| issue date = 12/23/1985
| issue date = 12/23/1985
| title = Requests Concurrence for Performing Hot Functional Testing & Reduced Duration Peak Pressure Integrated Leakage Rate Testing by 860115.Containment Atmosphere Stabilization Criteria of Section 2.3.A of BN-TOP-1 Will Be Used
| title = Requests Concurrence for Performing Hot Functional Testing & Reduced Duration Peak Pressure Integrated Leakage Rate Testing by 860115.Containment Atmosphere Stabilization Criteria of Section 2.3.A of BN-TOP-1 Will Be Used
| author name = ZIMMERMAN S R
| author name = Zimmerman S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULA Y INFORMATION DISTRIBUTIO YSTEN (BIDS)ACCESSI5lN NBR: 8512310254 DOC.DATE: 85/12/23 NOTARIZED:
{{#Wiki_filter:REGULA     Y INFORMATION     DISTRIBUTIO       YSTEN   (BIDS)
NO DOCKET I FACIE".: 50-400 Shearon Harris Nuclear Power Plant~Unit ii Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ZINNERMAN>
ACCESSI5lN NBR: 8512310254         DOC. DATE:   85/12/23 FACIE".: 50-400 Shearon Harris Nuclear Power Plant~ Unit NOTARIZED: NO ii Carolina DOCKET 05000400 I
S.R.Carolina Polller Zc Light Co.RECIP.NANE RECIPIENT AFFILIATION DENTON, H.R.Off ice of-Nuclear Reactor Regulation.
AUTH. NAME           AUTHOR AFFILIATION ZINNERMAN> S. R.     Carolina Polller Zc Light Co.
Director (p ost 851125  
RECIP. NANE           RECIPIENT AFFILIATION DENTON, H. R.         Office of- Nuclear Reactor Regulation.           Director (p ost 851125


==SUBJECT:==
==SUBJECT:==
Requests concurrence for performing hot ('nctional testing 8c reduced duration peak pressure integrated leakage rate testing bg 860115.Containment atmosphere s tab lizati:on criteria of Section 2.3.A of BN-TOP-1 vill be used.DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: Licensing Submittal:
Requests concurrence for performing hot ('nctional testing 8c reduced   duration peak pressure integrated leakage rate testing bg 860115. Containment atmosphere s tab lizati:on criteria of Section     2. 3. A of BN-TOP-1   vill be   used.
PSAR/FSAR Amdts Zc Related Correspondence NOTES: RECIPIENT ID CODE/NAI'IE PNR-A ADTS PMR-A PD2 LA INTERNAL.ACRS 41 ELD/HDSi IE/DEPER/EPB 36 NRR BMR ADTS NRR PNR-B ADTS NRR/DHFT/HFIB NRR/D IR 04 RN/DDANI/MIB EXTERNAL.24X DNB/DSS (ANDTS)NRC PDR 02 PNL GRUEL, R COPIES LTTR ENCL 1 6 1 1 1 1 0 1 0 1 1 1 1 1 RECIPIENT ID CODE/NANE P4IR-A PD2 PD BUCKLEY'S B 01 ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PMR-A ADTS NRR ROE.N.L NRR/DHFT/MTB NRR/DSRO/RRAB RQN2 BNL(ANDTS ONLY)LPDR 03 NSIC 05;COPIES LTTR ENCL~p', QFl gP Q~lla~CI pl CSB'P~tE, CG iffy W~(l (.B~~t'~~(kt:T~O~QP(Q TOTAL NURSER OF COPIES RESUTRED: LTTR Q ENCL  
DISTRIBUTION CODE: B001D         COPIES RECEIVED: LTR         ENCL       SIZE:
'N Nh" N Nri'>>)NRR'I/l I'~N)j D D h I'I I N Ir'NjN l,a (NUN Ntj'N I N,'l N N, Nl'jl I I)rh't'NSI al<<'I R rl't)t')RI"'r ,'IUI'a)lj'l)~I')(4 It I'(I"41+h;D IUD'I Nj'I'j()Q,g<<NII'4~)'<<p f~3(S R I I lt Ntt)I" (.I, II I ,'R,'3" ail N S'ad'(Su I ll hh<<N j I" SN tl>>I 4~I D/NR<<N t" jj N I ga"j;.<<'Ijj, ih.'N N I I I'N nu, f<<j\I~<<li)ljWC'ISD~S D<<,*X Sll/NI N~)''II N N',j<Nr))D hr IS ll<<t 4~Nh I bf'<<i SR 4" (>>S!"<<">>>NN ji r I>>~L R.AN~'I(II<<O'I y'j g Nj>>~R~P,<<jg f<<t~N$/>>IN't g Q~IN J I*, 4 ui I~R4f~f~ge, 4~I , RD'(('!S(II~a  
TITLE: Licensing     Submittal: PSAR/FSAR Amdts Zc       Related Correspondence NOTES:
@ME Carolina Power&Light Company CB 3 IS85 SERIAL: NLS-85-()88 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 INTEGRATED LEAKAGE RATE TESTING  
RECIPIENT         COPIES              RECIPIENT              COPIES ID CODE/NAI'IE     LTTR ENCL          ID CODE/NANE          LTTR ENCL PNR-A ADTS             1              P4IR-A PD2 PD PMR-A PD2 LA                           BUCKLEY'S B      01 INTERNAL. ACRS               41     6              ADN/LFNB ELD/HDSi               1              IE FILE IE/DEPER/EPB 36         1       1     IE/DGAVT/GAB 21 NRR BMR ADTS            1      0      NRR PMR-A ADTS NRR PNR-B ADTS          1      0      NRR ROE. N. L NRR/DHFT/HFIB          1      1      NRR/DHFT/MTB NRR/D      IR          1              NRR/DSRO/RRAB 04      1              RQN2 RN/DDANI/MIB            1 EXTERNAL. 24X                                      BNL(ANDTS ONLY) p',
DNB/DSS (ANDTS)                        LPDR             03 NRC PDR        02                    NSIC             05; PNL GRUEL,  R
                                ~
QFl gP             Q~lla~           CI pl CSB
                                        'P~tE,         CG     iffy W~(l
(.B~~t'~~
( kt:T~O ~QP(
Q TOTAL NURSER OF COPIES RESUTRED:           LTTR   Q   ENCL
 
