COI    0    7    16-OCT-87-22 17-OCT-87:21               ELI76       2    24                  NUST MSTI485A      JW  INSTR CALID    I-8-RH-323          512COI   0           16-OCT-87:22 17-OCT-87:10                 ICESR       2     13       176      MUST NSTM007A      TURBO END PLAY      N-8-RN-003          51RCOI 0        T    16-OCT-87: 22 17-OCT-87: 07             HE191       3    '10                  NUST NSTN021A      AIR BUTTERFLY VALVES N-8-RN-031          512CO'I 0    . T    16-OCT-ST: 23 17-OCT-87:           OR   tlE191       2              234      NUST NSTN022A     CENERATOR PEDESTAL BRG         OIL CHANCE 512COI 0        T     16-OCT-87: 23 17-OCT-87:           OR   HEI 91       2     4       226      MUST N-S-RN-032 NSTNOIIA      CRANKSHAFT DEFL      N-5-RH"OII          512COI   0     7     16-OCT-87:24 17-OCT-87:03               NEI9'I       2. 4       183      MUST MSTE060A     'GEN CLEANING AND INSP                     5'I2CO'10            17-OCT-87:03 18-OCT-87: 02               EL 176       2    24                  NUST MSTNOIOA      CYL LINER VISUAL INSPECTION              512COI 0             17-OCT-87:03 17-OCT-87: 14              NE191        2     12                 NUST NSTN016A     FUEL INJECTOR INSP N"8-RN-016             512CO I 0            17"OCT-87: 03 17-OCT-87: 14             tlE 191     2    12        214      MUST NST1497A      TEMP  TRIP GALS I-8-RN-335              512CO I 0            17-OCT-87: 04 17-0CT-.87: 5        'I I
22 NE191 2 12 512C011 512COII.'512CO I I 512C011 T 28-OCT-87:12 28"OCT-87:13 lCE52 I 2 T RS-OCT-87:13 29-0CT-87:IR EL176 2 24 T 28-OCT-87:13 29-OCT-ST:O'I 1CE52 2 13 T RS-OCT-87 13 28-OCT-87; 15-NE191 3 3 512CO I I'28-OCT-87:
ICE52       2     12       183      NUST NSTtl026A    tlANUAL VLV 'INSP N" S-RN-039            512COI 0        T     17-OCT-87:04 17-OCT-87:11               NE191       2      8        225      NUST NSTHOO I A    INTERCOOLER INSP      N-8-RN-001        5IRCOIO         T     17-OCT-87:08 17-0CT-87:15               NEI91       4     8       203      NUST
14 28-OCT-87:
 
