05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)
ML20206Q879
ML20207A572
ML20195B363
ML20195E931
ML20195E952
ML20195G182
ML20196G180
ML20196G788
ML20196J826
ML20209E407
ML20196K038
ML20210J109
ML20210B252
ML20211B966
ML20210G530
ML20210L161
ML20210L429
ML20210Q501
ML20211A192
ML20210V147
ML20211A185
ML20211F889
ML20211G588
ML20211N568
ML20216F544
ML20211Q031
ML20212A163
ML20212F075
ML20212F450
ML20217A945
ML20216J935
ML20212M108
ML20217C710
ML20212J598
ML20217B843
ML20217B298
ML20217G114
ML20217J415
05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project
05000328/LER-1998-002, Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on B Phase Main Transformer
ML20195G570
ML20195E499
ML20195H789
ML20196F984
ML20197J554
ML20198D547
05000327/LER-1998-004, Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval
ML20198S714
05000327/LER-1997-013-02, Forwards LER 97-013-02 Re Addl Conditions Identified During Performance of Corrective Actions.Details Added to Revs for Two Fuses,Not Included in Surveillance Program
ML20202A714
ML20207J117
ML20207E685
ML20204E825
ML20204H016
ML20205B109
ML20205S589
ML20206C654
ML20209J039
ML20206J206
ML20206K627
ML20206M934
05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)
ML20206Q879
ML20195B363
ML20195E952
ML20195G182
ML20196G180
ML20196G788
ML20196K038
ML20210J109
ML20210G530
ML20210L161
ML20210L429
ML20211A192
ML20211A185
ML20211F889
ML20211N568
ML20212A163
ML20216J935
ML20217C710
ML20217B843
05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project
1 SAFEGUARDS INFORN ASON TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 6N 38A Lookout Place MAY 291990 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
s RESPONSE TO NOTICE OF VIOLATION 50-327, 328/90-15-01 Enclosed is TVA's response to B. A. Wilson's letter to 0. D. Kingsley,-Jr.,
dated April 26, 1990, which transmitted'the subject notice.of violation, 9 provides TVA's response to the notice of= violation. ' Summary i
statements of commitments contained-in this submittal are provided in' Enclosure.2.
The enclosed information is being sent by registered.-mail.
The signed-receipt signifies that you have received this information and acknowledge that.it contains safeguard material and should be withheld from public disclosure'as defined by 10 CFR 73. 21.
If you have any questions concerning this submittal please-telephone M. A. Cooper at (615) 843-6651.
-)
i Very truly yours, TENNESSEE VALLEY A'UTHORITY k$'^
W SEN ~
f Mark O. Medford, Vice President l
Nuclear Technology and Licensing 1
Enclosures cc: See page'2
_JA. (lss24 dub ]
yzn l
SA72 GUARDS INFO:RMA1 ON V 9006020254 9oc529
-(fDn 4 DOCK 0500c327 PDC An Equal opportunity Employer:
l
., U.S. Nuclear Regulatory Commission bk[h kh}hhh cc:
Ms.'S. C. Black, Assistant Director (Enclosures) for Projects TVA Projects Division U.S. Nuclear Regulatory Commission l
Sequoyah' Nuclear Plant 2600 Igou Ferry Road-Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Assistant Director-(Enclosures) for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 I