ML17223A862

From kanterella
Jump to navigation Jump to search
Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831
ML17223A862
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/25/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-276, NUDOCS 9007310235
Download: ML17223A862 (4)


Text

ACCELERATED DI RIBUTION DEMONST ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007310235 DOC.DATE: 90/07/25 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 AUTH. NAME AUTHOR AFFXLIATION SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that NXS-1 & NXS-2 forms, as part of inservice insp rept, will be submitted by 900831.

DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR J Submittal: Inservice Inspection/Testing/Relief from ENCL 0 SIZE:

ASME ode NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DET/ECMB 9H NRR/DET/EMEB 9H NUDOCS-ABSTRACT OC/LFJg3 OGC/HDS2 EGG ILE 0 RES/DSXR/EIB EXTERNAL: EG&G BROWN,B EG&G RANSOME E C LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL

~,

l,

P.O. Box14000, Juno Beach, FL 33408-0420 JUL 25 l990 L-90-276 10 CFR 50.55a r

U. S. Nuclear Regulatory Commission jL 'p Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Unit 1 Docket 50-335 Inservice Ins ection Re ort ASME Code, Section XI, (IWA-6300) requires that Inservice Inspection (ISI) Summary Reports (Forms NIS-1 and NIS-2) be submitted within 90 days after ISI completion. The administrative review of the NIS-2 forms has not been completed, due in part, to the plant ISI manpower required to support the current St. Lucie Unit 1 outage.

The NIS-1 and NIS-2 forms will be submitted by August 31, 1990.

This schedule change has been discussed with the NRC Project Manager for St. Lucie.

Very truly yours, D. A. ger Vice esident St. u ie Plant DAS:LLM:kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC DAS/PSL 5220 5'0073l0235 900725 t PDR ADOCK 05000335 9 PDC o47 an FPL Group company

r i

1