17, tlE191 2 60 35 0 16 40 NUST MUST NUST NUST 37 HUST NSTE060D GEN CLEAN 1NSPECT MSTNOIIC CRANKCASE VDEFL NSTNO'I6C FUEL INJ 1NSP MPTN026C MANUAL VLV 1NSPECTION NST1498C TEMP TR1P CAL 512COI I 512COII 512CO I I 5IRCOI I 28-DCT-87:
4 DIESEL GEN  WORK PACE  29 ACTIVITY                                            INTER-         PLAN'D START          FINISH -   -   CREW                PROC TF NUMBER                      DESC                  IFACE    ZONE ACTUAL START            F DATE            ID    OTV      DU .NO.          CODE NSTI541A    LO JW HTR THERMO      CALIB I-8-RM-339  SIRCOI0      T     17-OCT-87:II 17-OCT-87:         16    I CE52      ~ 2    6        176       MUST tlSTtl017A  START AIR SYSTEM      N-S-RM-tl025      512C010      T    17-OCT-87:15 17-OCT-87:22            NE19  I      4    8        el 4      NUST NSTNOI9A   ROCKER ARN INSPECTION       N-8-RN-027 512col    0  T    17-OCT-87:15 17-OCT-87:18            NE191          e            R16      NUST NSTM023A    COVERNOR COUPLINC REPLACEMENT          sl ecol  o  T    17-OCT-87:16 17-OCT-87:19            NEI91                                  NUST
15 29-OCT-87-'4 ELI76 8 24 T 28-OCT-87:15 28-OCT-87:18 NE191 2 T'8-OCT-87:16 29-OCT 87: 03 NEI91 2'12 T 28-OCT-87:18 29-OCT-87iOI NE191 2'512COI I T 28"OCT-87:
                                                                                                      '1
19 29-OCT-87:
                                                                                                    ~
06,1CE52 2 12 40 9 MUST NUST NUST ,.MUST NSTN009D NSTN019C COMPLETE MST-N009 CRANKCASE CLOSEOUT ROCKER ARN INSPECT1ON N-S"RN"028 NST1502C LO/JU HTR THERtIOSTAT CAL 512COI I 5IRCOI I 512CO I I T T r 28-OCT-87:23 29"OCT-87:02 29-OCT-87:02 29-OCT-87:07 tlE19 I ICE52 2 28-OCT-87:
NSTI487A    LO PRESSURE   INSTR CALIB              512colo      T    17-OCT-87:17 18-OCT-87:04            ICE52        2  12        176 86BTYAI  AIR START TOROUE                        512COIO      T    17-0CT-.87:19 17-OCT-.ST:20          NEI91    '        2        216 STALWQI  JW HTR  INSP                          Sl ecol   0 T    17-OCT-87:20 18-OCT-87:01            NEI91          2    6        203 NSTEOSBA    LO HTR INSP    E-8-RM-036              51  ecol  0        17-OcT-87:ee    IS"OCT-87:21        ELI76          2  24                  NUST 87ALWQIA    TURBO JACKET IITR CASKETS              512COIO      T    18-OCT-87:02 18"OCT-87:07            NE191          2    6        203          E EDCAIOO  INSTALL CEN COVERS                      512C010      T '8-OCT-87:03        18-OCT-8T:06        NE191          2   4        206 NST1483A    LO INSTR CAL    I-8-RN-381              512colo      T     18 OCT-87:05    18-OCT-87tlR        I CE5R        8  8         176      NUST EDCA060  REFILL JACKET IITR SYSTEM              SIRC010      T     18"OCT-87:08 18-OCT-87:09            NE191                        203 MST1493A    F.O. INSTR    GALS  I-8-RN-327        512C010      T     18-OCT-87:13 18-OCT-87'-24          I CE52        2  12        176      MUST EDCAIRO  REFILL LO    SUMP                      512COI 0    T     18-OCT-87:R2 '19-OCT-87:O'I          tlE191          I  4        187 NSTtl009B  CONPLETE NST N-009 CLOSEOUT            512col    0  T "
19 28-OCT-87:20 tlE191 2 2 37 NUST MUST HUST V 1 DIESEL CEN WORK PACE 31 ACTIVITY NUMBER DESC INTER-FACE PLAN'D START.FINISH ZONE ACTUAL START'ATE CREW ID QTY.DU PROC TF NO.CODE NSTN021C AIR BUTTERFLY 86BTXZI AIR START VLV TORQUE NSTNO)7C AIR START INSPECTION NPTNOOIC IB"RB TORBO INSPECTION 87APPJID CAN COVER OIL LEAK NST1500 MSTE058D CRANKCASE PS CAL L.O.HTR INSP NST1488C LO PRESSURE INST CAL 87APPJIC 87ADLZ)HUNPHREY VLV LEAK WORK ORDER;NST1480C ECP PNEU PS CAL 86ARHI I LOCKPLATE EDCB220 INSTALL CEN COVERS NST148<C LO INSTRUMENT CAL NSTNOOIC MSTNOOID IB-LB INTERCOOLER INSPECTION'B-RB INTERCOOLER INSP N"S-RN-002 NSTN023C 87AFATI COV COUPLINC REPLACEMENT N-S-Rtl-060 L.O.COUPLING STAXPXI J.W.CASKETS MSTI492C" ECP INSP AND CLEAN NST1482C LO SUHP LEVEL MST I<9<C F.0.INST CAL'-8-RN-322 29-OCT-87:
18-OCT-87:22 18-OCT-ST:23            NE191          2  R        151      MUST CRANKCASE NST1499A    CRANKCASE PRESSURE I-8-RN"337          51RCOI    0  T     18-OCT-87:84 19-OCT-87:05            I CE52        2  6        151      MUST MSTI489A    THERtlOCOUPLES    I-S-RM-327            5'I RCO I 0  T    19-'OCT-87:Ol 19-OCT-87:IR          lcEse          2  le        176      NUST NST1479A    ECP PNEU PRESSS      CAL  I-8-RN-317    slesolo      T    19-OCT-87:06 RO-OCT-.87-     01     ICE52          e  eo        151      MUST NST1491A    ECPINSP CLEANINC                        512colo      T    20-OCT-87:02 20-OCT-87:09            ICESR          2  8        151      MUST tlST148 I A L.O. SUIIP LEVEL                      51RCOIO      T    20-OCT-ST:10 20-OCT-87:13            ICE52                        151      MUST NST1495A    EDC  VIB  SW  TEST 6 CAL                51RCOIO          eo-ocT-87:18 el-OCT-87:41            ICES2          e  8         151      NUST NSTN0198    EDC COMPRESSION      CHKS              512C010      T   Ro-OCT-87:18 20-OCT-S7:21            NEI91     '                 155      NUST
03 29-OCT-87:
                                                                                    ~ >
04 NE191 2 2 512COI I r 512CO I 1.NE 191 4 8 NE19)-3 16 T 29-OCT-87-04
I ~
.29-0CT-87:)1 29-OCT-87:20 512COII'29-OCT-87'-05 29-OCT-87:
 
