|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17348A5661990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. ML17348A5461990-09-0707 September 1990 Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17348A5501990-09-0707 September 1990 Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities ML17348A5521990-09-0606 September 1990 Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs ML17348A5431990-08-31031 August 1990 Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA ML17348A5361990-08-27027 August 1990 Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. ML17348A5171990-08-24024 August 1990 Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 ML17348A5051990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 ML20059B0111990-08-14014 August 1990 Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 ML17348A4971990-08-10010 August 1990 Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)1990-07-25025 July 1990 Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17348A4691990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request ML17348A4191990-07-20020 July 1990 Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 ML17348A4201990-07-20020 July 1990 Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr ML17348A4141990-07-20020 July 1990 Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel ML17348A4171990-07-19019 July 1990 Forwards May 1990 Integrated Schedule Regulatory Rept for Plant ML17348A4121990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML17348A4251990-07-17017 July 1990 Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition IR 05000250/19900131990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML20055G8641990-07-16016 July 1990 Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc ML17348A4161990-07-16016 July 1990 Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units ML17348A4151990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML17348A4041990-07-12012 July 1990 Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project ML17348A3921990-07-12012 July 1990 Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld1990-07-11011 July 1990 Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))1990-07-11011 July 1990 Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) ML17348A4321990-07-11011 July 1990 Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 ML17348A3941990-07-0909 July 1990 Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17348A4311990-07-0505 July 1990 Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons ML17348A3851990-07-0303 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training ML17348A3711990-07-0303 July 1990 Responds to NRC 900524 Request for Addl Info on Emergency Power Sys Enhancement Project ML17348A3671990-07-0303 July 1990 Confirms Util Intentions Not to Operate Beyond Refueling Outage That Represents Last Outage Re NRC Bulletin 89-001 ML17348A3841990-06-29029 June 1990 Forwards LER 90-11 on 900609 Re hi-hi Steam Generator Water Level Turbine Trip & Subsequent Reactor Trip Due to Failure of Switch in Feedwater Valve Controller Hand/Auto Station. W/O Encl ML17348A3601990-06-29029 June 1990 Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Test Procedures Developed & Under Mgt Review Reflecting Revised Inservice Testing Program ML17348A3621990-06-28028 June 1990 Notifies That Senior Operator License SOP-20177-2 Will Be Terminated,Effective 900731 ML17348A3651990-06-28028 June 1990 Advises That Completion of safety-related motor-operated Valve Testing & Surveillance Will Be Completed by June 1990, Per Generic Ltr 89-10 Requirements ML17348A3591990-06-27027 June 1990 Responds to Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09.Corrective Actions:Specialist Counselled on Importance of Stopping Procedure When Steps Conflict W/ Condition of Plant & Procedure Use Guidelines Reviewed ML17348A3641990-06-27027 June 1990 Responds to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. ML17348A3861990-06-27027 June 1990 Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 ML17348A3551990-06-21021 June 1990 Responds to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Five Untraceable Circuit Breakers Installed in Unit 3 safety-related Sys.All Five Breakers Replaced W/Traceable Breakers ML20055D9201990-06-20020 June 1990 Advises That Sp Frantz Will Represent Licensee in Argument Scheduled for 900710.Certificate of Svc Encl ML17348A3181990-06-19019 June 1990 Forwards Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant, Per NRC Bulletin 88-008 ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17348A2871990-06-0808 June 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design. Bolt Replacement Performed ML17348A2861990-06-0808 June 1990 Advises That Info Re Operating History of Select Fuel Assemblies Sent to ORNL Between 900419 & 26,per 900510 Request ML17348A2781990-06-0404 June 1990 Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info 1990-09-07
[Table view] |
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
~ ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR:9007160332 DOC.DATE: 90/07/09 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power & Light; Co.
RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards requested addi info re emergency power sys enhancement project.
DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR/Licensing Submittal: Fire Protection NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 EDISON,G 1 1 INTERNAL: NRR WERMEIL, J 1 0 NRR/DET/ECMB 9H 2 2 NRR/DST 8E2 1 1 NRR/DST/SPLB8D1 1 1 NUDOCS-ABSTRACT OGC/HDS2 1
1 1
0 OC~KKB G -~ QT 1
1 0
1 EXTERNAL: LPDR 1 1 NRC PDR 1 i 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 15
e
~
r P.. Box14000, Juno Beach, FL 334M-0420 JUL og i99o 066< GO lAl'-90-256 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket No. 50-250 and 50-251 Emer enc Power S stem Enhancement Pro'ect By letter L-88-669, dated June 23, 1988 as supplemented by letter L-89-124, dated April 3, 1989, FPL provided the Emergency Power Systems (EPS) Enhancement Report to the NRC staff. By letter dated June 15, 1990, the NRC requested additional information to demonstrate that the EPS modifications will comply with 10 CFR 50, Appendix R. Enclosed please find the additional information as requested.