                                                                      'N         Nh"     N           Nri'>>)       NRR'I       /l   I'   ~
N)j                                                                                                     Ntj D
D         h I'             II                                N Ir'           NjN
                                                                                                                          'N II                      R I
N,                                                     )rh't'NSI
                                                                                                                                      'l        N    N, al <<
                                                                                                                                                                                                                'I rl' l,a                      (NUN Nl' t
jl
      )   t     '
                                )RI                 a)   lj'                                                                                     )Q,g<<NII'                      4 ~
                                                                                                                                                                                        )
                                                                                                                                    'j(
                    "'r                                                                    (4
                                                                                                ~
It I')
I '( I "41 Nj'I
            , 'IUI' l)                             IUD  'I                +  h;D
<<                                             p                             f~ 3(S         R I,     II                                       ,'R,'3"           ail   N         'ad'(
I I          lt      Ntt)    I" (.
I                                                             S I"SN     tl>>
I     ~
ll      hh<<      N j                4 I
D/ NR<<
Su I
N I   ga "j;.                                                                                           nu,        f<<    j N
                                                                        <<'Ijj,                                                                                                     <<   li
                                                                                                                                                                                          \       I   ~
ih.'N                                                                                                              )ljWC'ISD N
t"    jj
                                                                                                                                                                            ~ S X
D Sll/NI N
I  I I'N
                                                                                                                                                                                    ~     )''II       N
                                                                                                                                                                                  ',j   <
N              Nr))D
                                                                                                                                                                                          <<t   4~   Nh
                                                                                                                                                                                                              <<    ">>>  NN ji hr                                                                                                                                                        I   bf'<<i IS ll                                                                                                          SR 4"
(>>S!"
r                                                                  >>
Nj L
I(
I>> ~
II<< O'I           y       'j R.AN ~ '
g                         ~R
                                                                  ~ P,           <<jg       f<<
t                                                                     ~
N
                                                                                                                                                    $   /         >>
IN   't       g Q     ~   IN J
I 4 ui
                                                                                                                            *, I
              ~ R4f~f ~                                                                                   ge,               ~
4 I
RD'(('!
II S(
                                                                            ~ a
 
                                            @ME Carolina Power & Light Company CB 3 IS85                         SERIAL: NLS-85-()88 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC     20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 INTEGRATED LEAKAGE RATE TESTING
 