06 29-OCT-87:
DIESEL GEN IJORK PAGE   30 ACTIVITY NUMBER                   DESC 1NTER-FACE PLAN'D START ZONE ACTUAL START F 1NI SH DATE
09 NE191 2 4 512COII 512COII 5)2C011 512CO'I'I 29-0CT-87:12 ICE52 2 6 T 29-OCT-87:07 30-0CT-87:06 29-0CT-87:19 T 29-OCT-87:07 T 29-OCT-87:08 EL 176 2 24 ICESR tlE191 R l2 2 8 I I 512COII.T 29-OCT-87:10 29-OCT-87:I7 29-0CT-87:12 29-OCT-87:13 29-OCT-S7:12 NE191 512C011 5'I2C01'I 512COII 30-0CT-87:08 29-OCT-87:16
                                                                                                        'REII ID    QTY PROC TF DU NO.           CODE NSTM014C  EDG COMPRESSION    CHECKS  N-8-RN-018    512CO I I      T     28-OCT-87: 07 28-OCT-87: 07       NE191     . 2     I                 NUST EDGB030  J.W SYSTEN CLEARANCES                    512CO I  'I    T     28-0CT-87: 'I 0 28-OCT-87:   10   NE191   . I     I       0 EDGB080  F.O. SYS CLEARANCE                    51 2C01  'I    T    28-OCT-87:10 88-OCT-87:10         NEI91     I     I EDGB040  L.O. SYSTEN CLEARANCE                  512C011        T     28-OCT-87:10 28-OCT-87-10         ME191 87ACNEI  REGULATOR GLYPTOL                        512C011        T    28-OCT-87:10 28 OCT-87:      11    1CE52          2      60            E NSTE060C   REMOVE GENERATOR COVERS                 512COII        T     28-OCT-87: I0  28-OCT-87: 13     NEI 91     2                       MUST HSTE058C  ME   ASSIST NSTE058 DRAIN LO SUHP       512COII        T   '8-OCT-87:   11   28-OCT-87: 14     NE191       'I   4                   MUST TANK MSTN009C  CRANKCASE VISUAL                        512COI I       T     28-OCT-87:11 28-OCT-87:14         NE191       2                       HUST MSTNO'I OC CYL L1NER VISUAL                       512C011          T    28-OCT-87:      28-OCT-87: 22 11                    NE191      2  12      37          HUST 87ACGUI  A1R F1LTER LEAK                        512C011         T     28-OCT-87:12 28"OCT-87:13          lCE52      I    2       60 NSTE057C  J. II. HTR 1NSPECT1ON  E-8-RN-035      512COII          T     RS-OCT-87:13 29-0CT-87:IR         EL176       2 24       35          NUST NST1486C  J.W. 1NSTR CAL                      .'512CO I I        T    28-OCT-87:13 29-OCT-ST:O'I         1CE52     2   13       0          MUST NSTNOOTC  IB-LB  TURBO ROTOR END PLAY            512C011          T     RS-OCT-87 13 28-OCT-87; 15 NE191       3   3       16          NUST N-S-RH-004 NSTtl022C  GEN PED BRG  01L  CHG                  512CO
'29-OCT-87:20 2 20 ICE52 ELI76.I-2 T 29-0CT-87:15 T 29-OCT-87:17 512C011 NEI9 I 2 R 8 2 T 29-0CT-,87:20 5)2CO'll 30-OCT-87:03 ICE52 T 29-0CT-87:
                                                                '        28-OCT-87: 14 28-OCT-87: 17, tlE191 I I                                                          2           40         NUST NSTE060D   GEN CLEAN 1NSPECT                       512COI    I            28-DCT-87: 15 29-OCT-87-'4       ELI76       8 24                   MUST MSTNOIIC  CRANKCASE VDEFL                        512COII          T   28-OCT-87:15 28-OCT-87:18         NE191       2                       NUST NSTNO'I6C  FUEL INJ 1NSP                          512CO I I        T '8-OCT-87:16       29-OCT 87: 03     NEI91       2 '12                   NUST MPTN026C  MANUAL VLV 1NSPECTION                  5IRCOI I        T    28-OCT-87:18 29-OCT-87iOI         NE191       2'           40 NST1498C  TEMP TR1P  CAL                        512COI I         T   28"OCT-87: 19 29-OCT-87: 06,1CE52             2 12         9       ,. MUST NSTN009D   COMPLETE MST-N009 CRANKCASE             512COI I        T    28-OCT-87: 19 28-OCT-87:20        tlE191      2    2                  NUST CLOSEOUT NSTN019C  ROCKER ARN INSPECT1ON N-S"RN"028       5IRCOI   I     T   28-OCT-87:23 29"OCT-87:02         tlE19 I                  37          MUST NST1502C  LO/JU  HTR THERtIOSTAT CAL            512CO  I  I      r    29-OCT-87:02 29-OCT-87:07         ICE52       2                       HUST
R I 29-OCT-87:
 
R<t)E I 91 512CO I'I 512CO)I 5IRC011 512CO'I I T 30-OCT-87:
V 1
01 30-OCT-87:
 