Should there be any questions, please contact us.
Very truly yours, Vice resident Turkey Point Plant Nuclear KNH/GS enclosure cc:, Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant t
oak 9007160332 900709 PDR ADOCK 05000250 PDC an FPL Group company
~ '
The following is a response to the NRC's questions of the June 8, 1990 teleconference on Fire Protection (NRC letter dated June 15, 1990; G. E. Edison to J. H. Goldberg).
Question 1. Provide your re-review of Appendix R compliance as a result of the implementation of this Power Syst: em Enhancement Upgrade Program.
This re-review should describe the impact that this modification had on the Appendix R safe shutdown analysis and demonstrate for each fire area/zone how Appendix R Section III.G and III.Lcompliance will be achieved. In addition, this re-review should identify additional Appendix R fire protection features which may be required for cable/equipment protection, describe changes or modifications to existing alternative shutdown systems (i.e. addition of transfer switches), and summarize the changes required to safe shutdown procedures (i.e. fire in the cable spreading or control room).
Answer 1. The Emergency Power System Enhancement Project (EPS) installs two new Emergency Diesel Generators (EDG) and associated equipment, e. g.,
fuel oil storage tanks, fuel oil transfer pumps and control panels, in a new structure located northeast of the Unit 3 containment building. In addition, new electrical equipment (switchgear, load centers, and MCC's) is being installed in the new EDG building and the new Electrical Equipment Room (EER), and existing electrical equipment is being reassigned and aligned to individual units. The Essential Equipment List, Safe Shutdown Analysis, and the FSAR Fire Hazards Analysis are being updated to reflect the EPS Enhancement Project modifications and their effect on the PTP fire protection program including BTP 9.5-1 Appendix A and 10CFR50 Appendix R. These updates willbe incorporated into the associated Engineering Packages (EP) and will be completed prior to completion of the EP's. The following information is based on the preliminary results of the ongoing updates to the above documents.
SAFE SHUTDOWN ANALYSIS In order to assure SSD capability, circuits associated with new equipment included on the EEL are being analyzed for each fire area to verify that at least one train of redundant SSD equipment remains free from fire damage. This is accomplished for the EPS by applying the same protective features that already exist in the plant, e.g.,
fire areas are separated by 3-hour rated fire barriers with penetrations sealed as appropriate, one train of redundant circuits enclosed in 3-hour rated fire wrap or 1-hour rated fire wrap in areas where automatic fire detection and suppression is installed (exemptions have been granted in some areas and outdoor zones for fire detection and/or suppression where one hour wrap or 20 feet of spacial separation is provided free of intervening combustibles),
or by taking credit for manual actions in lieu of providing protective features.
Generally, "B" train circuits are protected in outdoor fire zones while "A", "B", or both trains may be utilized for SSD in indoor plant areas, depending on specific scenarios. The following are examples of the types of modifications which will be implemented to assure protection of SSD capability for EPS modifications.
New EDG Rooms - Fire barriers separate individual fire areas while automatic pre-action sprinkler systems and fire detectors will be installed (see Answer 2 for a detailed description).
New Diesel Oil Transfer Pump Rooms - Fire barriers separate individual fire areas and wet pipe automatic sprinkler systems and fire detectors will be installed (see Answer 2 for a detailed description).
The EER (Fire Area G) is enclosed with 3-hour barriers and fire detection will be provided. This area was formerly the Hot Machine Shop and is now divided into two fire zones. (See answer 4 for detailed description).
As a result of safe shutdown analysis, Fire Area G (EER) will change from a train "A" shutdown train area to a train "B" shutdown train area. In addition, fire wrap will be installed to protect circuits as required. The following provides a partial listing of equipment whose circuits have been fire wrapped in certain other plant fire areas/zones.
a) Normal Containment Cooler Fan 4V1D b) Normal Containment Cooler Fan 3V1B c) Battery Charger 4A1 d) New EDG Train B Outdoor Raceways e) 125VDC Feeder from Battery Charger 3B2 to 125VDC Distribution Panel 3D23A 125 VDC to auxiliary feedwater flow control valve circuits in Fire Zone 25 ALTERNATE SHUTDOWN Alternate shutdown (ASD) is required at Turkey Point Plant for fires located in the Cable Spreading Room and Electrical Cable Chase (Fire Area HH), Control Room, Control Room Roof and Mechanical Equipment Room (Fire Area MM) and the North-South Breezeway (Fire Area CC) ~
ASD is accomplished from the Unit 3 and Unit 4 ASD Panels located in the respective units'B" Switchgear Room and generally utilizes "B" train equipment.
