August 17, 2020

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SECURITY BASELINE INSPECTION REPORT 05000382/2020411

Dear Mr. Vazquez:

On August 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3, and discussed the results of this inspection with Mr. Lewis, General Manager, Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2020411

Enterprise Identifier: I-2020-411-0011

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, LA

Inspection Dates:

August 3, 2020 to August 6, 2020

Inspectors:

C. Jewett, Physical Security Inspector

R. Lanfear, Physical Security Specialist

Approved By:

Ray L. Kellar, Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Waterford Steam Electric Station,

Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: (02.09 a, 02.11 a-c, 02.12 a)
  • Tier III: (02.14, 02.14 a-b)

71130.07 - Security Training

Security Training (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: (02.05 a-d, 02.07, 02.08 a, 02.09 a-b)
  • Tier III: (02.11 a, 02.012 a-b, 02.13 a)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 6, 2020, the inspectors presented the security baseline inspection results to Mr.

Lewis, General Manager, Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

CR-WF3-2018-05756; CR-WF3-2018-06698; CR-WF3-2018-

06727; CR-WF3-2018-07103; CR-WF3-2018-02613; CR-

WF3-2018-02838

Miscellaneous

WSF-026

Locked and Alarmed Weekly Test Forms

WSF-028

Intrusion Detection System Performance Test Form

Procedures

EN-NS-212

Weapons Maintenance Accountability Program

006

PS-012-109

Security Equipment Inspection and Testing

PS-012-109-01

Turnstyle Test

PS-012-109-02

Door Testing

PS-012-109-03

Intrusion Detection System Testing

PS-012-109-04

Protected Area Active Vehicle Barrier Testing

PS-012-109-05

Metal Detector Testing

PS-012-109-06

Explosive Detector Calibration

PS-012-109-07

X-Ray Device Testing

PS-012-109-08

Protected Area Equipment Tamper Test

PS-012-109-09

Protected Area Barrier Inspections

PS-012-109-14

SOCA Equipment Tamper Test

Self-Assessments EN-LI-104

IP 71130.04 Equipment Performance, Testing and

Maintenance

01/20/2020

QA-16-2019-W3-

Security Quality Assurance Audit Report

2/10/2019

71130.07

Corrective Action

Documents

Resulting from

Inspection

CR-WF3-2020-03649; CR-WF3-2020-03646; CR-WF3-2020-

03661; CR-WF3-2020-00054

08/04/2020

Miscellaneous

Semi-Automatic Low light rifle qualification course

07/22/2020

Semi-Automatic Daylight Rifle Qualification Course

07/22/2020

Semi-Automatic Low light Handgun Qualification Course

07/22/2020

WF3 Tactical Course of Fire

10/30/2019

Semi-Automatic daylight Handgun Qualification

05/31/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Tactical Course of fire methodology

10/20/19

FLP-SEC-

BEARCAT

Bear Cat Armored Vehicle Lesson Plan

Training Records

Various Security Officers, Supervisors and Trainers

Procedures

EN-NS-207

Security Range Instruction

EN-NS-231

Protected Area Search

EN-NS-300

Security Training

EN-NS-304

Security On the Job Training, Task Performance Evaluation

and Training Exemptions

09