Line 32: |
Line 32: |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
| Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ | | Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ |
| | |
| | ML15062A379 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15 Page 1 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/2016ISFSI-ISFSI DRY RUN AND INITIAL LOADING31, 2 IPPreoperational Testing Of An ISFSI6085401/05/201501/09/20151, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.101/05/201501/09/20151, 2 IPOperation Of An ISFSI6085501/12/201501/16/20151, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.101/12/201501/16/20157111111B-U2 REQUAL INSP W/ P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B06/15/201506/19/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0105/04/201505/08/20151, 2 IPOccupational ALARA Planning and Controls71124.0205/04/201505/08/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/04/201505/08/20151, 2 IPOccupational Dose Assessment71124.0405/04/201505/08/20157111108P-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P05/04/201505/15/201571003-LR COMMITMENTS PHASE I OUTAGE INSP21 IPPost-Approval Site Inspection for License Renewal7100305/11/201505/15/2015PI&R-PI&R BIENNIAL41, 2 IPProblem Identification and Resolution71152B06/08/201506/12/20151, 2 IPProblem Identification and Resolution71152B06/22/201506/26/2015EP-EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140206/29/201507/02/20151, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/29/201507/02/20151, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/29/201507/02/201571124.07-RAD SAFETY INSPECTION11, 2 IPRadiological Environmental Monitoring Program71124.0707/06/201507/10/20151, 2 IPPerformance Indicator Verification7115107/06/201507/10/2015TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION61, 2 IPFire Protection [Triennial]7111105T08/03/201508/07/20151, 2 IPFire Protection [Triennial]7111105T08/17/201508/21/201512/7EXAM-U2 INITIAL OL EXAM3 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190611/09/201511/13/2015 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190612/07/201512/18/201571003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100308/31/201509/04/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| | |
| | Page 2 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/201671003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100309/14/201509/18/20157111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P10/05/201510/16/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151, 2 IPOccupational ALARA Planning and Controls71124.0210/19/201510/23/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/201510/23/20151, 2 IPOccupational Dose Assessment71124.0410/19/201510/23/20151, 2 IPRadiation Monitoring Instrumentation71124.0510/19/201510/23/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/14/201512/18/20151, 2 IPOccupational ALARA Planning and Controls71124.0212/14/201512/18/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/14/201512/18/20151, 2 IPOccupational Dose Assessment71124.0412/14/201512/18/20151, 2 IPPerformance Indicator Verification7115112/14/201512/18/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/20161, 2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/20161, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/20161, 2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016EP-EP EXERCISE EVALUATION41, 2 IPExercise Evaluation711140106/13/201606/17/20167111107T-TRIENNIAL HEAT SINK11, 2 IPHeat Sink Performance7111107T05/16/201605/20/20167111117T-PERMANENT PLANT MODIFICATIONS11, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| }} | | }} |
Revision as of 13:14, 14 June 2018
|
---|
Category:Inspection Plan
MONTHYEARIR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) ML23090A0192023-03-31031 March 2023 Information Request for the Cyber Security Baseline Inspection; Notification to Perform Inspection 05000334/2023401 and 05000412/2023401 IR 05000334/20220062023-03-0101 March 2023 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2022006 and 05000412/2022006) IR 05000334/20220052022-08-31031 August 2022 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2022005 and 05000412/2022005) IR 05000334/20210062022-03-0202 March 2022 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2021006 and 05000412/2021006) IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000334/20200062021-03-0303 March 2021 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2020006 and 05000412/2020006) IR 05000334/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000334/2020005 and 05000412/2020005) IR 05000334/20190062020-03-0303 March 2020 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2019006 and 05000412/2019006) IR 05000334/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000334/2019005 and 05000412/2019005 IR 05000334/20180062019-03-0404 March 2019 Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Reports 05000334/2018006 and 05000412/2018006) IR 05000334/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000334/2018005 and 05000412/2018005 IR 05000334/20170062018-02-28028 February 2018 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2(Reports 05000334/2017006 and 0500412/2017006; 05000334/2017402 and 05000412/2017402 and 05000334-2017501 and 05000412/2017501) ML17271A0662017-09-28028 September 2017 Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403 IR 05000334/20160062017-03-0101 March 2017 Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Report 05000334/2016006 and 05000412/2016006) with Report 22 IR 05000334/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2016005 and 05000412/2016005) IR 05000334/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 (Report 05000334/2015006 and 05000412/2015006) IR 05000334/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Beaver Valley Power Station (Report 05000334/2015005 and 05000412/2015005) IR 05000334/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001) IR 05000334/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000334/2014006 and 05000412/2014006 IR 05000334/20130012014-03-0404 March 2014 ROP-14 2013 Beaver Valley Power Station Units 1 and 2, Annual Assessment Letter, Report 05000334/2013001 and 05000412/2013001, and Inspection Plan IR 05000334/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000334/2013006 and 05000412/2013006 IR 05000334/20120012013-03-0404 March 2013 Annual Assessment Letter for Beaver Valley Units 1 and 2 (Report 05000334/2012001 and 05000412/2012001) IR 05000334/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Beaver