ML17342B169: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 02/16/1988
| issue date = 02/16/1988
| title = Forwards Monthly Operating Repts for Jan 1988 & Corrected Operating Data Repts for Apr-Dec 1987
| title = Forwards Monthly Operating Repts for Jan 1988 & Corrected Operating Data Repts for Apr-Dec 1987
| author name = WOODY C O
| author name = Woody C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED IHSrRIBUTION DEMONSXIRTION SYSTEM ACCESSION NBR: FACIL:50-000 50-250'0-251 50-335 50-389 AUTH.NAME WOODY,C.O'.
{{#Wiki_filter:ACCELERATED               IHSrRIBUTION       DEMONSXIRTION           SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)8802220114'OC.
ACCESSION NBR: 8802220114'OC. DATE:           88/02/16   NOTARIZED: NO       DOCKET FACIL:50-000 Generic Docket                                                   05000000 50-250'0-251 Turkey Point Plant,   Unit 3, Florida Power and Light C   05000250 Turkey Point Plant, Unit 4, Florida, Power and Light C     05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co.               05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.               05000389 AUTH. NAME              AUTHOR AFFILIATION WOODY,C.O'.            ,Florida Power & Light Co.
DATE: 88/02/16 NOTARIZED:
RECIP.NAME              'RECIPIENT AFFILIATION Document. Control Branch (Document Control, Desk)                 R
NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida, Power and Light C St.Lucie Plant, Unit 1, Florida Power&Light Co.St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTHOR AFFILIATION ,Florida Power&Light Co.'RECIPIENT AFFILIATION Document.Control Branch (Document Control, Desk)DOCKET 05000000 05000250 05000251 05000335 05000389 R  


==SUBJECT:==
==SUBJECT:==
Forwards monthly operating repts for Jan 1988&corrected operating data'epts.for Apr-Dec 1987.DISTRIBUTION CODE:.IE24D COPIES RECEIVED: LTR+ENCL SIZE:+TITLE: Monthly Operating Report (per Tech Specs)NOTES'ECIPIENT ID CODE/NAME PD2-2 LA EDISON,9 COPIES LTTR ENCL 1 0 1 0 RECIPIENT ID CODE/NAME PD2-2 PD TOURIGNY,E COPIES LTTR ENCL 5 5 1 0 j A D'NTERNAL:
Forwards monthly operating repts for Jan 1988 & corrected operating data'epts .for Apr-Dec 1987.
AEOD/DOA ARM TECH ADV, NRR/DOEA/EAB NRR/PMAS/ILRB RGN2 EXTERNAL: EG&G GROH,M NRC PDR 1 1 2 2 1 1 1 1 1 1 1 1 1 1 AEOD/DSP/TPAB.NRR/DLPQ/PEB RR-P/PB REG F,XLE Ol LPDR NSIC 1 1 1 1 1 1 1 1 2 2 1 1 S A TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 20 il II P.O.14000, JUNO BEACH, FL 33408-0420 FEBRUARY.'
DISTRIBUTION CODE:. IE24D COPIES RECEIVED: LTR TITLE: Monthly Operating Report (per Tech Specs)
6 1988 L-88-70 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
                                                          +  ENCL    SIZE: +
Re: Turkey Point Units 3 and 4, Docket Nos.50-250 and 50-251 St.Lucie Units 1 and 2 Docket Nos.50-'335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St.Lucie Units 1 and 2.Also attached're corrected copies of April through December 1987 Operating Data Reports for Turkey Point Unit 3 and St.Lucie Units 1 and.2.'These corrected" copies provide information on ,the forced outage rate that had'een incorrectly submitted.
NOTES
Very truly yours, 1 C.O.Wo Execut'ice President'OW/NWG/gp Attachments cc: Dr.J.Region Senior Senior Nelson Grace, Regional Administrator, II, USNRC Resident Inspector, USNRC, Turkey Point Plant Resident Inspector, USNRC, St.Lucie Plant NWG/001.MOR'8802220114 880216 L.PDR'DOCK'.05000250
        'ECIPIENT                   COPIES            RECIPIENT        COPIES A
',R........,....'..., DCD y+(I)an FPL Group company t I}}
j ID CODE/NAME     LTTR ENCL      ID  CODE/NAME    LTTR ENCL PD2-2 LA                 1   0     PD2-2 PD             5    5 EDISON,9                  1    0      TOURIGNY,E           1   0 AEOD/DOA                  1    1    AEOD/DSP/TPAB        1    1            D'NTERNAL:
ARM TECH ADV,             2    2    .NRR/DLPQ/PEB        1    1 NRR/DOEA/EAB             1    1      RR-    P/ PB        1    1 NRR/PMAS/ILRB             1    1      REG F,XLE      Ol    1    1 RGN2                     1    1 EXTERNAL: EG&G GROH,M                 1   1     LPDR                2   2 NRC PDR                  1   1     NSIC                 1   1 S
A TOTAL NUMBER OF COPIES REQUIRED: LTTR             23   ENCL   20
 
