Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants
ML17223A858
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/19/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-273, NUDOCS 9007260248
Download: ML17223A858 (4)


Text

N

. P.CCELERATED D+RIBUTION SYSTEM C ~ DEMONSTRATION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007260248 DOC.DATE: 90/07/19 NOTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards implemenation status of 10CFR50.62 mod at facility.

DISTRIBUTION CODE: A055D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR/Licensing Submittal: Salem ATWS Events GL-83 28 NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 3 3 NORRIS,J 1 1 INTERNAL: ACRS 6 6 NRR/DEST/ESB 8D 1 1 NRR/DLPQ/LPEB10 1 0 NRR/DOEA/OGCB11 1 0 NRR/DST/SICB 7E 1 1 NRR/DST/SPLB 8D 1 0 OC 1 0 OGC/HDS2 1 0 G 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 17

P.O. Box 440M, Juno Beach, FL 33408-0420 JUL I 9 l990 L-90-273 10 CFR 50.62 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket 50-389 Antici ated Transients Without Scram On March 1, 1989, Florida Power and Light Company (FPL) met with the NRC to discuss the conceptual design of the St. Lucie Unit 1 and 2 plant modifications to meet 10 CFR 50.62, "Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants." In that meeting the staff requested bi-monthly updates on the modifications implementation status. Attached is the status of the 10 CFR 50.62 modifications at St. Lucie Unit 2 as of July 16, 1990.

Should there be any questions, please contact us.

Very truly yours, D. A. ger Vice r sident St. Lu ie Plant DAS JMP:kw Attachment cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC DAS/PSL 4215 9007260248 9007i9 PDR ADOCK 05000389 ', I PDC P

P~t =

p f an FPL Group company I/g

10 CFR 50.62 IMPLEMENTATION STATUS AS OF JULY 16, 1990 T L IF IT 2 The status of engineering activities for implementation of 10 CFR 50.62 is:

The Plant Change/Modification packages necessary for installing the ATWS systems on St. Lucie Unit 2 have been completed by Nuclear Engineering and transmitted to the St. Lucie Plant for implementation.

The status of procurement activities for implementation of 10 CFR 50.62 is:

Eaton-Consolidated Controls (ECC):

~ On-site Diverse Scram System (DSS) prototype module testing was successfully completed at the end of May.

~ Hardware procurement is complete, and fabrication of the St.

Lucie Unit 2 Engineered Safety Features Actuation System (ESFAS) module is in progress. Completion is expected by September 30.

Combustion Engineering (CE):

Fabrication of the St. Lucie Unit 2 Auxiliary Feedwater Actuation System (AFAS) module is in progress. Completion is expected by September 1.