04 IIE191 2 7 30-OCT-87:04 30-OCT-87:13 ICE52~2 10 I 2 2, 6 2 8 2 T" 30-OCT-87:05 30-0CT-87:08 NEI9 I HEI 91 T 30-0CT-87:07 30"OCT-87:10 512COI I 5)RCOI)T 30-0CT-87:
DIESEL CEN     WORK PACE 31 ACTIVITY                                                     INTER-             PLAN'D START .
09 30-,0CT-87:
NUMBER                      DESC                            FACE        ZONE ACTUAL START     'ATE FINISH        CREW ID       QTY . DU PROC NO.
)4'E191 30-OCT-87:09 30-OCT-87:
TF CODE NSTN021C     AIR BUTTERFLY                                   512COII        , T '9-OCT-87:02 29-OCT-87:05        MEI91          2                40      MUST 86BTXZI    AIR START VLV TORQUE                            512COI I              29-OCT-87: 03 29-OCT-87: 04  NE191          2      2        37          E r
I6 ICE52 512C011 512C011 30-OCT-87:11 30-0CT-87:14 ICE52 512COII , T'9-OCT-87:02 29-OCT-87:05 MEI91 2 40 37 MUST E 37 NUST 40 MUST MUST 32 NUST 37 NUST 29 29 0 NUST MUST NUST MUST 3 MUST=9 NUST.7 NUST 1 DIESEL GEN DORK PAGE 32 ACTIVITY NUllBER'ESC 1NTER-PLAN'D START FACE ZONE ACTUAL START FINISH DATE CREII 1D OTY OU PROC TF NO.CODE c IISTI 490C THERHOCOUPLE
NSTNO)7C    AIR START INSPECTION                            512CO I 1.       T    29-OCT-87-04 .29-0CT-87:)1    NE 191          4      8        37      NUST NPTNOOIC    IB"RB TORBO INSPECTION                         512COII      '       29-OCT-87'-05 29-OCT-87:20    NE19)    -     3      16 87APPJID    CAN COVER  OIL LEAK                            512COII              29-OCT-87: 06 29-OCT-87: 09  NE191          2      4        40 NST1500    CRANKCASE PS CAL                               512COII          T    29-OCT-87:07 29-0CT-87:12      ICE52          2       6                MUST MSTE058D    L.O. HTR INSP                                  5)2C011          T   29-OCT-87:07 30-0CT-87:06    EL 176          2      24                MUST NST1488C    LO PRESSURE  INST CAL                          512CO'I'I        T    29-OCT-87:08 29-0CT-87:19      ICESR          R      l2                NUST 87APPJIC    HUNPHREY VLV LEAK                              512COII    . T    29-OCT-87:10 29-OCT-87:I7    tlE191          2       8        32 87ADLZ)     WORK ORDER;                                    512C011              29-0CT-87:12 29-OCT-S7:12    NE191          I      I        37 NST1480C    ECP PNEU PS  CAL                              5'I2C01'I            29-OCT-87:13 30-0CT-87:08      ICE52          2      20                NUST 86ARHI I    LOCKPLATE                                      512COII          T   29-0CT-87:15 29-OCT-87:16    ELI76      . I  -  2       29 EDCB220    INSTALL CEN COVERS                              512C011          T   29-OCT-87:17 29-OCT-87:20    NEI9 I          2                29 NST148<C    LO INSTRUMENT CAL                              5)2CO'll        T    29-0CT-,87:20 30-OCT-87:03    ICE52          R      8        0      NUST NSTNOOIC    IB-LB INTERCOOLER    INSPECTION'B-RB 512CO I 'I       T    29-0CT-87: R I 29-OCT-87: R<  t)E I 91        2                        MUST MSTNOOID            INTERCOOLER INSP              N"S-RN-002 512CO) I         T   30-OCT-87: 01 30-OCT-87: 04  IIE191          2                         NUST MST I <9<C  F. 0. INST CAL'-8-RN-322                        5IRC011          7    30-OCT-87:04 30-OCT-87:13    ICE52      ~    2      10                MUST NSTN023C    COV COUPLINC REPLACEMENT                        512CO'I I       T "
?NSP AND CAL 86AUTHI REPLACE KU PUHP SEAL EDGB210 FILL LO SUHP TANK 86BIIULI REPLACE COUPL1NG GASKET NSTI496C ENG VIB SlIITCH TEST 1-8-RII-334 IISTIIOI4D EDG COIIPRESSION CHKS 512CO I I 512C011 512CO I'I 512CO I I 512COII 512C011 T 30"OCT-87: 14 31-OCT-87:
30-OCT-87:05 30-0CT-87:08    NEI9 I          I                3      MUST N-S-Rtl-060 87AFATI    L.O. COUPLING                                  512COI  I        T    30-0CT-87:07 30"OCT-87:10     HEI 91          2 STAXPXI    J.W. CASKETS                                    5)RCOI)          T   30-0CT-87: 09 30-,0CT-87: )4'E191            2,      6 MSTI492C    ECP  INSP AND CLEAN                            512C011              30-OCT-87:09 30-OCT-87: I6    ICE52          2      8      = 9      NUST NST1482C    LO SUHP LEVEL                                  512C011              30-OCT-87:11 30-0CT-87:14    ICE52          2                .7      NUST 1
01 1CE52 T 30-OCT-87:15 30-0CT-87:18 IIEI91 T 30-OCT-87:
 
15 30-OCT-87:
DIESEL GEN DORK PAGE  32 NUllBER'ESC ACTIVITY                                    1NTER-FACE PLAN'D START ZONE ACTUAL START FINISH DATE CREII 1D  OTY  OU PROC NO.
18 IIE19I 7 30"OCT-87:
TF CODE    c IISTI 490C THERHOCOUPLE ?NSP  AND CAL      512CO I I  T  30 "OCT-87: 14 31-OCT-87: 01  1CE52    2 '12        '0      IIUST 86AUTHI  REPLACE KU PUHP SEAL            512C011    T  30-OCT-87:15 30-0CT-87:18    IIEI91    2 EDGB210  FILL LO SUHP TANK                512CO I 'I  T  30-OCT-87: 15 30-OCT-87: 18  IIE19I    I  4 86BIIULI REPLACE COUPL1NG GASKET          512CO I I  7  30"OCT-87: 19 30-OCT-87:20    IIE19I    2  2 NSTI496C   ENG VIB SlIITCH TEST 1-8-RII-334 512COII    T  31-OCT-87: 06 31-OCT-87: 13, ? CE52    2  8                HUST IISTIIOI4D EDG COIIPRESSION CHKS            512C011    T   31-OCT-87:06 31-OCT-87(06     MEI91     2   I                 IIV ST}}
19 30-OCT-87:20 IIE19I T 31-OCT-87:
06 31-OCT-87:
13,?CE52 T 31-OCT-87:06 31-OCT-87(06 MEI91 2'12 2 I 4 2 2 2 8 2 I'0 IIUST HUST IIV ST}}

