IR 05000266/1992023
| ML20128A158 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/26/1993 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9302020141 | |
| Download: ML20128A158 (1) | |
Text
hf f
'N ps t'0%
UNITED &T ATIs
SUBJECT:
N011CE Of VIOLATION (NRC INSPEC110N REPORT No. 50-266/92023(ORP);
50-301/92023(DRP))
Dear Mr. Link:
This will acknowledge receipt of your letter dated January 7,1993, in response to our letter dated December 8,1992, transmitting a Notice of Violation associated with inspection Report No. 50-266/92023; 50-301/92023 at the Point Beach Nuclear Power Plant.
We have reviewed your corrective actions and have no further questions at this time.
These corrective actions will be examined during future inspections.
[
/
e c
.
'f] Division of Reactor Projects
,
CC:
G. J. Maxfield, Plant Manager DCD/DCB (RID)
OC/LfDCB Resident inspector, Rill Virgil Kanable,. Chief Boller Section Cheryl L. Parrino, Chairman Wisconsin Public Service Commission Robert H. Thompson, Administrator WI Div of Emergency Govt, 9302020141 930126-PDR ADOCK 05000266 G
/ A lo;
<
/
i u
-,
. -