Valley Power Station (Report 05000334/2012006 and 05000412/2012006) IR 05000334/20110012012-03-0505 March 2012 Annual Assessment Letter for Beaver Valley Power Station Units 1 and 2 (Report 05000334-11-001 and 05000412-11-001) ML1124206842011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Beaver Valley Units 1 and 2 IR 05000334/20100012011-03-0404 March 2011 Annual Assessment Letter for Beaver Valley Units 1 and 2, EOC 11 (Report 05000334/2010001 and 05000412/2010001) ML1024406392010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Beaver Valley Units 1 and 2 IR 05000334/20010012010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Beaver Valley Power Station (Beaver Valley) Units 1 and 2 (05000334-01-001 and 05000412-01-001) ML0924401272009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley Units 1 and 2 IR 05000334/20090012009-03-0404 March 2009 Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (05000334/2009001 and 05000412/2009001) ML0824704722008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley IR 05000334/20080012008-03-0303 March 2008 (05000334-08-001, 05000412-08-001), Annual Assessment Letter ML0734706972007-12-13013 December 2007 ROP 8 - Beaver Valley - Change to Inspection Plan, 12/13/07 ML0724309412007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706104772007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Beaver Valley Station ML0624305972006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Beaver Valley Power Station Units 1 and 2 ML0606201582006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (Reports 05-334-2006001 and 05-412-2006001) ML0524207222005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Beaver Valley ML0406301322004-03-0202 March 2004 2003-04 Annual Assessment Letter - Beaver Valley ML0323906412003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Beaver Valley Power Station ML0306205872003-03-0303 March 2003 2003 Annual Assessment Letter - Beaver Valley Power Station, Units 1 & 2 IR 05000334/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Beaver Valley Power Station Units 1 & 2 (Report 50-334/02-01, 50-412/02-01) 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] |
Text
March 4, 2015
Mr. Eric Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077-0004
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)
Dear Mr. Larson:
On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs inspections at your facility. The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station Unit Nos. 1 and 2 during the most recent quarter was wProcess (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60854.1, months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design--12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site has been scheduled for the week of July 20, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal RegulationsPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.
Sincerely,/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73
Enclosure:
Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML15062A379 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15 Page 1 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/2016ISFSI-ISFSI DRY RUN AND INITIAL LOADING31, 2 IPPreoperational Testing Of An ISFSI6085401/05/201501/09/20151, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.101/05/201501/09/20151, 2 IPOperation Of An ISFSI6085501/12/201501/16/20151, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.101/12/201501/16/20157111111B-U2 REQUAL INSP W/ P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B06/15/201506/19/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0105/04/201505/08/20151, 2 IPOccupational ALARA Planning and Controls71124.0205/04/201505/08/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/04/201505/08/20151, 2 IPOccupational Dose Assessment71124.0405/04/201505/08/20157111108P-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P05/04/201505/15/201571003-LR COMMITMENTS PHASE I OUTAGE INSP21 IPPost-Approval Site Inspection for License Renewal7100305/11/201505/15/2015PI&R-PI&R BIENNIAL41, 2 IPProblem Identification and Resolution71152B06/08/201506/12/20151, 2 IPProblem Identification and Resolution71152B06/22/201506/26/2015EP-EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140206/29/201507/02/20151, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/29/201507/02/20151, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/29/201507/02/201571124.07-RAD SAFETY INSPECTION11, 2 IPRadiological Environmental Monitoring Program71124.0707/06/201507/10/20151, 2 IPPerformance Indicator Verification7115107/06/201507/10/2015TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION61, 2 IPFire Protection [Triennial]7111105T08/03/201508/07/20151, 2 IPFire Protection [Triennial]7111105T08/17/201508/21/201512/7EXAM-U2 INITIAL OL EXAM3 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190611/09/201511/13/2015 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAMU0190612/07/201512/18/201571003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100308/31/201509/04/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 201/22/201508:56:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2015-06/30/201671003-LR COMMITMENTS PHASE II TEAM INSP41 IPPost-Approval Site Inspection for License Renewal7100309/14/201509/18/20157111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P10/05/201510/16/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151, 2 IPOccupational ALARA Planning and Controls71124.0210/19/201510/23/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/201510/23/20151, 2 IPOccupational Dose Assessment71124.0410/19/201510/23/20151, 2 IPRadiation Monitoring Instrumentation71124.0510/19/201510/23/201571124-RAD SAFETY INSP11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/14/201512/18/20151, 2 IPOccupational ALARA Planning and Controls71124.0212/14/201512/18/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/14/201512/18/20151, 2 IPOccupational Dose Assessment71124.0412/14/201512/18/20151, 2 IPPerformance Indicator Verification7115112/14/201512/18/201571124-RAD SAFETY INSPECTION11, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/20161, 2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/20161, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/20161, 2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016EP-EP EXERCISE EVALUATION41, 2 IPExercise Evaluation711140106/13/201606/17/20167111107T-TRIENNIAL HEAT SINK11, 2 IPHeat Sink Performance7111107T05/16/201605/20/20167111117T-PERMANENT PLANT MODIFICATIONS11, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.