Latest revision as of 18:57, 3 February 2020

Forwards Supplemental Info Re Util 871015 Emergency License Amend Request Concerning Diesel Generator Surveillance Requirement 4.8.1.1.2.f.11
ML18022A574
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/16/1987
From: Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8710220363
Download: ML18022A574 (16)


Text

~" I REGULA INFORMATION DISTRlBUTIO YSTEM (RIDS)

ACCESSION NHR: 8710220363 DOC. DATE: 87/10/15 NOTARIZED: NO DOCKET FACIL: %0-400 Shearon Harv is Nuclear Poeer Plant> Unit ii Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION BAILEY> J. A. Georgia Power Co.

BAILEY> J. A. Southern Company Servicesi inc.

REC IP. NAME RECIPIENT AFFILIATION Document Contvol Bvanch (Document Control Desk)

SUBJECT:

Pv ovides suplemental info re util 871015 emev gencg license amend request concerning diesel generator surveillance requirement 4. 8. 1. 1. 2. f. 11.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES: Application fov permit renewal filed. 05000400 RECIPIENT COPIES REC IP IENT CQP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 5 5 HUCKLEYi B 1 1 INTERNAL: ARM/DAF/LFMH 1 0 NRR/DEST/ADS 1 1 NRR/DEST/CEB 1 1 NRR/DEST/MTB 1 1 NRR/DEST/RSB 1 NRR/DQEA/TSB 1 1 NR S/ILRH 1 1 OGC/HDSi 1 0 REG FILE 01 1 1 RES/DE/EIB 1 1 EXTERNAL: EGhG HRUSKE> S 1 1 LPDR 1 1 NRC PDR 1 NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 18

1 tl ll t,I

)I t

Form 244 CRK USNRt,'=OS Carolina Power & Light Company lPS1 OCT 22 A tO: OO" Company Correspondence 8710220363 871016 PDR ADOCK 05000400' PDR OCT 1 6 fo87 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR EMERGENCY LICENSE AMENDMENT DIESEL GENERATOR SURVEILLANCE Gentlemen:

On October 15, 1987, Carolina Power l), Light Company submitted an emergency license amendment request regarding diesel generator Surveillance Requirement 4.8, 1.1.2.f.11. The following discussion provides further information as to the emergency aspects of the situations The purpose of this outage is to perform surveillance testing that expires prior to the first refueling outage. The schedule was setup to perform testing on the B train first, which included B Emergency Diesel Generator, The Emergency Diesel Generator is now required to be declared operable in order to change safety trains to perform required testing on the A train components, including A Emergency Diesel Generator. The work to be performed on the A Emergency Diesel Generator includes 1) a partial tear down and inspection, 2) performance of Maintenance Surveillance Tests, and 3) performance of Maintenace Periodic Tests (see attached list).

In addition, surveillance testing requirements are now coming due on A train components. This includes required Technical Specification Surveillance Requirements as well as Environmental Qualification verification.

The outage is currently being delayed by the inability to declare the B diesel operable. Extending the outage will cost the Company approximately 4250,000 per day as estimated by our Systems Operations Department,

ng.) I ~i' l 4454IM~J l1 oozed a got.">raoi I

E

This letter also documents a telephone conversation between members of NRR, Region II, and CPhL held on October i6, i987. Participants in this conversation included: Mr. Albert F. Gibson, Region II; Mrs Gus C.

Lainas, NRR; Ms. Elinor G. Adensam, NRR; Mr. Bartholomew C. Buckley, NRR; Mr. D. M Carthy, CPhL; Mr. D. Tibbitts, CPhL; Mr. B. Clark, CPhL; Mr. A, Howe, CPhL; and Mr. M, Turkal, CPhL ~ At the conclusion of the call, Carolina Power h Light Company was granted an Enforcement Discretion regarding the operability of the B Emergency Diesel Generator until the subject license amendment can be processed'lease refer any further questions regarding this matter to Mr. David C. M Carthy at (9i9) 836-7715.

Yours very truly, R. A. Watson ice President Harris Nuclear Project cc: Mr. D. HE Brown (State of NC)

Mr. B. C. Buckley (NRC)

Dr. J. Nelson Grace (NRC-RII)

Nr. G. F. Maxwell (NRC-SHNPP)

'4 bcc.'Mr. R. H. Bassett Mr. J. D. Kloosterman INPO Mr. R. T. Biggerstaff Mr. L. H. Martin SHEEC Training Mr. G. G. Campbell Mr. R. E. Morgan Reference Library Mr. R. M. Coats Mr. C. H. Moseley SHNPP Reg. Compliance Mr. J. M. Collins Mr. C. E. Rose Mr. A. B. Cutter Mr. J. R. Sipp Mr. C. R. Dietz Mr. R. B. Starkey, Jr.

