| issue date = 12/23/1985 | | issue date = 12/23/1985 | ||
| title = Requests Concurrence for Performing Hot Functional Testing & Reduced Duration Peak Pressure Integrated Leakage Rate Testing by 860115.Containment Atmosphere Stabilization Criteria of Section 2.3.A of BN-TOP-1 Will Be Used | | title = Requests Concurrence for Performing Hot Functional Testing & Reduced Duration Peak Pressure Integrated Leakage Rate Testing by 860115.Containment Atmosphere Stabilization Criteria of Section 2.3.A of BN-TOP-1 Will Be Used | ||
| author name = | | author name = Zimmerman S | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = Denton H | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000400 | | docket = 05000400 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULA Y INFORMATION DISTRIBUTIO YSTEN (BIDS)ACCESSI5lN NBR: 8512310254 DOC.DATE: 85/12/23 | {{#Wiki_filter:REGULA Y INFORMATION DISTRIBUTIO YSTEN (BIDS) | ||
ACCESSI5lN NBR: 8512310254 DOC. DATE: 85/12/23 FACIE".: 50-400 Shearon Harris Nuclear Power Plant~ Unit NOTARIZED: NO ii Carolina DOCKET 05000400 I | |||
S.R.Carolina Polller Zc Light Co.RECIP.NANE RECIPIENT AFFILIATION DENTON, H.R. | AUTH. NAME AUTHOR AFFILIATION ZINNERMAN> S. R. Carolina Polller Zc Light Co. | ||
Director (p ost 851125 | RECIP. NANE RECIPIENT AFFILIATION DENTON, H. R. Office of- Nuclear Reactor Regulation. Director (p ost 851125 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Requests concurrence for performing hot ('nctional testing 8c reduced duration peak pressure integrated leakage rate testing bg 860115.Containment atmosphere s tab lizati:on criteria of Section 2.3.A of BN-TOP-1 vill be used.DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: Licensing Submittal: | Requests concurrence for performing hot ('nctional testing 8c reduced duration peak pressure integrated leakage rate testing bg 860115. Containment atmosphere s tab lizati:on criteria of Section 2. 3. A of BN-TOP-1 vill be used. | ||
PSAR/FSAR Amdts Zc Related Correspondence NOTES: RECIPIENT ID CODE/NAI'IE PNR-A ADTS PMR-A PD2 LA INTERNAL.ACRS 41 ELD/HDSi IE/DEPER/EPB 36 | DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE: | ||
'N Nh" N Nri'>>)NRR'I/l I'~N)j D D h I' | TITLE: Licensing Submittal: PSAR/FSAR Amdts Zc Related Correspondence NOTES: | ||
@ME Carolina Power&Light Company CB 3 IS85 SERIAL: NLS-85-()88 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 INTEGRATED LEAKAGE RATE TESTING | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAI'IE LTTR ENCL ID CODE/NANE LTTR ENCL PNR-A ADTS 1 P4IR-A PD2 PD PMR-A PD2 LA BUCKLEY'S B 01 INTERNAL. ACRS 41 6 ADN/LFNB ELD/HDSi 1 IE FILE IE/DEPER/EPB 36 1 1 IE/DGAVT/GAB 21 NRR BMR ADTS 1 0 NRR PMR-A ADTS NRR PNR-B ADTS 1 0 NRR ROE. N. L NRR/DHFT/HFIB 1 1 NRR/DHFT/MTB NRR/D IR 1 NRR/DSRO/RRAB 04 1 RQN2 RN/DDANI/MIB 1 EXTERNAL. 24X BNL(ANDTS ONLY) p', | ||
DNB/DSS (ANDTS) LPDR 03 NRC PDR 02 NSIC 05; PNL GRUEL, R | |||
~ | |||
QFl gP Q~lla~ CI pl CSB | |||
'P~tE, CG iffy W~(l | |||
(.B~~t'~~ | |||
( kt:T~O ~QP( | |||
Q TOTAL NURSER OF COPIES RESUTRED: LTTR Q ENCL | |||
'N Nh" N Nri'>>) NRR'I /l I' ~ | |||
N)j Ntj D | |||
D h I' II N Ir' NjN | |||
'N II R I | |||
N, )rh't'NSI | |||
'l N N, al << | |||
'I rl' l,a (NUN Nl' t | |||
jl | |||
) t ' | |||
)RI a) lj' )Q,g<<NII' 4 ~ | |||
) | |||
'j( | |||
"'r (4 | |||
~ | |||
It I') | |||
I '( I "41 Nj'I | |||
, 'IUI' l) IUD 'I + h;D | |||
