IR 05000482/2017005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17242A207
| number = ML17242A207
| issue date = 08/28/2017
| issue date = 08/28/2017
| title = Updated Inspection Plan For Wolf Creek Generating Station (Report 05000482/2017005)
| title = Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005)
| author name = Taylor N H
| author name = Taylor N H
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B

Revision as of 21:50, 1 March 2018

Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005)
ML17242A207
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/28/2017
From: Taylor N H
NRC/RGN-IV/DRP/RPB-B
To: Heflin A C
Wolf Creek
NICK TAYLOR
References
IR 2017005
Download: ML17242A207 (5)


Text

August 28, 2017

Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2017005)

Dear Mr. Heflin:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Wolf Creek Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." This inspection will be conducted at Wolf Creek Generating Station to confirm the station's full implementation of Commission Orders EA-12-049 and EA-12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for A. Helflin 2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,/RA D. Proulx for/ Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket No. 05000482 License No. NPF-42

Enclosure:

Wolf Creek Generating Station Inspection Plan A. Helflin 3 UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2017005) DISTRIBUTION KKennedy, RA SMorris, DRA TPruett, DRP AVegel, DRS JClark, DRS RLantz, DRP NTaylor, DRP DProulx, DRP JMelfi, DRP DDodson, DRP FThomas, DRP SGalemore, DRP JBowen, RIV/OEDO KFuller, RC VDricks, ORA JWeil, OCA BSingal, NRR AMoreno, RIV/CAO BMaier, RSLO THipschman, IPAT EUribe, IPAT MHerrera, DRMA RIV ACES ROP Reports CMiller, NRR MKing, NRR ABoland, NRR KBrock, NRR BHolian, NSIR MBailey, NSIR DRP Branch Chiefs DRS Branch Chiefs ROP Reports Resource ROP Assessment Resource ADAMS ACCESSION NUMBER: SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA DProulx for/ DATE 8/28/17 8/28/17 OFFICIAL RECORD COPY Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWolf CreekInspection / Activity Plan07/01/2017-06/30/2019Page 1 of 208/25/2017 08:25:55INIT EXA-INITIAL EXAM51 INITIAL EXAM WOLF CREEK (11/2017)X0259710/16/201710/20/20171 INITIAL EXAM WOLF CREEK (11/2017)X0259711/06/201711/10/2017EB1-21N-WC DESIGN BASIS INSPECTION PROGRAMS31 IPDesign Bases Assurance Inspection (Programs)7111121N05/08/201707/13/2017PI&R-PI&R FOCUSED SAMPLE - SCWE21 IPIn-depth Reviews71152-Reviews08/29/201708/30/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41 IPFire Protection [Triennial]7111105T10/02/201710/06/20171 IPFire Protection [Triennial]7111105T10/16/201710/20/2017EP-2-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140111/13/201711/17/20171 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017EP-3-EP PERFORMANCE INDICATOR VERIFICATION11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/20171 IPERO Readiness71151-EP0211/13/201711/17/20171 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/2017TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE41 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19101/22/201801/26/20187111108-INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018RS 12PI-RAD SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0104/09/201804/13/20181 IPOccupational ALARA Planning and Controls71124.0204/09/201804/13/20181 IPOccupational Exposure Control Effectiveness71151-OR0104/09/201804/13/20181 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/09/201804/13/2018INSP-BRQ INSPECTION21 IPLicensed Operator Requalification Program7111111B06/04/201806/08/2018PI&R-BIENNIAL PI&R INSPECTION41 IPProblem Identification and Resolution71152B06/11/201806/15/20181 IPProblem Identification and Resolution71152B06/25/201806/29/2018EB1-21M-WC DESIGN BASES INSPECTION TEAMS61 IPDesign Bases Assurance Inspection (Teams)7111121M07/16/201808/03/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWolf CreekInspection / Activity Plan07/01/2017-06/30/2019Page 2 of 208/25/2017 08:25:55RS 5678-RAD SAFETY41 IPRadiation Monitoring Instrumentation71124.0508/20/201808/24/20181 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/20/201808/24/20181 IPRadiological Environmental Monitoring Program71124.0708/20/201808/24/20181 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/20/201808/24/2018EP-1-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140209/17/201809/21/20181 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/17/201809/21/20181 IPEmergency Action Level and Emergency Plan Changes711140409/17/201809/21/20181 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/17/201809/21/20181 IPDrill/Exercise Performance71151-EP0109/17/201809/21/20181 IPERO Readiness71151-EP0209/17/201809/21/20181 IPAlert & Notification System Reliability71151-EP0309/17/201809/21/2018EB1-17T-WOLF CREEK 10CFR50.59 INSPECTION31 IPEvaluations of Changes, Tests, and Experiments7111117T04/29/201905/03/2019RS 24-RP INSPECTION11 IPOccupational ALARA Planning and Controls71124.0205/06/201905/10/20191 IPOccupational Dose Assessment71124.0405/06/201905/10/2019EP-2-EP EXERCISE INSPECTION41 IPExercise Evaluation711140106/03/201906/07/20191 IPEmergency Action Level and Emergency Plan Changes711140406/03/201906/07/20191 IPDrill/Exercise Performance71151-EP0106/03/201906/07/20191 IPERO Readiness71151-EP0206/03/201906/07/20191 IPAlert & Notification System Reliability71151-EP0306/03/201906/07/2019EP2-EP EXERCISE AND PI INSPECTION41 IPExercise Evaluation711140106/03/201906/07/20191 IPEmergency Action Level and Emergency Plan Changes711140406/03/201906/07/20191 IPDrill/Exercise Performance71151-EP0106/03/201906/07/20191 IPERO Readiness71151-EP0206/03/201906/07/20191 IPAlert & Notification System Reliability71151-EP0306/03/201906/07/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.