Mr. G. Forehand Mr. D. L. Tibbitts Mr. Co R. Gibson Mr. R. B. Van Metre Mro M. D. Hill Mr. J. L. Willis Dr. J. D. E. Jeffries Mr. DE CD Whitehead Mr. R. J. Zula

"I 4 kq'

~ q

~ 5,'

DIESEL GEN.WORK PAGE 28 ACTIVITY INTER- PLAN'D START FINISH CREW PROC TF NUMBER DESC FACE ZONE ACTUAL START . DATE ID QTY DU NO. CODE NSTHO'I4A COLD COMPRESSION CHECKS 51PC010 T 16-OCT-87:16 16-OCT-87:16 NE191 2 'I 173 MUST N-S-RN-017 EDGA030 JACKET WTR SYS CLEARANCES 512C010 ~

T ~

. 16-OCT-87 19 16-0CT-.87 c 19

< NE191 I 176 EDCA040 L.O. SYSTEM CLEARANCES ~

512C010 T 16-OCT-87:19 16 OCT-87: 19 tlE191 I

' 173

'I EDCAOBO FO SYSTEN CLEARANCE 512COIO T 16"OCT-87:19 16-OCT-87:19 NEI91 217 87ACNB'I 'EGULATOR GLYPTOL 5'I 2CO I 0 T 16-OCT-87:19 16-OCT-87:RO ICE52 I 2 238 NSTEOSTA REMOVE GEN COVERS AND NST-,E-0057 ASSIST SIRCOI 0 T 16-OCT-87: 'I 9 'I 6-OCT-87:22 NE191 2 210 IIUS+

EDCAI I 0 L.O. .SUMP TANK FOR HSTE0058

'RAIN 512COI 0 T 'I 6 "OCT-87:20 16-OCT-87-23 NEI91 I 4 NSTN009A CRANKCASE VISUAL INSP tl-S-RN-009 512COI 0 T 16-OCT-87:20 16-OCT-87:23 NE191 2 4 183 MUST 87AFLJI INSTRUtlENT LEAK 512COI 0 T 16-0CT-87:21 16"OCT-87:RI ICE52 238 E 87AFLJ2 PI CAGE 512COI 0 T 16-OCT-87:R2 16-OCT-87:22 ICE52 I 238

'I HSTE0578 JW HEATER INSP 512COI 0 7 16-OCT-87-22 17-OCT-87:21 ELI76 2 24 NUST MSTI485A JW INSTR CALID I-8-RH-323 512COI 0 16-OCT-87:22 17-OCT-87:10 ICESR 2 13 176 MUST NSTM007A TURBO END PLAY N-8-RN-003 51RCOI 0 T 16-OCT-87: 22 17-OCT-87: 07 HE191 3 '10 NUST NSTN021A AIR BUTTERFLY VALVES N-8-RN-031 512CO'I 0 . T 16-OCT-ST: 23 17-OCT-87: OR tlE191 2 234 NUST NSTN022A CENERATOR PEDESTAL BRG OIL CHANCE 512COI 0 T 16-OCT-87: 23 17-OCT-87: OR HEI 91 2 4 226 MUST N-S-RN-032 NSTNOIIA CRANKSHAFT DEFL N-5-RH"OII 512COI 0 7 16-OCT-87:24 17-OCT-87:03 NEI9'I 2. 4 183 MUST MSTE060A 'GEN CLEANING AND INSP 5'I2CO'10 17-OCT-87:03 18-OCT-87: 02 EL 176 2 24 NUST MSTNOIOA CYL LINER VISUAL INSPECTION 512COI 0 17-OCT-87:03 17-OCT-87: 14 NE191 2 12 NUST NSTN016A FUEL INJECTOR INSP N"8-RN-016 512CO I 0 17"OCT-87: 03 17-OCT-87: 14 tlE 191 2 12 214 MUST NST1497A TEMP TRIP GALS I-8-RN-335 512CO I 0 17-OCT-87: 04 17-0CT-.87: 5 'I I

ICE52 2 12 183 NUST NSTtl026A tlANUAL VLV 'INSP N" S-RN-039 512COI 0 T 17-OCT-87:04 17-OCT-87:11 NE191 2 8 225 NUST NSTHOO I A INTERCOOLER INSP N-8-RN-001 5IRCOIO T 17-OCT-87:08 17-0CT-87:15 NEI91 4 8 203 NUST

4 DIESEL GEN WORK PACE 29 ACTIVITY INTER- PLAN'D START FINISH - - CREW PROC TF NUMBER DESC IFACE ZONE ACTUAL START F DATE ID OTV DU .NO. CODE NSTI541A LO JW HTR THERMO CALIB I-8-RM-339 SIRCOI0 T 17-OCT-87:II 17-OCT-87: 16 I CE52 ~ 2 6 176 MUST tlSTtl017A START AIR SYSTEM N-S-RM-tl025 512C010 T 17-OCT-87:15 17-OCT-87:22 NE19 I 4 8 el 4 NUST NSTNOI9A ROCKER ARN INSPECTION N-8-RN-027 512col 0 T 17-OCT-87:15 17-OCT-87:18 NE191 e R16 NUST NSTM023A COVERNOR COUPLINC REPLACEMENT sl ecol o T 17-OCT-87:16 17-OCT-87:19 NEI91 NUST

'1

~

NSTI487A LO PRESSURE INSTR CALIB 512colo T 17-OCT-87:17 18-OCT-87:04 ICE52 2 12 176 86BTYAI AIR START TOROUE 512COIO T 17-0CT-.87:19 17-OCT-.ST:20 NEI91 ' 2 216 STALWQI JW HTR INSP Sl ecol 0 T 17-OCT-87:20 18-OCT-87:01 NEI91 2 6 203 NSTEOSBA LO HTR INSP E-8-RM-036 51 ecol 0 17-OcT-87:ee IS"OCT-87:21 ELI76 2 24 NUST 87ALWQIA TURBO JACKET IITR CASKETS 512COIO T 18-OCT-87:02 18"OCT-87:07 NE191 2 6 203 E EDCAIOO INSTALL CEN COVERS 512C010 T '8-OCT-87:03 18-OCT-8T:06 NE191 2 4 206 NST1483A LO INSTR CAL I-8-RN-381 512colo T 18 OCT-87:05 18-OCT-87tlR I CE5R 8 8 176 NUST EDCA060 REFILL JACKET IITR SYSTEM SIRC010 T 18"OCT-87:08 18-OCT-87:09 NE191 203 MST1493A F.O. INSTR GALS I-8-RN-327 512C010 T 18-OCT-87:13 18-OCT-87'-24 I CE52 2 12 176 MUST EDCAIRO REFILL LO SUMP 512COI 0 T 18-OCT-87:R2 '19-OCT-87:O'I tlE191 I 4 187 NSTtl009B CONPLETE NST N-009 CLOSEOUT 512col 0 T "

18-OCT-87:22 18-OCT-ST:23 NE191 2 R 151 MUST CRANKCASE NST1499A CRANKCASE PRESSURE I-8-RN"337 51RCOI 0 T 18-OCT-87:84 19-OCT-87:05 I CE52 2 6 151 MUST MSTI489A THERtlOCOUPLES I-S-RM-327 5'I RCO I 0 T 19-'OCT-87:Ol 19-OCT-87:IR lcEse 2 le 176 NUST NST1479A ECP PNEU PRESSS CAL I-8-RN-317 slesolo T 19-OCT-87:06 RO-OCT-.87- 01 ICE52 e eo 151 MUST NST1491A ECPINSP CLEANINC 512colo T 20-OCT-87:02 20-OCT-87:09 ICESR 2 8 151 MUST tlST148 I A L.O. SUIIP LEVEL 51RCOIO T 20-OCT-ST:10 20-OCT-87:13 ICE52 151 MUST NST1495A EDC VIB SW TEST 6 CAL 51RCOIO eo-ocT-87:18 el-OCT-87:41 ICES2 e 8 151 NUST NSTN0198 EDC COMPRESSION CHKS 512C010 T Ro-OCT-87:18 20-OCT-S7:21 NEI91 ' 155 NUST

~ >

I ~

DIESEL GEN IJORK PAGE 30 ACTIVITY NUMBER DESC 1NTER-FACE PLAN'D START ZONE ACTUAL START F 1NI SH DATE

'REII ID QTY PROC TF DU NO. CODE NSTM014C EDG COMPRESSION CHECKS N-8-RN-018 512CO I I T 28-OCT-87: 07 28-OCT-87: 07 NE191 . 2 I NUST EDGB030 J.W SYSTEN CLEARANCES 512CO I 'I T 28-0CT-87: 'I 0 28-OCT-87: 10 NE191 . I I 0 EDGB080 F.O. SYS CLEARANCE 51 2C01 'I T 28-OCT-87:10 88-OCT-87:10 NEI91 I I EDGB040 L.O. SYSTEN CLEARANCE 512C011 T 28-OCT-87:10 28-OCT-87-10 ME191 87ACNEI REGULATOR GLYPTOL 512C011 T 28-OCT-87:10 28 OCT-87: 11 1CE52 2 60 E NSTE060C REMOVE GENERATOR COVERS 512COII T 28-OCT-87: I0 28-OCT-87: 13 NEI 91 2 MUST HSTE058C ME ASSIST NSTE058 DRAIN LO SUHP 512COII T '8-OCT-87: 11 28-OCT-87: 14 NE191 'I 4 MUST TANK MSTN009C CRANKCASE VISUAL 512COI I T 28-OCT-87:11 28-OCT-87:14 NE191 2 HUST MSTNO'I OC CYL L1NER VISUAL 512C011 T 28-OCT-87: 28-OCT-87: 22 11 NE191 2 12 37 HUST 87ACGUI A1R F1LTER LEAK 512C011 T 28-OCT-87:12 28"OCT-87:13 lCE52 I 2 60 NSTE057C J. II. HTR 1NSPECT1ON E-8-RN-035 512COII T RS-OCT-87:13 29-0CT-87:IR EL176 2 24 35 NUST NST1486C J.W. 1NSTR CAL .'512CO I I T 28-OCT-87:13 29-OCT-ST:O'I 1CE52 2 13 0 MUST NSTNOOTC IB-LB TURBO ROTOR END PLAY 512C011 T RS-OCT-87 13 28-OCT-87; 15 NE191 3 3 16 NUST N-S-RH-004 NSTtl022C GEN PED BRG 01L CHG 512CO

' 28-OCT-87: 14 28-OCT-87: 17, tlE191 I I 2 40 NUST NSTE060D GEN CLEAN 1NSPECT 512COI I 28-DCT-87: 15 29-OCT-87-'4 ELI76 8 24 MUST MSTNOIIC CRANKCASE VDEFL 512COII T 28-OCT-87:15 28-OCT-87:18 NE191 2 NUST NSTNO'I6C FUEL INJ 1NSP 512CO I I T '8-OCT-87:16 29-OCT 87: 03 NEI91 2 '12 NUST MPTN026C MANUAL VLV 1NSPECTION 5IRCOI I T 28-OCT-87:18 29-OCT-87iOI NE191 2' 40 NST1498C TEMP TR1P CAL 512COI I T 28"OCT-87: 19 29-OCT-87: 06,1CE52 2 12 9 ,. MUST NSTN009D COMPLETE MST-N009 CRANKCASE 512COI I T 28-OCT-87: 19 28-OCT-87:20 tlE191 2 2 NUST CLOSEOUT NSTN019C ROCKER ARN INSPECT1ON N-S"RN"028 5IRCOI I T 28-OCT-87:23 29"OCT-87:02 tlE19 I 37 MUST NST1502C LO/JU HTR THERtIOSTAT CAL 512CO I I r 29-OCT-87:02 29-OCT-87:07 ICE52 2 HUST

V 1

DIESEL CEN WORK PACE 31 ACTIVITY INTER- PLAN'D START .