<< p f~ 3(S R I, II ,'R,'3" ail N 'ad'( | |||
I I lt Ntt) I" (. | |||
I S I"SN tl>> | |||
I ~ | |||
ll hh<< N j 4 I | |||
D/ NR<< | |||
Su I | |||
N I ga "j;. nu, f<< j N | |||
<<'Ijj, << li | |||
\ I ~ | |||
ih.'N )ljWC'ISD N | |||
t" jj | |||
~ S X | |||
D Sll/NI N | |||
I I I'N | |||
~ )''II N | |||
',j < | |||
N Nr))D | |||
<<t 4~ Nh | |||
<< ">>> NN ji hr I bf'<<i IS ll SR 4" | |||
(>>S!" | |||
r >> | |||
Nj L | |||
I( | |||
I>> ~ | |||
II<< O'I y 'j R.AN ~ ' | |||
g ~R | |||
~ P, <<jg f<< | |||
t ~ | |||
N | |||
$ / >> | |||
IN 't g Q ~ IN J | |||
I 4 ui | |||
*, I | |||
~ R4f~f ~ ge, ~ | |||
4 I | |||
RD'(('! | |||
II S( | |||
~ a | |||
@ME Carolina Power & Light Company CB 3 IS85 SERIAL: NLS-85-()88 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 INTEGRATED LEAKAGE RATE TESTING | |||
==Dear Mr. Denton:== | |||
Carolina Power 2 Light Company (CP(t(L) will perform Integrated Leakage Rate Testing (ILRT) on the Shearon Harris Nuclear Power Plant approximately two weeks after the completion of Hot Functional Testing (HFT). We request your concurrence to perform a reduced duration peak pressure ILRT to satisfy the requirements of-10 CFR 50, Appendix 3. 3ustification for this test is discussed in Bechtel Topical Report BN-TOP-I, "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Rev. 1." The containment atmosphere stabilization criteria of Section 2.3.A of BN-TOP-1 will be used. To determine the duration of the ILRT, the criteria discussed in Section 2.3 of BN-TOP-I will be used with the following exception: | |||
The end of test upper 9596 confidence limit for both the least squares fit calculated leak rate based on Total Time calculations and the least squares fit based on mass-point calculations, plus penalty leakages, shall be less than 0.75 La. | |||
To support our current schedule for HFT and ILRT, we request your concurrance with the test method outlined above by 3anuary 15, 1986. If you have any questions concerning this subject or require additional information, please contact me. | |||
Yours very truly, S. R. Zi erman Manager Nuclear Licensing Section SRZ/GAS/crs (3125GAS) | |||
CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB) | |||
Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB) - | |||
Wake County Public Library Mr. 3. L. Kelley (ASLB) AD J. Knight (Itr only) | |||
EB (BALLARD) | |||
Mr. 3. Huang (NRC) Mr. H. A. Cole EICSB (ROSA) | |||
PSB (OAMMILL) | |||
RSB (BERLINGER) iio SOB (BENAROYA) 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602 | |||
P}} | P}} |
Latest revision as of 19:19, 3 February 2020
ML18019A501 | |
Person / Time | |
---|---|
Site: | Harris ![]() |
Issue date: | 12/23/1985 |
From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
References | |
NLS-85-488, NUDOCS 8512310254 | |
Download: ML18019A501 (4) | |
Text
REGULA Y INFORMATION DISTRIBUTIO YSTEN (BIDS)
ACCESSI5lN NBR: 8512310254 DOC. DATE: 85/12/23 FACIE".: 50-400 Shearon Harris Nuclear Power Plant~ Unit NOTARIZED: NO ii Carolina DOCKET 05000400 I
AUTH. NAME AUTHOR AFFILIATION ZINNERMAN> S. R. Carolina Polller Zc Light Co.
RECIP. NANE RECIPIENT AFFILIATION DENTON, H. R. Office of- Nuclear Reactor Regulation. Director (p ost 851125
SUBJECT:
Requests concurrence for performing hot ('nctional testing 8c reduced duration peak pressure integrated leakage rate testing bg 860115. Containment atmosphere s tab lizati:on criteria of Section 2. 3. A of BN-TOP-1 vill be used.
DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Licensing Submittal: PSAR/FSAR Amdts Zc Related Correspondence NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAI'IE LTTR ENCL ID CODE/NANE LTTR ENCL PNR-A ADTS 1 P4IR-A PD2 PD PMR-A PD2 LA BUCKLEY'S B 01 INTERNAL. ACRS 41 6 ADN/LFNB ELD/HDSi 1 IE FILE IE/DEPER/EPB 36 1 1 IE/DGAVT/GAB 21 NRR BMR ADTS 1 0 NRR PMR-A ADTS NRR PNR-B ADTS 1 0 NRR ROE. N. L NRR/DHFT/HFIB 1 1 NRR/DHFT/MTB NRR/D IR 1 NRR/DSRO/RRAB 04 1 RQN2 RN/DDANI/MIB 1 EXTERNAL. 24X BNL(ANDTS ONLY) p',
DNB/DSS (ANDTS) LPDR 03 NRC PDR 02 NSIC 05; PNL GRUEL, R
~
QFl gP Q~lla~ CI pl CSB
'P~tE, CG iffy W~(l
(.B~~t'~~
( kt:T~O ~QP(
Q TOTAL NURSER OF COPIES RESUTRED: LTTR Q ENCL
'N Nh" N Nri'>>) NRR'I /l I' ~
N)j Ntj D
D h I' II N Ir' NjN
'N II R I
N, )rh't'NSI
'l N N, al <<
'I rl' l,a (NUN Nl' t
jl
) t '
)RI a) lj' )Q,g<<NII' 4 ~
)
'j(
"'r (4
~
It I')
I '( I "41 Nj'I
, 'IUI' l) IUD 'I + h;D
<< p f~ 3(S R I, II ,'R,'3" ail N 'ad'(
I I lt Ntt) I" (.
I S I"SN tl>>
I ~
ll hh<< N j 4 I
D/ NR<<
Su I
N I ga "j;. nu, f<< j N
<<'Ijj, << li
\ I ~
ih.'N )ljWC'ISD N
t" jj
~ S X
D Sll/NI N
I I I'N
~ )II N
',j <
N Nr))D
<<t 4~ Nh
<< ">>> NN ji hr I bf'<>S!"
r >>
Nj L
I(
I>> ~
II<< O'I y 'j R.AN ~ '
g ~R
~ P, <<jg f<<
t ~
N
$ / >>
IN 't g Q ~ IN J
I 4 ui
- , I
~ R4f~f ~ ge, ~
4 I
RD'(('!
II S(
~ a
@ME Carolina Power & Light Company CB 3 IS85 SERIAL: NLS-85-()88 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 INTEGRATED LEAKAGE RATE TESTING
Dear Mr. Denton:
Carolina Power 2 Light Company (CP(t(L) will perform Integrated Leakage Rate Testing (ILRT) on the Shearon Harris Nuclear Power Plant approximately two weeks after the completion of Hot Functional Testing (HFT). We request your concurrence to perform a reduced duration peak pressure ILRT to satisfy the requirements of-10 CFR 50, Appendix 3. 3ustification for this test is discussed in Bechtel Topical Report BN-TOP-I, "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Rev. 1." The containment atmosphere stabilization criteria of Section 2.3.A of BN-TOP-1 will be used. To determine the duration of the ILRT, the criteria discussed in Section 2.3 of BN-TOP-I will be used with the following exception:
The end of test upper 9596 confidence limit for both the least squares fit calculated leak rate based on Total Time calculations and the least squares fit based on mass-point calculations, plus penalty leakages, shall be less than 0.75 La.
To support our current schedule for HFT and ILRT, we request your concurrance with the test method outlined above by 3anuary 15, 1986. If you have any questions concerning this subject or require additional information, please contact me.
Yours very truly, S. R. Zi erman Manager Nuclear Licensing Section SRZ/GAS/crs (3125GAS)
CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB) -
Wake County Public Library Mr. 3. L. Kelley (ASLB) AD J. Knight (Itr only)
EB (BALLARD)
Mr. 3. Huang (NRC) Mr. H. A. Cole EICSB (ROSA)
PSB (OAMMILL)
RSB (BERLINGER) iio SOB (BENAROYA) 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602
P