The addition of the new EDG provides for alignment of the 3B EDG to the Unit 3 ASD Panel and the 4B EDG to the Unit 4 ASD Panel. EPS modifications will change indication from reading EDG B volts and watts (dual meter) on each ASD panel to reading volts and watts for EDG 3B on Unit 3 ASD Panel and EDG 4B on Unit 4 ASD Panel. As a result of EPS, changes affecting ASD will be necessary due to realignment of electrical power distribution to some equipment. Some examples of these changes are as follows.
a) Normal Containment Cooler Fans 3V1B/4VlD circuits are being protected in Fire Zone 79 (outdoor fire zone) with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire wrap.
b) Provisions are being made for local trip of reactor coolant pump feeder breakers at 3A/4A switchgear.
c) Boric Acid Transfer Pumps 3B/4B power and control circuits are being protected in Fire Zone 79 with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire wrap.
d) A Normal/Isolate switch is being provided at Load Centers 3D/4D for the train "B" feeder breaker to Load Centers 3H/4H to allow breaker trip and to mitigate spurious Charging Pump 3C/4C operation during an ASD fire.
SAFE SHUTDOWN PROCEDURE CHANGES (O-ONOP-105, Control Room Evacuation)
(O-ONOP-016.10, Safe Shutdown Manual Actions)
Specific detailed changes will be made to the procedures to address modifications which affect equipment relied upon for Safe Shutdown.
Examples include:
Revised from reading EDG B volts and watts (dual meter) on each ASD panel to'eading volts and watts for EDG 3B on Unit 3 ASD Panel and EDG 4B on Unit 4 ASD Panel.
Addition of transfer/isolate switches.
Addition and deletion of actions required due to the new electrical system.
Fire Zone and Fire Area additions and modifications.
MODIFICATIONS AFFECTING ASSOCIATED CIRCUITS The EPS enhancement modifications are being reviewed to ensure that the safe shutdown capability of the plant will not be adversely affected due to the maloperation of associated circuits as defined in Appendix 9.6A of UFSAR for Turkey Point Units 3 & 4.
Modifications which affect the location or function of components with associated circuits, or the routing of associated circuits, are being evaluated to ensure compliance with Appendix R requirements.
For those cases where associated circuits are affected by the EPS modification or associated circuits are created, the implementing PC/M will specify the necessary fire protection measures to prevent a loss of safe shutdown capability due to fire. In addition, the results of the review of plant modifications on associated circuits are being documented in the associated PC/M. The following guidance is provided to prevent creation of new associated circuits:
Coordinated circuit protection is provided such that power supply to any of the required safe shutdown loads is not adversely affected due to fire effects on a non-safe shutdown circuits.
- b. Cable sizing and cable protection ensures that the protective action will take place prior to exceeding the design ratings of the cables.
c, Design criteria for high-low pressure interfaces will be maintained.
- d. All raceways passing through a fire rated wall or barrier are sealed per existing design requirements.
- e. The SSA will identify any potential spurious actuations and will prescribe adequate protection or manual actions to ensure safe shutdown Question 2. Section 5. 3, Fire Protection System, of the subj ect submittal, addressed the proposed fire protection features for the diesel generator building. In that section it was identified that the diesel generator building will be protected by a pre-action sprinkler system. However, the submittal did not provide an adequate description of the system design. Additional information is requested which describes the extent of system coverage in the building (i.e. is the system going to protect the entire building or just the diesel generator rooms); sprinkler distribution/water application density; how the system is going to be automatically actuated (i.e. dedicated detection actuation system or from the general fire/smoke detection system), alarmed and annunciated upon actuation; and when in standby how system integrity is going to be supervised.
Answer 2. The new diesel generator building is built of reinforced concrete construction and is separated into six fire areas bounded on all sides with 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> rated fire barriers with the exception of exterior wall ventilation openings. The Fire Area/Zone designations are as follows.
Fire Area/Zone Description SS/133 EDG Room 4B TT/134 Switchgear Room 3D SS/135 EDG Control Room 4B XX/136 Diesel Oil Transfer Pump Room 4B XX/137 Diesel Oil Storage Tank 4B RR/138 EDG Room 4A UU/139 Switchgear Room 4D RR/140 EDG Control Room 4A WW/141 Diesel Oil Transfer Pump Room 4A WW/142 Diesel Oil Storage Tank 4A Grade level exterior wall ventilation openings are protected by external fire barriers such that a single exposure fire would not affect both units while potential for exposure fires to above grade ventilation openings is too insignificant, due to height above grade and the outdoor nature of the space, to warrant additional fire protection.