NUMBER DESC FACE ZONE ACTUAL START 'ATE FINISH CREW ID QTY . DU PROC NO.

TF CODE NSTN021C AIR BUTTERFLY 512COII , T '9-OCT-87:02 29-OCT-87:05 MEI91 2 40 MUST 86BTXZI AIR START VLV TORQUE 512COI I 29-OCT-87: 03 29-OCT-87: 04 NE191 2 2 37 E r

NSTNO)7C AIR START INSPECTION 512CO I 1. T 29-OCT-87-04 .29-0CT-87:)1 NE 191 4 8 37 NUST NPTNOOIC IB"RB TORBO INSPECTION 512COII ' 29-OCT-87'-05 29-OCT-87:20 NE19) - 3 16 87APPJID CAN COVER OIL LEAK 512COII 29-OCT-87: 06 29-OCT-87: 09 NE191 2 4 40 NST1500 CRANKCASE PS CAL 512COII T 29-OCT-87:07 29-0CT-87:12 ICE52 2 6 MUST MSTE058D L.O. HTR INSP 5)2C011 T 29-OCT-87:07 30-0CT-87:06 EL 176 2 24 MUST NST1488C LO PRESSURE INST CAL 512CO'I'I T 29-OCT-87:08 29-0CT-87:19 ICESR R l2 NUST 87APPJIC HUNPHREY VLV LEAK 512COII . T 29-OCT-87:10 29-OCT-87:I7 tlE191 2 8 32 87ADLZ) WORK ORDER; 512C011 29-0CT-87:12 29-OCT-S7:12 NE191 I I 37 NST1480C ECP PNEU PS CAL 5'I2C01'I 29-OCT-87:13 30-0CT-87:08 ICE52 2 20 NUST 86ARHI I LOCKPLATE 512COII T 29-0CT-87:15 29-OCT-87:16 ELI76 . I - 2 29 EDCB220 INSTALL CEN COVERS 512C011 T 29-OCT-87:17 29-OCT-87:20 NEI9 I 2 29 NST148<C LO INSTRUMENT CAL 5)2CO'll T 29-0CT-,87:20 30-OCT-87:03 ICE52 R 8 0 NUST NSTNOOIC IB-LB INTERCOOLER INSPECTION'B-RB 512CO I 'I T 29-0CT-87: R I 29-OCT-87: R< t)E I 91 2 MUST MSTNOOID INTERCOOLER INSP N"S-RN-002 512CO) I T 30-OCT-87: 01 30-OCT-87: 04 IIE191 2 NUST MST I <9<C F. 0. INST CAL'-8-RN-322 5IRC011 7 30-OCT-87:04 30-OCT-87:13 ICE52 ~ 2 10 MUST NSTN023C COV COUPLINC REPLACEMENT 512CO'I I T "

30-OCT-87:05 30-0CT-87:08 NEI9 I I 3 MUST N-S-Rtl-060 87AFATI L.O. COUPLING 512COI I T 30-0CT-87:07 30"OCT-87:10 HEI 91 2 STAXPXI J.W. CASKETS 5)RCOI) T 30-0CT-87: 09 30-,0CT-87: )4'E191 2, 6 MSTI492C ECP INSP AND CLEAN 512C011 30-OCT-87:09 30-OCT-87: I6 ICE52 2 8 = 9 NUST NST1482C LO SUHP LEVEL 512C011 30-OCT-87:11 30-0CT-87:14 ICE52 2 .7 NUST 1

DIESEL GEN DORK PAGE 32 NUllBER'ESC ACTIVITY 1NTER-FACE PLAN'D START ZONE ACTUAL START FINISH DATE CREII 1D OTY OU PROC NO.

TF CODE c IISTI 490C THERHOCOUPLE ?NSP AND CAL 512CO I I T 30 "OCT-87: 14 31-OCT-87: 01 1CE52 2 '12 '0 IIUST 86AUTHI REPLACE KU PUHP SEAL 512C011 T 30-OCT-87:15 30-0CT-87:18 IIEI91 2 EDGB210 FILL LO SUHP TANK 512CO I 'I T 30-OCT-87: 15 30-OCT-87: 18 IIE19I I 4 86BIIULI REPLACE COUPL1NG GASKET 512CO I I 7 30"OCT-87: 19 30-OCT-87:20 IIE19I 2 2 NSTI496C ENG VIB SlIITCH TEST 1-8-RII-334 512COII T 31-OCT-87: 06 31-OCT-87: 13, ? CE52 2 8 HUST IISTIIOI4D EDG COIIPRESSION CHKS 512C011 T 31-OCT-87:06 31-OCT-87(06 MEI91 2 I IIV ST