il II P. O. 14000, JUNO BEACH, FL 33408-0420 FEBRUARY.'   6 1988 L-88-70 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:     Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-'335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2. Also corrected copies of April through December 1987 Operating attached're Data Reports for Turkey Point Unit 3 and St. Lucie Units 1 and .2.         'These corrected" copies provide information on ,the forced outage rate that had'een incorrectly submitted.
Very     truly 1
yours, C. O. Wo Execut'ice President'OW/NWG/gp Attachments cc:     Dr. J. Nelson Grace, Regional Administrator, Region    II,             USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector,       USNRC, St. Lucie Plant NWG/001. MOR y+(
I)
'8802220114 880216
.PDR'DOCK '.05000250                                                             an FPL Group company
',R ........, ....'...,   DCD
 
t I}}

Latest revision as of 09:12, 22 October 2019

Forwards Monthly Operating Repts for Jan 1988 & Corrected Operating Data Repts for Apr-Dec 1987
ML17342B169
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 02/16/1988
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17342B170 List:
References
L-88-70, NUDOCS 8802220114
Download: ML17342B169 (4)


Text

ACCELERATED IHSrRIBUTION DEMONSXIRTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8802220114'OC. DATE: 88/02/16 NOTARIZED: NO DOCKET FACIL:50-000 Generic Docket 05000000 50-250'0-251 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 Turkey Point Plant, Unit 4, Florida, Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O'. ,Florida Power & Light Co.

RECIP.NAME 'RECIPIENT AFFILIATION Document. Control Branch (Document Control, Desk) R

SUBJECT:

Forwards monthly operating repts for Jan 1988 & corrected operating data'epts .for Apr-Dec 1987.

DISTRIBUTION CODE:. IE24D COPIES RECEIVED: LTR TITLE: Monthly Operating Report (per Tech Specs)

+ ENCL SIZE: +

NOTES

'ECIPIENT COPIES RECIPIENT COPIES A

j ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 EDISON,9 1 0 TOURIGNY,E 1 0 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 D'NTERNAL:

ARM TECH ADV, 2 2 .NRR/DLPQ/PEB 1 1 NRR/DOEA/EAB 1 1 RR- P/ PB 1 1 NRR/PMAS/ILRB 1 1 REG F,XLE Ol 1 1 RGN2 1 1 EXTERNAL: EG&G GROH,M 1 1 LPDR 2 2 NRC PDR 1 1 NSIC 1 1 S

A TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 20

il II P. O. 14000, JUNO BEACH, FL 33408-0420 FEBRUARY.' 6 1988 L-88-70 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-'335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2. Also corrected copies of April through December 1987 Operating attached're Data Reports for Turkey Point Unit 3 and St. Lucie Units 1 and .2. 'These corrected" copies provide information on ,the forced outage rate that had'een incorrectly submitted.

Very truly 1

yours, C. O. Wo Execut'ice President'OW/NWG/gp Attachments cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant NWG/001. MOR y+(

I)

'8802220114 880216

.PDR'DOCK '.05000250 an FPL Group company

',R ........, ....'..., DCD

t I