MONTHYEARIR 05000382/20240032024-11-0808 November 2024 Integrated Inspection Report 05000382/2024003 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) 05000382/LER-2024-001-01, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-11-0707 November 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure IR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 IR 05000382/20230042024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000382/20223012022-03-28028 March 2022 NRC Examination Report 05000382/2022301 ML20307A1752020-10-19019 October 2020 NRC Examination Report 05000382/202008, ML20293A178 IR 05000382/20203012020-10-19019 October 2020 NRC Examination Report 05000382/2020301 IR 05000382/20183012018-12-14014 December 2018 NRC Examination Report 05000382/2018301 IR 05000382/20173012017-05-16016 May 2017 NRC Examination Report 05000382/2017301 IR 05000382/20153012015-11-0202 November 2015 Er 05000382/2015301; on 09/14/2015, 10/05/2015; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report IR 05000382/20143012014-05-15015 May 2014 Er 05000382-14-301; 04/02/2014 - 04/22/2014; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report IR 05000382/20123012013-01-0303 January 2013 Er 05000382-12-301, on October 1-November 19, 2012, Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report W3F1-2011-0062, Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 32011-07-24024 July 2011 Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 3 IR 05000382/20113012011-05-13013 May 2011 NRC Examination Report 05000382-11-301 IR 05000382/20103022010-11-23023 November 2010 Er 05000382/10-302, on 10/04/10 - 10/21/10; Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report IR 05000382/20103012010-05-0606 May 2010 Er 05000382-10-301 on March 16-24, 2010, Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report IR 05000382/20093012009-11-16016 November 2009 Er 05000382-09-301 on 10/05/2009 - 10/27/09 for Waterford Steam Electric Station, Unit 3 IR 05000382/20083012008-05-0101 May 2008 Er 05000382-08-301 on 03/24/08 - 04/16/08 for Waterford, Unit 3; Initial Operator Licensing Examination Report ML0808102172008-03-21021 March 2008 NRC Initial Operator Licensing Operating Test) Examination Approval (05000382/08/301) W3F1-2005-0076, Preparation and Scheduling of Operator Licensing Examinations2005-10-27027 October 2005 Preparation and Scheduling of Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000382/20033012003-09-16016 September 2003 Er 05000382-03-301, on 8/22/03 Through 28/2003, for Waterford 3, Entergy Operation Inc.; Initial Operator Licensing Examinations W3F1-2002-0014, WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations2002-01-30030 January 2002 WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations 2022-03-28
[Table view] |
Text
October 19, 2020
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC EXAMINATION REPORT 05000382/2020301
Dear Mr. Ferrick:
On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at your Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on August 20, 2020, with Mr. V. Ford, Operations Training Superintendent, and other members of your staff. A telephonic exit meeting was conducted on September 30, 2020, with Mr. J. Jarrell, Operations Manager, who was provided the NRC licensing decisions.
The examination included the evaluation of 5 applicants for reactor operator licenses, 5 applicants for instant senior reactor operator licenses, and 3 applicants for upgrade senior reactor operator licenses. The license examiners determined that all 13 applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55 and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Gregory E. Werner Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 05000382 License No. NPF-38
Enclosure:
Examination Report 05000382/2020301, w/attachment: Supplemental Information
Inspection Report
Docket Number: 05000382 License Number: NPF-38 Report Number: 05000382/2020301 Enterprise Identifier: L-2020-OLL-0020 Licensee: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, Louisiana Inspection Dates: August 17, 2020, to September 30, 2020 Inspectors: C. Osterholtz, Chief Examiner, Senior Operations Engineer N. Hernandez, Chief Examiner Under Instruction, Operations Engineer M. Kennard, Senior Operations Engineer B. Bergeon, Operations Engineer M. Doyle, Operations Engineer Approved By: Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY
Examination Report 05000382/2020301; August 17, 2020-September 30, 2020; Waterford
Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report The NRC examiners evaluated the competency of five applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses, and three applicants for upgrade senior reactor operator licenses at Waterford Steam Electric Station, Unit 3.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on August 26, 2020. The NRC examiners administered the operating tests on August 17-21, 2020.
The NRC examiners determined that all the applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES
- INITIAL LICENSE EXAM
.1 License Applications
a. Scope
The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited six of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of the operating tests.
b. Findings
The NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
The NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On August 26, 2020, the licensee proctored the administration of the written examinations to all 13 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on August 27, 2020.
The NRC examination team administered the various portions of the operating tests to all applicants on August 17-21, 2020.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted three generic weaknesses associated with applicant performance on the dynamic scenario and in-plant job performance measures sections of the operating tests. These are listed below:
1) Three of ten applicants failed to check instrument air compressor oil level at both available indications during in-plant job performance measures.
2) Two of four crews had at least one crew member that failed to read and adhere to turnover sheets.
3) Two of four crews demonstrated inconsistencies in action taken for inoperable instrument channels.
These deficiencies were captured in the licensees corrective action program as corrective action number 70 of Condition Report 2019-0315.
Post-examination analysis revealed four generic weaknesses associated with applicant performance on the written examination.
1) Question 40 - 77 percent missed it due to applicant knowledge weakness and the topic was alarms associated with containment spray.
2) Question 66 - 54 percent missed it due to applicant knowledge weakness and the topic was the ability to interpret and execute procedural steps.
3) Question 92 - 63 percent missed it due to applicant knowledge weakness and the topic was abnormal operating procedures and spent fuel pool cooling.
4) Question 97 - 75 percent missed it due to applicant knowledge weakness and the topic was the process used to track inoperable alarms.
These deficiencies were captured in the licensees corrective action program as corrective action number 69 of Condition Report 2019-0315.
Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
Exit Meeting Summary
The chief examiner presented the preliminary examination results to Mr. V. Ford, Operations Training Superintendent, and other members of the staff on August 20, 2020. A telephonic exit was conducted on September 30, 2020, between Mr. C. Osterholtz, Chief Examiner, and Mr. J. Jarrell, Operations Manager. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Jarrell, Operations Manager
- V. Ford, Operations Training Superintendent
- J. Mendoza, Lead Exam Developer
- W. Wesley, Supervisor, Operations Training
- R. Peter, Exam Writer
NRC Personnel
- F. Ramirez, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED