IR 05000266/1992023: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20128A158
| number = ML20128A158
| issue date = 01/26/1993
| issue date = 01/26/1993
| title = Ack Receipt of 930107 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/92-23 & 50-301/92-23
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/92-23 & 50-301/92-23
| author name = Greenman E
| author name = Greenman E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9302020141
| document report number = NUDOCS 9302020141
| title reference date = 01-07-1993
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 01:33, 22 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/92-23 & 50-301/92-23
ML20128A158
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/26/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9302020141
Download: ML20128A158 (1)


Text

ps t'0% UNITED &T ATIs 'N hf f

,

,, ,,, NUCL( An HEGULATOnY COMMISSION la $ Hf GION nt i

E.

  • -l 199 noott va tt no Ao f Attn ELLvN. n uNoss soin

JAN 2 61993 Docket No. 50-266; 50 301 Wisconsin Electric Power Company A11N: Mr. R. Vice Frosident Nuclear Power 231 West Michi9an Street - P379 Milwaukee, WI 53201 SUBJECT: N011CE Of VIOLATION (NRC INSPEC110N REPORT No. 50-266/92023(ORP);

50-301/92023(DRP))

Dear Mr. Link:

This will acknowledge receipt of your letter dated January 7,1993, in response to our letter dated December 8,1992, transmitting a Notice of Violation associated with inspection Report No. 50-266/92023; 50-301/92023 at the Point Beach Nuclear Power Plant. We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.

/ . e c [

'f] Division of Reactor Projects

,

CC:

G. J. Maxfield, Plant Manager DCD/DCB (RID)

OC/LfDCB Resident inspector, Rill Virgil Kanable,. Chief Boller Section Cheryl L. Parrino, Chairman Wisconsin Public Service Commission Robert H. Thompson, Administrator WI Div of Emergency Govt, 9302020141 930126-PDR ADOCK 05000266 G PDR

<

/A u

/

lo; i

-, . -