| number = ML20087A089
| number = ML20087A089
| issue date = 02/15/1984
| issue date = 02/15/1984
| title = Responds to NRC 831208 Ltr Re Violations Noted in IE Insp Rept 50-293/83-23.Corrective Actions:Nop Raised Mgt Policy Issues Re Procurements Which Have Taken Longer than Expected to Resolve.Completion Expected by 840402
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-293/83-23.Corrective Actions:Nop Raised Mgt Policy Issues Re Procurements Which Have Taken Longer than Expected to Resolve.Completion Expected by 840402
| author name = Harrington W
| author name = Harrington W
| author affiliation = BOSTON EDISON CO.
| author affiliation = BOSTON EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = BEC-#84-27, BEC0-#84-027, NUDOCS 8403070341
| document report number = BEC-#84-27, BEC0-#84-027, NUDOCS 8403070341
| title reference date = 12-08-1983
| package number = ML20087A067
| package number = ML20087A067
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC

Latest revision as of 16:12, 25 September 2022

Responds to NRC Re Violations Noted in IE Insp Rept 50-293/83-23.Corrective Actions:Nop Raised Mgt Policy Issues Re Procurements Which Have Taken Longer than Expected to Resolve.Completion Expected by 840402
ML20087A089
Person / Time
Site: Pilgrim
Issue date: 02/15/1984
From: Harrington W
BOSTON EDISON CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20087A067 List:
References
BEC-#84-27, BEC0-#84-027, NUDOCS 8403070341
Download: ML20087A089 (1)


Text

- _ _ _ _ _ _ _ - _ _ _ -

e s'*

BOSTON EDISON C O M PANY 800 BOYLSTON ST Rein BOSTON, MASSADHUSETTs 02199 wituAw 0. HARRINGTON February 15, 1984 MW14.AN BECo Ltr. #84-027 Mr. Richard W. Starostecki, Director Division of Project and Resident Programs U. S. Nuclear Regulatory Commission Region 1 - 631 Park Ave.

King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293

SUBJECT:

Inspection 83-23, Notice of Violation B (INC 83-23-03)

REFERENCE:

BECo Letter to the NRC 84-001, dated 1/3/84

Dear Sir:

This letter is to provide a revised response to Violation B of the subject inspection.

The reference committed BECo to the following:

"A NOP is being prepared which will establish the require-ments for CQCI procurement and will include the requirement for preparation of a specification for procurement of each CQCI. The scheduled date for issuance is January 31, 1984."

Development of this NOP has raised management policy issues which have taken longer than expected to resolve. Although the NOP was drafted in time to support the previous commit-ment, it has undergone several cycles of revision and review to resolve the policy matters. We believe these issues are currently settled to the extent we will be able to issue the NOP by April 2, 1984.

Full compliance will be achieved with the issuance of the NOP on April 2, 1984.

If you have any questions or concerns regarding the above re-sponse, you are requested to direct them to the undersigned.

Respectfu:,iy submitted, wbh A l

William D. Harrlagton WDH/ko 840307034i 840228 PDR ADOCK 05000293 G PDR