ML20138H855: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 32: Line 32:
In the Matter of                          )          Docket Nos. 50-327 Tennessee Valley Authority                )                      50-328 In accordance with 10 CFR Part 50.90, we are enclosing 40 copies of revised l      pages to previous requests for amendments to operating Itcenses OPR-77 and l
In the Matter of                          )          Docket Nos. 50-327 Tennessee Valley Authority                )                      50-328 In accordance with 10 CFR Part 50.90, we are enclosing 40 copies of revised l      pages to previous requests for amendments to operating Itcenses OPR-77 and l
DPR-79, to change the Sequoyah Nuclear Plant units 1 and 2 technical specifications. These revised pages address comments from Melante Miller of your staff and correct inadvertent errors as described in the enclosures.
DPR-79, to change the Sequoyah Nuclear Plant units 1 and 2 technical specifications. These revised pages address comments from Melante Miller of your staff and correct inadvertent errors as described in the enclosures.
Enclosure I provides a description of editorial changes to our January 25, 1984 letter from L. M. Mills to E. Adensam (TVA-SQN-TS-52).
Enclosure I provides a description of editorial changes to our {{letter dated|date=January 25, 1984|text=January 25, 1984 letter}} from L. M. Mills to E. Adensam (TVA-SQN-TS-52).
Enclosure 2 provides a description of editorial changes to our October 2, 1984 letter from L. M. Mills to E. Adensam and our September 27, 1985 letter from R. H. Shell to E. Adensam (TVA-SQN-TS-60).
Enclosure 2 provides a description of editorial changes to our {{letter dated|date=October 2, 1984|text=October 2, 1984 letter}} from L. M. Mills to E. Adensam and our {{letter dated|date=September 27, 1985|text=September 27, 1985 letter}} from R. H. Shell to E. Adensam (TVA-SQN-TS-60).
Enclosure 3 provides a description of editorial changes to our October 22, 1984 letter from L. M. Mills to E. Adensam (TVA-SQN-TS-61).
Enclosure 3 provides a description of editorial changes to our {{letter dated|date=October 22, 1984|text=October 22, 1984 letter}} from L. M. Mills to E. Adensam (TVA-SQN-TS-61).
Enclosure 4 provides a description of editorial changes to our November 7, 1984 letter from R. H. Shell to E. Adensam (TVA-SQN-IS-62). These revised pages add a statement to clarify LCO 3.8.3.1, " Containment Penetration Conductor Overcurrent Protective Devices."
Enclosure 4 provides a description of editorial changes to our {{letter dated|date=November 7, 1984|text=November 7, 1984 letter}} from R. H. Shell to E. Adensam (TVA-SQN-IS-62). These revised pages add a statement to clarify LCO 3.8.3.1, " Containment Penetration Conductor Overcurrent Protective Devices."
These editorial changes, clarifications, and typographical error corrections are consistent with the intent of our original submittals, and the previously submitted justifications and no significant hazards consideration determinations remain applicable. The review by the Nuclear Safety Review Board is being performed concurrent with your review.
These editorial changes, clarifications, and typographical error corrections are consistent with the intent of our original submittals, and the previously submitted justifications and no significant hazards consideration determinations remain applicable. The review by the Nuclear Safety Review Board is being performed concurrent with your review.
;                B512170353 851209 PDR l                        ADOCK OSOOOg7E                                  NO Ok #c $
;                B512170353 851209 PDR l                        ADOCK OSOOOg7E                                  NO Ok #c $

Latest revision as of 01:24, 13 December 2021

Forwards Revised Tech Specs Re Radiation Monitoring Instrumentation & RCS for Application for Amends to Licenses DPR-77 & DPR-79.Revs Address M Miller Comments & Correct Inadvertent Errors & Typos
ML20138H855
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/09/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20138H860 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8512170353
Download: ML20138H855 (2)


Text

r

! TENNESSEE VALLEY AUTHORITY l

l CH ATTANOOGA. TENNESSEE 37401 l SN 1578 Lookout Place l

December 9, 1985 l.

Olrector of Nuclear Reactor Regulation Attention: Mr. B. Youngblood, Project Olrector

! PHR Project Directorate No. 4 Olvision of Pressurized Water Reactors (PWR)

Licensing A U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Youngblood:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 In accordance with 10 CFR Part 50.90, we are enclosing 40 copies of revised l pages to previous requests for amendments to operating Itcenses OPR-77 and l

DPR-79, to change the Sequoyah Nuclear Plant units 1 and 2 technical specifications. These revised pages address comments from Melante Miller of your staff and correct inadvertent errors as described in the enclosures.

Enclosure I provides a description of editorial changes to our January 25, 1984 letter from L. M. Mills to E. Adensam (TVA-SQN-TS-52).

Enclosure 2 provides a description of editorial changes to our October 2, 1984 letter from L. M. Mills to E. Adensam and our September 27, 1985 letter from R. H. Shell to E. Adensam (TVA-SQN-TS-60).

Enclosure 3 provides a description of editorial changes to our October 22, 1984 letter from L. M. Mills to E. Adensam (TVA-SQN-TS-61).

Enclosure 4 provides a description of editorial changes to our November 7, 1984 letter from R. H. Shell to E. Adensam (TVA-SQN-IS-62). These revised pages add a statement to clarify LCO 3.8.3.1, " Containment Penetration Conductor Overcurrent Protective Devices."

These editorial changes, clarifications, and typographical error corrections are consistent with the intent of our original submittals, and the previously submitted justifications and no significant hazards consideration determinations remain applicable. The review by the Nuclear Safety Review Board is being performed concurrent with your review.

B512170353 851209 PDR l ADOCK OSOOOg7E NO Ok #c $

g r=- me.vmew mr k*e 9

% isJ0f' "" "

unatu, C:l 00ni' Ab'I m e . , 0 -, ,- i . . . .,

,g -

Ofrector of Nuclear Reactor Regulation December 9, 1985 If you have any questions concerning this matter, please get in touch with Everett Whitaker at FTS 858-8090.

Very truly yours, TENNESSEE VALLEY AUTHORITY

.> A w J.W.Hufhak alager of Licensing Sworn o nd subscri d before me this day of L aft /]/u l985.

i lNIY Notary Public ke My Commission Expires ( '

Enclosures cc: U.S. Nuclear Regulatory Commission (Enclosures)

Region II Attn: Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l

.