IR 05000301/1992018
| ML20128F803 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/04/1993 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9302120037 | |
| Download: ML20128F803 (1) | |
Text
.
,[em "EN,$%
UNITED STATES NUCLEAR REOULATORY COMMISSION
,,
l,. (
g REGION til
.
b -)
{ j'1 c//
f r
799 ROOSEVELT ROAD
- '
/
GLEN ELLYN, ILLINOIS 60137-5027
s f(b
[
%
/
'"*'
FEB 0 41993 Wisconsin Electric Power Company ATTN: Mr. R. Vice President Nuclear Power 231 West Michigan Street - P379 Milwaukee, WI 53201 Subject: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-301/92018(DRP))
Dear Mr. Link:
This will acknowledge receipt of your letter dated January 7,1993, in response to' our letter dated December 8,1992, transmitting a Notice of Violation associated with inspection Report No. 50-301/92018 at the Point Beach Nuclear Plant, Unit 2.
We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.
Sincerely,
,
h
A. Bert Davis Regi_onal Administrator cc:
G. J. Maxfield, Plant Manager DCD/DCB (RIDS)
OC/LFDCB Resident Inspector, Rill Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman Wisconsin Public Service Commission i
Robert M. Thompson, Administrator WI Div of Emergency Govt.
i_
,
'
9302120037 930204 gh PDR ADOCK 05000301