Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ  
 
ML15062A379  SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15 Page 1 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/2016ISFSI-ISFSI DRY RUN AND INITIAL LOADING31, 2 IPPreoperational Testing Of An ISFSI6085401/05/201501/09/20151, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.101/05/201501/09/20151, 2 IPOperation Of An ISFSI6085501/12/201501/16/20151, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.101/12/201501/16/20157111111B-U2 REQUAL INSP W/ P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B06/15/201506/19/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0105/04/201505/08/20151, 2 IPOccupational ALARA Planning and Controls71124.0205/04/201505/08/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/04/201505/08/20151, 2 IPOccupational Dose Assessment71124.0405/04/201505/08/20157111108P-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P05/04/201505/15/201571003-LR COMMITMENTS PHASE I OUTAGE INSP21 IPPost-Approval Site Inspection for License Renewal7100305/11/201505/15/2015PI&R-PI&R BIENNIAL41, 2 IPProblem Identification and Resolution71152B06/08/201506/12/20151, 2 IPProblem Identification and Resolution71152B06/22/201506/26/2015EP-EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140206/29/201507/02/20151, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/29/201507/02/20151, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/29/201507/02/201571124.07-RAD SAFETY INSPECTION11, 2 IPRadiological Environmental Monitoring Program71124.0707/06/201507/10/20151, 2 IPPerformance Indicator Verification7115107/06/201507/10/2015TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION61, 2 IPFire Protection [Triennial]7111105T08/03/201508/07/20151, 2 IPFire Protection [Triennial]7111105T08/17/201508/21/201512/7EXAM-U2 INITIAL OL EXAM3 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190611/09/201511/13/2015 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190612/07/201512/18/201571003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100308/31/201509/04/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/201671003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100309/14/201509/18/20157111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P10/05/201510/16/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151, 2 IPOccupational ALARA Planning and Controls71124.0210/19/201510/23/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/201510/23/20151, 2 IPOccupational Dose Assessment71124.0410/19/201510/23/20151, 2 IPRadiation Monitoring Instrumentation71124.0510/19/201510/23/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/14/201512/18/20151, 2 IPOccupational ALARA Planning and Controls71124.0212/14/201512/18/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/14/201512/18/20151, 2 IPOccupational Dose Assessment71124.0412/14/201512/18/20151, 2 IPPerformance Indicator Verification7115112/14/201512/18/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/20161, 2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/20161, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/20161, 2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016EP-EP EXERCISE EVALUATION41, 2 IPExercise Evaluation711140106/13/201606/17/20167111107T-TRIENNIAL HEAT SINK11, 2 IPHeat Sink Performance7111107T05/16/201605/20/20167111117T-PERMANENT PLANT MODIFICATIONS11, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 13:14, 14 June 2018

ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001)
ML15062A379
Person / Time
Site: Beaver Valley
Issue date: 03/04/2015
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Larson E A
FirstEnergy Nuclear Operating Co
KENNEDY, SR
Shared Package
ML15049A479 List:
References
IR 2014001
Download: ML15062A379 (5)


Text

March 4, 2015

Mr. Eric Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077-0004

SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)

Dear Mr. Larson:

On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs inspections at your facility. The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station Unit Nos. 1 and 2 during the most recent quarter was wProcess (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60854.1, months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design--12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site has been scheduled for the week of July 20, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal RegulationsPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73

Enclosure:

Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15062A379 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15 Page 1 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/2016ISFSI-ISFSI DRY RUN AND INITIAL LOADING31, 2 IPPreoperational Testing Of An ISFSI6085401/05/201501/09/20151, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.101/05/201501/09/20151, 2 IPOperation Of An ISFSI6085501/12/201501/16/20151, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.101/12/201501/16/20157111111B-U2 REQUAL INSP W/ P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B06/15/201506/19/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0105/04/201505/08/20151, 2 IPOccupational ALARA Planning and Controls71124.0205/04/201505/08/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/04/201505/08/20151, 2 IPOccupational Dose Assessment71124.0405/04/201505/08/20157111108P-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P05/04/201505/15/201571003-LR COMMITMENTS PHASE I OUTAGE INSP21 IPPost-Approval Site Inspection for License Renewal7100305/11/201505/15/2015PI&R-PI&R BIENNIAL41, 2 IPProblem Identification and Resolution71152B06/08/201506/12/20151, 2 IPProblem Identification and Resolution71152B06/22/201506/26/2015EP-EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140206/29/201507/02/20151, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/29/201507/02/20151, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/29/201507/02/201571124.07-RAD SAFETY INSPECTION11, 2 IPRadiological Environmental Monitoring Program71124.0707/06/201507/10/20151, 2 IPPerformance Indicator Verification7115107/06/201507/10/2015TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION61, 2 IPFire Protection [Triennial]7111105T08/03/201508/07/20151, 2 IPFire Protection [Triennial]7111105T08/17/201508/21/201512/7EXAM-U2 INITIAL OL EXAM3 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190611/09/201511/13/2015 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190612/07/201512/18/201571003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100308/31/201509/04/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/201671003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100309/14/201509/18/20157111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P10/05/201510/16/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151, 2 IPOccupational ALARA Planning and Controls71124.0210/19/201510/23/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/201510/23/20151, 2 IPOccupational Dose Assessment71124.0410/19/201510/23/20151, 2 IPRadiation Monitoring Instrumentation71124.0510/19/201510/23/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/14/201512/18/20151, 2 IPOccupational ALARA Planning and Controls71124.0212/14/201512/18/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/14/201512/18/20151, 2 IPOccupational Dose Assessment71124.0412/14/201512/18/20151, 2 IPPerformance Indicator Verification7115112/14/201512/18/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/20161, 2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/20161, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/20161, 2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016EP-EP EXERCISE EVALUATION41, 2 IPExercise Evaluation711140106/13/201606/17/20167111107T-TRIENNIAL HEAT SINK11, 2 IPHeat Sink Performance7111107T05/16/201605/20/20167111117T-PERMANENT PLANT MODIFICATIONS11, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.