ML20204E825

From kanterella
Jump to navigation Jump to search
Forwards Sequoyah Nuclear Plant,Four Yr Simulator Test Rept for Period Ending 990321, in Accordance with Requirements of 10CFR55.45
ML20204E825
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/05/1999
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204E831 List:
References
NUDOCS 9903250145
Download: ML20204E825 (2)


Text

-

i y , 7 -e

.- RIA Tennessee Valley Authonty Post Office Box 2000. 3oddy-Datsy Tennessee 37379 March 5, 1999 Director, Office of Nuclear I Reactor Regulations 10 CFR 55.45 j U.S. Nuclear Regulatory Commission >

l ATTN: Document Control Desk l Washington, D.C. 20555 1

Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SF.QUOYAH NUCLEAR PLANT (SQN) - UNITS 1 AND 2 - SIMULATOR CERTIFICATION REPORT In accordance with the requirements of 10 CFR 55.45, TVA is providing the Simulator Certification Report. If you have any questions concerning this matter, please telephone me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely P-- " alas .

Licensing and Industry Affairs Manager Enclosure cc: See page 2 k

. ,y,GQ.10 c3

~

9903250145 990305

, PDR ADOCK 05000327 '

R pgg ..

&_- )

T

, ~

U.S. Nuclear Regulatory Commission i ,. Pqge 2 l March 5, 1999 cc (Enclosure):

Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Roat Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-3415 l

f l

i