The Diesel Fuel Oil Tanks 4A and 4B are integral to the EDG structure, but are accessible only through removable concrete hatches located on the roof.
Automatic pre-action sprinkler systems, actuated by dedicated rate compensated thermal detectors, will be installed in the diesel generator rooms. Wet pipe sprinklers will be installed in the diesel fuel oil transfer pump rooms. Each system, upon actuation, will be alarmed/annunciated both locally at EDG Building fire protection panels and in the Main Control Room at the existing Main Fire Alarm Panel C39A.
The local panels are manufactured by Pyrotronics (System 3), and include the feature of supervising the alarm circuits when in standby, i.e., monitoring (1) the removal of a detector from the detector circuit, (2) an open circuit in the detector circuit, (3) an open circuit in the Main Control Room annunciator circuit, (4) an open or shorted condition on the audible circuit line, (5) the removal of a supervised system module, (6) the loss of main power, and (7) a ground fault on any detector circuit, audible signal circuit or dc power line within the system.
In addition, a separate fire detection system that will annunciate in the Control Room will be installed in all accessible areas of the diesel generator building.
Question 3. Section 5.3 of the subject submittal does not provide any information regarding manual hose station and standpipe provisions inside the diesel generator building. NRC SRP 9.5.1, Guidelines for Fire Protection for Nuclear Power Plants, Section C.l.c, indicates that total reliance should not be placed on a single fire suppression system and that appropriate backup fire suppression capability should be provided. Interior hose stations along with the appropriate distribution of fire extinguishers is considered acceptable as backup fire suppression. Therefore, in order to verify that an adequate level of backup fire protection is being provided, additional information, which describes the backup fire suppression capability for the new Diesel Generator Structure, is requested.
Answer 3. There are no manual hose stations nor standpipe provisions inside the EDG Building. Hose stations inside the building could be considered to be inaccessible in a fire. Note, however, that three portable fire extinguishers are available in each EDG room (two on the bottom floor in each EDG Room and one upstairs between the Switchgear and Control Rooms). A hose cabinet will be located by hydrant HY18 which is located within a hundred feet of the building.
Any location within the new diesel generator building will be accessible with no more than 200 feet of hose which will be available in the hose cabinet. Additionally, a standpipe and hose cabinet will be located just outside on the north side of the EDG Building. Also, FPL's on site fire brigade has access to fire fighting foam.
In the event the fire cannot be controlled by the fire brigade, large scale fire fighting foam capability is provided by the Mutual Aid Program from the Dade County Fire Department and Homestead Air Force Base.
Question 4. The subject submittal does not address the fire protection features being provided for the diesel generator building switchgear rooms or the additional electrical equipment (i.e. spare battery bank, battery chargers and inverters, MCCs etc.) being installed in the auxiliary building as part of the upgrade modifications. Additional information, which describes the existing/proposed fire protection features for these areas (i.e. fire detection capability, fire suppression capabilities, fire barriers, etc.) is requested in order to verify that the existing/proposed level of fire protection is consistent with the NRC guidelines.
Answer 4, Fire detection (smoke detectors) has been provided for the new EDG Building Switchgear and Control Panel rooms and tied-into the local EDG Building fire detection panels which will alarm/annunciate in the Main Control Room at the existing Main Fire Alarm Panel C39A.
No fire suppression features have been provided for the new EDG Building Switchgear or Control Panel Rooms'he Electrical Equipment Room (EER) is a redesignated fire area formally used as the Hot Machine Shop. The fire area is separated into two fire zones and is bounded on all walls with 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire barriers with all penetrations and doors protected by 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> rated assemblies. Exterior walls and penetrations which do not serve to separate redundant trains of equipment and cable may not be 3 hr.
fire rated (i.e. HVAC penetrations). An interior room has been created from non-combustible construction at the east end of the EER which houses a spare station battery. A mezzanine, open to the EER, is located above the spare battery room and contains battery chargers and an air handling unit.
Portable fire extinguishers will be installed in the area in accordance with NFPA 10 and a standpipe hose station is located in the Auxiliary Building Hallway which is adjacent to and accessible from this area. Smoke detectors tied to the existing Auxiliary Building fire detection system will be installed throughout the EER which will alarm/annunciate in the Main Control Room at the existing main fire alarm panel C39A.
No additional fire protection features have been provided for the existing Auxiliary Building. Fire detection systems for electrical equipment located in other areas of the plant are existing and will not be modified.
rnqf p. ddt