==Dear Mr. Denton:==
 
Carolina Power 2 Light Company (CP(t(L) will perform Integrated Leakage Rate Testing (ILRT) on the Shearon Harris Nuclear Power Plant approximately two weeks after the completion of Hot Functional Testing (HFT). We request your concurrence to perform a reduced duration peak pressure ILRT to satisfy the requirements of-10 CFR 50, Appendix 3. 3ustification for this test is discussed in Bechtel Topical Report BN-TOP-I, "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Rev. 1." The containment atmosphere stabilization criteria of Section 2.3.A of BN-TOP-1 will be used. To determine the duration of the ILRT, the criteria discussed in Section 2.3 of BN-TOP-I will be used with the following exception:
The end of test upper 9596 confidence limit for both the least squares fit calculated leak rate based on Total Time calculations and the least squares fit based on mass-point calculations, plus penalty leakages, shall be less than 0.75 La.
To support our current schedule for HFT and ILRT, we request your concurrance with the test method outlined above by 3anuary 15, 1986. If you have any questions concerning this subject or require additional information, please contact me.
Yours very truly, S. R. Zi      erman Manager Nuclear Licensing Section SRZ/GAS/crs (3125GAS)
CC:    Mr. B. C. Buckley (NRC)                                Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                          Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII)                          Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)                              Mr. G. O. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)                        Dr. 3. H. Carpenter (ASLB)        -
Wake County Public Library                            Mr. 3. L. Kelley (ASLB)        AD    J. Knight (Itr only)
EB (BALLARD)
Mr. 3. Huang (NRC)                                    Mr. H. A. Cole                EICSB (ROSA)
PSB (OAMMILL)
RSB (BERLINGER) iio  SOB  (BENAROYA) 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602


==Dear Mr.Denton:==
Carolina Power 2 Light Company (CP(t(L)will perform Integrated Leakage Rate Testing (ILRT)on the Shearon Harris Nuclear Power Plant approximately two weeks after the completion of Hot Functional Testing (HFT).We request your concurrence to perform a reduced duration peak pressure ILRT to satisfy the requirements of-10 CFR 50, Appendix 3.3ustification for this test is discussed in Bechtel Topical Report BN-TOP-I,"Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Rev.1." The containment atmosphere stabilization criteria of Section 2.3.A of BN-TOP-1 will be used.To determine the duration of the ILRT, the criteria discussed in Section 2.3 of BN-TOP-I will be used with the following exception:
The end of test upper 9596 confidence limit for both the least squares fit calculated leak rate based on Total Time calculations and the least squares fit based on mass-point calculations, plus penalty leakages, shall be less than 0.75 La.To support our current schedule for HFT and ILRT, we request your concurrance with the test method outlined above by 3anuary 15, 1986.If you have any questions concerning this subject or require additional information, please contact me.Yours very truly, SRZ/GAS/crs (3125GAS)S.R.Zi erman Manager Nuclear Licensing Section CC: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
Dr.3.Nelson Grace (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Wake County Public Library Mr.3.Huang (NRC)Mr.Wells Eddleman Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.3.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)Mr.H.A.Cole iio 411 Fayettevilte Street o P.O.Box 1551 o Raleigh, N.C.27602 AD-J.Knight (Itr only)EB (BALLARD)EICSB (ROSA)PSB (OAMMILL)RSB (BERLINGER)
SOB (BENAROYA)
P}}
P}}

Latest revision as of 19:19, 3 February 2020

Requests Concurrence for Performing Hot Functional Testing & Reduced Duration Peak Pressure Integrated Leakage Rate Testing by 860115.Containment Atmosphere Stabilization Criteria of Section 2.3.A of BN-TOP-1 Will Be Used
ML18019A501
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/23/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-85-488, NUDOCS 8512310254
Download: ML18019A501 (4)


Text

REGULA Y INFORMATION DISTRIBUTIO YSTEN (BIDS)

ACCESSI5lN NBR: 8512310254 DOC. DATE: 85/12/23 FACIE".: 50-400 Shearon Harris Nuclear Power Plant~ Unit NOTARIZED: NO ii Carolina DOCKET 05000400 I

AUTH. NAME AUTHOR AFFILIATION ZINNERMAN> S. R. Carolina Polller Zc Light Co.

RECIP. NANE RECIPIENT AFFILIATION DENTON, H. R. Office of- Nuclear Reactor Regulation. Director (p ost 851125

SUBJECT:

Requests concurrence for performing hot ('nctional testing 8c reduced duration peak pressure integrated leakage rate testing bg 860115. Containment atmosphere s tab lizati:on criteria of Section 2. 3. A of BN-TOP-1 vill be used.

DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Licensing Submittal: PSAR/FSAR Amdts Zc Related Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAI'IE LTTR ENCL ID CODE/NANE LTTR ENCL PNR-A ADTS 1 P4IR-A PD2 PD PMR-A PD2 LA BUCKLEY'S B 01 INTERNAL. ACRS 41 6 ADN/LFNB ELD/HDSi 1 IE FILE IE/DEPER/EPB 36 1 1 IE/DGAVT/GAB 21 NRR BMR ADTS 1 0 NRR PMR-A ADTS NRR PNR-B ADTS 1 0 NRR ROE. N. L NRR/DHFT/HFIB 1 1 NRR/DHFT/MTB NRR/D IR 1 NRR/DSRO/RRAB 04 1 RQN2 RN/DDANI/MIB 1 EXTERNAL. 24X BNL(ANDTS ONLY) p',

DNB/DSS (ANDTS) LPDR 03 NRC PDR 02 NSIC 05; PNL GRUEL, R

~

QFl gP Q~lla~ CI pl CSB

'P~tE, CG iffy W~(l

(.B~~t'~~

( kt:T~O ~QP(

Q TOTAL NURSER OF COPIES RESUTRED: LTTR Q ENCL

'N Nh" N Nri'>>) NRR'I /l I' ~

N)j Ntj D

D h I' II N Ir' NjN

'N II R I

N, )rh't'NSI

'l N N, al <<

'I rl' l,a (NUN Nl' t

jl

) t '

)RI a) lj' )Q,g<<NII' 4 ~

)

'j(

"'r (4

~

It I')

I '( I "41 Nj'I

, 'IUI' l) IUD 'I + h;D

<< p f~ 3(S R I, II ,'R,'3" ail N 'ad'(

I I lt Ntt) I" (.

I S I"SN tl>>

I ~

ll hh<< N j 4 I

D/ NR<<

Su I

N I ga "j;. nu, f<< j N

<<'Ijj, << li

\ I ~

ih.'N )ljWC'ISD N

t" jj

~ S X

D Sll/NI N

I I I'N

~ )II N

',j <

N Nr))D

<<t 4~ Nh

<< ">>> NN ji hr I bf'<>S!"

r >>

Nj L

I(

I>> ~

II<< O'I y 'j R.AN ~ '

g ~R

~ P, <<jg f<<

t ~

N

$ / >>

IN 't g Q ~ IN J

I 4 ui

  • , I

~ R4f~f ~ ge, ~

4 I

RD'(('!

II S(

~ a

@ME Carolina Power & Light Company CB 3 IS85 SERIAL: NLS-85-()88 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 INTEGRATED LEAKAGE RATE TESTING

Dear Mr. Denton:

Carolina Power 2 Light Company (CP(t(L) will perform Integrated Leakage Rate Testing (ILRT) on the Shearon Harris Nuclear Power Plant approximately two weeks after the completion of Hot Functional Testing (HFT). We request your concurrence to perform a reduced duration peak pressure ILRT to satisfy the requirements of-10 CFR 50, Appendix 3. 3ustification for this test is discussed in Bechtel Topical Report BN-TOP-I, "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Rev. 1." The containment atmosphere stabilization criteria of Section 2.3.A of BN-TOP-1 will be used. To determine the duration of the ILRT, the criteria discussed in Section 2.3 of BN-TOP-I will be used with the following exception:

The end of test upper 9596 confidence limit for both the least squares fit calculated leak rate based on Total Time calculations and the least squares fit based on mass-point calculations, plus penalty leakages, shall be less than 0.75 La.

To support our current schedule for HFT and ILRT, we request your concurrance with the test method outlined above by 3anuary 15, 1986. If you have any questions concerning this subject or require additional information, please contact me.

Yours very truly, S. R. Zi erman Manager Nuclear Licensing Section SRZ/GAS/crs (3125GAS)

CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB) -

Wake County Public Library Mr. 3. L. Kelley (ASLB) AD J. Knight (Itr only)

EB (BALLARD)

Mr. 3. Huang (NRC) Mr. H. A. Cole EICSB (ROSA)

PSB (OAMMILL)

RSB (BERLINGER) iio SOB (BENAROYA) 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602

P